Uttar Pradesh Housing And Development Board Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Uttar Pradesh Housing And Development Board - UPAVP Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date6 Jul 2024
Closing Date26 Jul 2024
Tender Amount₹ 26,69,724 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Centering and shuttering including struting, proping etc and removal of form work for Foundations, footings, bases for columns.

16.5

3052

185

... More
Class-150 B/W in 1:6 cement & coarse sand F.M. 1.5 to 2.0 mortar in foundation & plinth including supply of all material, labour and T&P etc complete as per direction by E/I.

114.42

745903

6519

... More
Providing and laying of Grade-20 R.C.C. work with cement, coarse sand of F.M. 2.20 to 3.60 and 20mm graded stone grit proportion of 1:1.5:3 in Plinth Band excluding supply of reinforcement and its bending but including its fixing and binding the same with 24B.W.G.G.I. binding wire and including necessary centering and shuttering etc and also including supply of all labour material T&P etc. required for proper completion of work. Binding wire will be supplied by the contractor .

14.92

114346

7664

... More
Centering and shuttering including struting, proping etc and removal of form work for Plinth Band & lintel.

179.19

53936

301

... More
Providing and laying of Grade-20 R.C.C. work with cement, coarse sand of F.M. 2.20 to 3.60 and 20mm graded stone grit proportion of 1:1.5:3 in Column excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc and also including supply of all labour material T&P etc. required for proper completion of work. Binding wire will be supplied by the contractor .

1.08

9218

8536

... More
Centering and shuttering including struting, proping etc and removal of form work for Column.

14.31

5580

390

... More
Class 150 brick work (230 mm thick) in 1:6 cement and Hamirpur/Banda sand ( FM 1.5 to 2.0) mortar in super structure above plinth level upto floor two level (upto two storey) including necessary cutting and moulding of brickwork as required and also including supply of all materials, labour and tools and plants etc, required for proper completion of the work.

0.48

3491

7273

... More
Class 150 brick work (115 mm thick) in 1:4 cement and Hamirpur/Banda sand ( FM 1.5 to 2.0) mortar in super structure above plinth level upto floor two level (upto two storey) including necessary cutting and moulding of brickwork as required and also including supply of all materials, labour and tools and plants etc, required for proper completion of the work.

36.99

276278

7469

... More
Providing and laying of Concrete 1:2:4 (1cement : 2 coarse sand : 4 20mm nominal size stone grit ) for fixing of grill excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc and also including supply of all labour material T&P etc. required for proper completion of work. Binding wire will be supplied by the contractor.

5.28

41611

7881

... More
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not wrought to included in overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorized overlapping shall be measured upto floor two level.

23.24

188685

8119

... More
12 mm. cement plaster with in 1:6 cement and Hamirpur / Banda sand ( FM 1.5 to 2.0) mortar, single coat on fair side of single or half brick wall for interior plastering upto floor two level including brick wall for interior plastering upto floor two level including internal rounded angles chamfers, and/or rounded angles not exceeding 80 mm. in girth and finished even and smooth. No. extra for mixing any adhetive.

2157.2

377510

175

... More
Finishing wall with two coat of apex weather coat /equivalent make exterior paint over a priming coat of water proofing cement paint on approved quality such as super snowcem, durocem, super quality of approved shade on undecorated wall surface with surface prepared with white Birla / equivalent putty of approved make to give an even shade after throughly brushing the surface to remove all dirt and remain of loose powdered material and rate is inclusive of cost of all material, labour T&P and curing etc. complete as per direction of E/I.

1682.12

333059

198

... More
Engraving lines in the plaster of outerface well vertically and horizontally to desplay the surface as stonefacing as directed by E/I, including labour and T&P etc required for proper completion of the work. Add for extra labour to all items of plaster.

214.8

6873

32

... More
Mild steel or iron work in small size such as holding down bolts, hold fast, tie rods and angle door chaukhat etc wrought to required form including drilling holes riveting or welding where necessary and their fixing required for proper completion of the work.

3359.31

319134

95

... More
Fixing of steel/ wooden door & chaukhats in proper position at labour rate only below 1.50 sqm.

132

6600

50

... More
Applying 2 coats of Superior enamel paint over one coat of primer over new steel and other metal / wood surface upto 10cm in width or girth or small articles not exceeding 0.10sqm area after and including preparing the surface by thoroughly cleaning-Oil, grease, dirt and other foreign matter and scoured with wire brushes, fine steel wood. Scrapper sand papering and knotting including cost of all materials, labour T&P etc, required for proper completion of work.

110.83

12412

112

... More
Fixing of steel/ wooden door & chaukhats in proper position at labour rate only.(LS)

6

600

100



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.