Uttar Pradesh Housing And Development Board Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh Housing And Development Board - UPAVP Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date27 Nov 2024
Closing Date11 Dec 2024
Tender Amount₹ 1,02,16,000
Costs
EMD
₹ 2,05,000Document Cost
₹ 5,310Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPHDB_977813_1Bid Award Id
ViewTender No
1075/PRO-50E/44 Dt. 22.11.2024Tender Authority
Uttar Pradesh Housing And Development Board ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
M - 150 class brick work in cement and coarse sand (FM 1.75-2.20) mortar in proportion 1:6 in foundation and plinth including supply of all material labour and T&P etc. required for proper completion of work. SOR-2022, S.I. No.-303(a)
277.73
5010
-
... More
2.5 cm. th. D. P. C. with cement concrete consisting of 1 part cement, 1.5 part approved coarse sand and 3 parts approved 10mm. Graded stone grit and including water proofing material as oredered by the Engineer incharge in the proportion as specified by the manufacturer. S.I. No. 361 SOR 2022
381.9
390
-
... More
M - 150 Brick work in 1:6 cement and coarse sand (FM 1.75-2.20) in super structure including necessary cutting & moulding of brick as required thickness of wall not to be less than 1 brick thick including supply of all materials, labour and T&P etc. required for proper completion of work. SOR-2022, S.I. No.[303(a)+309+310
216.98
5770
-
... More
Cement Concrete with 2 cm guage approved stone grit, coarse sand(F.M. 2.20-3.60) & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.[SOR-2022, S.I. No. 279(a)]
21.7
7050
-
... More
M - 150 Brick work in 1:4 cement and coarse sand (FM 1.75-2.20) in super structure including necessary cutting & moulding of brick as required thickness of wall not to be less than half brick thick including supply of all materials, labour and T&P etc. required for proper completion of work. SOR 2022 SI NO (305 (a) +309+310 (a))
43.39
5910
-
... More
12 mm thick plaster with cement and coarse sand of 1.75 to 2.20 fineness modules in 1:6 over brick work minimum thickness not to be less than 1cm. Including supply of all maerials, labour, T&P etc. required for proper completion of the work. [SOR-2022, S.I. No.-13.14 (New Item)
4239.79
180
-
... More
Engraving lines in plaster of outer face wall vertically and horizontally to display the surface as stone facing as directed by the Engineer in charge including supply of all materials, labour, T & P etc. required for proper comletion of the work. [SOR-2017 S.I. No.-598]
390.56
26
-
... More
Providing and Fixing 60mm thick M-30 Grade precast cement concrete jali reinforced with 8 MM dia M.S. Bars as attached drawing, including centering and shuttering, roughening clening, fixing and finishing in cement mortar 1:3 (1 cement : 3 course sand) etc. complete, excluding plastering of the jambs, sills and soffits.
490.37
1247
-
... More
Finishing wall with water proof cement paint of approved make and quality on new work with two coat to give an even shade including a priming coat with cement primer of approved brand and manufacturer exterior primer applied @ 202kg/10 sqm after thoroughluy brushing the surface free from mortar dropping and other foreign matters and sand papered smooth including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. SOR-2022, Sl. No.-660
4482.8
70
-
... More
Part-B (Construction of gate)
-
-
-
... More
Excavation in foundation in ordinary soil (Loam, clay or sand) i/c filling, watering and ramming of excavated earth into the trenches into the space between the building and the sides of foundation disposal of surplus earth as per direction by E/I upto a distance 30 m from the foundation trenches. SOR-2022, S.I. No. 251(a)
22.19
110
-
... More
Cement Concrete with 4 cm Gauge approved Stone ballast,coarse sand (FM 2.20-3.60) & cement in proportion of 8 : 4 : 1 in foundation including supply of all materials, labour and T & P etc. Required for proper completion of the work.SOR-2022, S.I. No. 281
2.45
6100
-
... More
R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in R.C.C. Raft Foundation & Footings excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour, T&P etc. required for proper completion of the work including cost of binding wire. SOR 2022 SI No {287(a)+[279(c)-279]
2.17
8280
-
... More
R.C.C work with cement approved coarse sand (F.M. 2.20 TO 3.60) and 2cm [3/4"] gauge approved stone grit in the proportion 1:1.5:3 in RCC Column excluding supply of reinforcement and its binding the but including its fixing and binding the same with 24 B WG binding wire and including necessary centering and shuttering etc, and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works including cost of binding wire. SOR-2022, S.I. No 289
3.12
9310
-
... More
R.C.C work with cement approved coarse sand (F.M. 2.20 to 3.60) and 2cm gauge approved stone grit in the proportion 1:1.5:3 in RCC Slab excluding supply of reinforcement and its binding the but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc, and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works including cost of binding wire. [SOR-2022, S.I. No. 5.17 New item
3.22
9030
-
... More
M.S./SAIL TMT or Iron work in plain work such as R.C.C. or R.B. work. including bending for proper shape as necessary including bending for proper complition of the work and including supply of steel its wastage bend hooks and authorized over lapping shall be measured and including cost of binding wire. (AR)
8.26
7470
-
... More
M - 150 class brick work in cement and coarse sand (FM 1.75-2.20) mortar in proportion 1:6 in foundation and plinth including supply of all material labour and T&P etc. required for proper completion of work. [SOR-2022, S.I. No.[303+{305(a)-305}]
6.23
5010
-
... More
Cement Concrete with 2 cm guage approved stone grit, coarse sand(F.M. 2.20-3.60) & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. [SOR-2022, 279 (a)
0.25
7050
-
... More
12 mm thick plaster with cement and coarse sand of 1.25 fineness modules in 1:6 over brick work minimum thickness not to be less than 1cm. Including supply of all maerials, labour, T&P etc. required for proper completion of the work. [SOR-2022, S.I. No.-13.14 (New Item)
28.63
180
-
... More
MS or Iron work in heavy size and section such as trusses, bilt up gates, record racks, roof work, Gates etc. including rivetting or welding where necessary and their fixing required for proper completion of the work. (SOR-2022 S.I. No. 503)
13.51
8000
-
... More
Fixing of Main Gate in Position (labour Rate Only) (SOR-2022 S.I. No. 10.26 New item)
7
1000
-
... More
Painting or varnishing work in small areas or new wood /steel work with one coat ( upto one squire meter of ready mixed priming paint and two coat of approved superior quality of ready mixed paint or varnish including suply of all materials, labour, T&P etc. required for proper completion of work . [Paint to be used should be confirm the ISI no. 103 -1950.] SOR-2022, [S.I. No. (641+642)]
15.96
115
-
... More
Part-C (Construction of Footpath)
-
-
-
... More
Excavation in foundation in ordinary soil (Loam, clay or sand) i/c lift upto 1.50M. and lead upto 30M. and including filling, watering and ramming of excavated earth into the trenches into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as per direction by E/I upto a distance 30 m from the foundation trenches. (Where machine can not reache/move). SOR-2022, S.I. No. 251(a)
75.01
110
-
... More
Cement Concrete with 4 cm Gauge approved Stone ballast,coarse sand (FM 2.20-3.60) & cement in proportion of 8 : 4 : 1 in foundation including supply of all materials, labour and T & P etc. Required for proper completion of the work. SOR-2022, S.I. No. 281
75.01
6100
-
... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per Clause 406
117.01
4212
-
... More
M - 150 class brick work in cement and coarse sand (FM 1.75-2.20) mortar in proportion 1:6 in foundation and plinth including supply of all material labour and T&P etc. required for proper completion of work. SOR-2022, S.I. No.[303+{305(a)-305}]
210.01
5010
-
... More
Cement Concrete with 2 cm guage approved stone grit, coarse sand(F.M. 2.20-3.60) & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.{SOR-2022, S.I. No. 279(a)}
30
7050
-
... More
12 mm thick plaster with cement and coarse sand of 1.25 fineness modules in 1:6 over brick work minimum thickness not to be less than 1cm. Including supply of all maerials, labour, T&P etc. required for proper completion of the work. {SOR-2022, S.I. No. 13.14 (New Item)}
900.06
180
-
... More
Supply and laying of 60 mm thick I shaped mechanically compressed interlocking cement concrete paver blocks manufactured by high pressureand control vibration machine having plan dimension [200x(160+120)] mm .The compressive strength of concrete paver block shall not be less than 35 Mpa Grade as per approved design & pattern with base of 50 mm thick local sand including supply all materials, labour, T&P etc. required for proper completion of work. (AR)
1560.1
610
-
... More
Part-D (Supply & Fixing of RCC Benches)
-
-
-
... More
Providing M-30 Graded RCC Banches 3 Seater of 1.50 M Long 45 CM leg back height as per approved drawing & design in fixing with C.C. in 1:2:4 cement, approved coarse sand & 20 mm stone grit and also i/c supply of all material, labour and tools and plants etc. required for proper completion of the works as per direction of Engineer-in-charge (Qty. Park-1, Park-2, Park-3 & Park-4)
191
4800
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements