If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh Housing And Development Board - UPAVP Tender
Civil And Construction
Building Construction
Eprocure
Opening Date19 Jun 2024
Closing Date4 Jul 2024
Tender AmountRefer Documents
Costs
EMD
₹ 12,06,000Document Cost
₹ 8,850Tender Fee
Refer Documents
Summary
69/142 Type 69 Nos Semi Finished Houses
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPHDB_930339_1Bid Award Id
ViewTender No
1325/G-12/30 Dt. 15.06.2024Tender Authority
Uttar Pradesh Housing And Development Board ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and injecting chemical for preconstruction antitermite treatment and creating and chemical barrier under and around the coloumn pits wall trenches basement excavation top surface inplinth filling juction of wall and floor, along the external per metre of binding expansion joints surrounding of pipes and conduct etc. complete (plinth area of the building at ground floor only shall be measurd as per I.S. 6313 (Part II 1981) Alderine emulsifiable concentrate or any other approved material such as Hepthachlor of chlordance will be used. the rate of application of chemical emulsion shall be as follows:- 1) Treatment for massonary and foundation 5 lites per Sqm 2) Back fill in immediate contract with foundation 7.5 lites per sqm
4761
83
395163
... More
12mm thick plaster in 1:3 cement and coarse sand mortar below plinthn i/c water proofing compound.( BASED ONSl. No. 582A)
2005.28
202
406670.78
... More
M-150 class Brick work in 1:6 cement and coarse sand mortar in super structure for one brick thick walls. (Sl No. 303+(305a-305)+309+310)
2233.36
4610
10295789.6
... More
Class M-150 Brick work in 1:4 cement and coarse sand of 1.75 - 2.00 finness modulus mortar in super structure including necessary cutting moulding of brick as required thichkness of walls no to be less than half brick including supply of all materials, labour and T&P etc. required for proper completion of work. (SI No. 305a+309+310A)
235.87
5085
1199398.95
... More
Mild steel or Iron work in heavy sizes such as truses, built up gates,record racks,roof work, gates etc including rivetting or welding where necessary positing. (SI No. 503)
414
6150
2546100
... More
Mild steel or Iron work in heavy sizes such as M.S. gril & stair case railing etc including rivetting or welding where necessary positing. (SI No. 502a)
175.26
6150
1077849
... More
M.S. Iron work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks and authorised overlapping shall be measured and excluding cost of binding wire. (Analysis)
778.32
9432
7341114.24
... More
R.C.C work with cement approved coarse sand (F.M. 2.20 TO 3.60) and 2cm [3/4"] gauge approved stone grit in the proportion 1:1½:3 in lintels of doors and windows excluding supply of reinforcement and its bending the but including its fixing and binding the same with 24 B WG binding wire and including necessary centering and shuttering etc, and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works including cost of binding wire. The rate excludes making of drip course which shall be paid extra. (SI No 283+284a-284)
162.34
6890
1118522.6
... More
R.C.C work with cement approved coarse sand (F.M. 2.20 TO 3.60) and 2cm [3/4"] gauge approved stone grit in the proportion 1:1½:3 in slab excluding supply of reinforcement and its bending the but including its fixing and binding the same with 24 B WG binding wire and including necessary centering and shuttering etc, and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works including cost of binding wire. The rate excludes making of drip course which shall be paid extra. (SI No 284a)
623.29
7300
4550017
... More
12mm thick bearing plaster in 1:6 cement and coarse sand (F.M. 1.25) mortar over brick work minimum thickness not to be less than 1 cm i/c two coat of white washing Including supply of all materials , labour , tools & plants etc. required for proper completion of the work. (SI No 586+(582a-582)+672)
956.8
163
155958.4
... More
12mm thick cement plaster with 1:6 cement and coarse sand (F.M. 1.50-1.75) mortar over brick work minimum thickness not to be less than 1 cm. Including supply of all materials , labour , tools & plants etc. required for proper completion of the work. (SI No (584a-584)+586)
25493.98
140
3569157.2
... More
Providing wall putty on New surface with approval quality material of berger/J.K/Birla or similar make-2 coats. (New Items SI No. 15.22 P-37)
25493.98
67
1708096.66
... More
Finishing wall with two weather coat paint of approved make and quality on new wall with one priming coat to give an even shade including supply of all materials, labour, tools & plants etc. required for proper completion of work (New Items SI No. 15.22 Schedule item 662 ,P-37)
11075.33
98
1085382.34
... More
Painting or varnishing work in small areas or new wood work with one coat priming paint and two coat of approved superior quality of Synthetic Enamel paint including supply of all materials , labour & tools and plants etc. required for proper completion of work . Paint to be used should be confirm the ISI no. 103 -1950. (SI No 641+642)
1206.29
104
125454.42
... More
Same as Item No.19 but for two coat over and i/c priming coat on new iron works. (SI No.644+645)
553.62
89
49272.18
... More
Providing and laying Waterproofing Treatment on roof slabs by surface preparation by V groove cutting and plugging with polymer mortar at junction of slab and parapet wall and providing application of one slurry coat of ISI mark polymer based chemical as per IS 13435 part-3 such as supercreate SB / Warrior / Hydrocrete/ Consild bond or equivalent @ 0.25 Kg. Polymer with 0.50 Kg. cement and unrolling of fibre glass cloth with minimum overlapping of 10 cm. while the slurry coat is in Green condition followed by 2nd coat of IS mark polymer as per IS 13435 part-3 @ 0.25 Kg. polymer mixed with 0.50 Kg. of cement and a protective layer of average 20 mm thick but not less than 10 mm to provide slope in cement mortar 1:4 with of Average 20 mm thick but not less than 10 mm to provide slope in cement mortar 1:4 with Recron 3s, 125gm. mixed with one bag cement of 50 Kg. (1 Cement : 4 Coarse sand with FM 1.75 to 2.00) mixed with ISI mark polymer based bonding agent/ cement modifier such as concrete bond 101/ Worrior / Unibond-Latex/Consild bond or equivalent @ 1 Kg. per bag of cement and 200 ml. ISI mark integral water proofing Admixture as per IS 2645 such as doncrete RMW/ Pidiproof-LW/Liksil-XL/ Cico-super/ Worrior-Mix or equivalent and sandwitched with chicken wiremash. 20 mm average thickness shall include 1st backing coat of 12 mm and 2nd coat of 8 mm thick. Finally finishing the surface with neat cement slurry and making of 300 mm x 300 mm square complete in all respects.
4851.64
745
3617382.78
... More
Cast cement concrete Door sills, chaukhat, boundary post, shelves and similar small work with cement Approved Coarse sand with2 cm graded stone grit in 1:2:4 excluding supply of reinforcement and it's bending but including fixing and binding the same with 24 B.W.G.G.I. Binding wire including supply of all material labour T & P etc.required for proper completion of the work. (SI No 282)
14.02
6170
86503.4
... More
Supply & fixing of 32 mm thick Indian Commercial flush door shutters I.S.I. conforming to I.S. 2202 part1 (1983) excluding necessary fittings . Schedule item No 471(a) Chapter-09
519.54
1300
675402
... More
Approximate cost of ISI marked oxidised iron fittings with screws for door & windows. (Sl. No. 473)
519.54
380
197425.2
... More
Supply and fixing of hexagonal M.S. fan box. (MR)
276
250
69000
... More
Providing and laying of 25mm dia PVC conduct heavy quality ISI mark in slab & wall.MR
12265.44
50
613272
... More
Add extra labour & material for rough face. Plater (sor-2022,596)
10197.59
20
203951.8
... More
Supply and fixing of switch box 200x250x65mm size of approved make of 1.00mm thick ISI mark C.P. Sheet MR
552
350
193200
... More
Supply and fixing of switch box 175x100x65mm size approved make.MR
828
250
207000
... More
COST FOR END WALL (For 12)
Excavation in foundation in ordinary soil (loam clay or sand) i/c lift upto 1.5m and lead upto 30.0m and including filling, watering and ramming of excavated earth into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge upto a lead of 30.0M from the foundation Trenches. (S.I.No. 251)
181.39
90
16325.1
... More
Cement Concrete with 4 cm gauge approved stone ballast, coarse sand and cement in proportion 8:4:1 in Foundation and under floors i/c supply of all materials labour and T&P etc. required for proper completion of the work. (S.I.No. 281)
20.17
4780
96412.6
... More
Class M-150 Brick work in 1:6 cement and approved coarse sand of 1.75-2.00 finness modulus mortar in foundation and plinth including supply of all material labour and T&P etc. required for proper completion of the work. (S.I. No. (305(a)-305)+303)
94.58
4170
394398.6
... More
R.C.C. wor in 1:1½:3 in plinth & Door Bend (As SI No 285)
2.54
7640
19405.6
... More
M-150 class Brick work in 1:6 cement and coarse sand mortar in super structure for one brick thick walls. (Sl No. 303+(305a-305)+309+310)
53.82
4610
248110.2
... More
12mm thick cement plaster with 1:6 cement and coarse sand (F.M. 1.50-1.75) mortar over brick work minimum thickness not to be less than 1 cm. Including supply of all materials , labour , tools & plants etc. required for proper completion of the work. (S.I. No 586)
346.44
140
48501.6
... More
Providing wall putty on New surface with approval quality material of berger/J.K/Birla or similar make-2 coats. (New Items SI No. 15.22 P-37)
346.44
67
23211.48
... More
Finishing wall with three weather coat paint of approved make and quality on new wall with one priming coat to give an even shade including supply of all materials, labour, tools & plants etc. required for proper completion of work. (New Items SI No. 15.22 P-37)
346.44
98
33951.12
... More
M.S. Iron work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks and authorised overlapping shall be measured and excluding cost of binding wire. (Analysis)
3.48
9432
32823.36
... More
COST FOR JOINT EXPANSION WALL (For 9)
Excavation in foundation in ordinary soil (loam clay or sand) i/c lift upto 1.5m and lead upto 30.0m and including filling, watering and ramming of excavated earth into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge upto a lead of 30.0M from the foundation Trenches. (S.I.No. 251)
66.42
90
5977.8
... More
Cement Concrete with 4 cm gauge approved stone ballast, coarse sand and cement in proportion 8:4:1 in Foundation and under floors i/c supply of all materials labour and T&P etc. required for proper completion of the work. (S.I.No. 281)
66.42
4780
317487.6
... More
Class M-150 Brick work in 1:6 cement and approved coarse sand of 1.75-2.00 finness modulus mortar in foundation and plinth including supply of all material labour and T&P etc. required for proper completion of the work. (SI No. (305(a)-305)+303)
42.42
4170
176891.4
... More
R.C.C work with cement approved coarse sand (F.M. 2.20 TO 3.60) and 2cm [3/4"] gauge approved stone grit in the proportion 1:1½:3 in lintels of doors and windows excluding supply of reinforcement and its bending the but including its fixing and binding the same with 24 B WG binding wire and including necessary centering and shuttering etc, and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works including cost of binding wire. The rate excludes making of drip course which shall be paid extra. (SI No 283+284a-284)
0.72
6890
4960.8
... More
Class M-150 Brick work in 1:4 cement and coarse sand of 1.75 - 2.00 finness modulus mortar in super structure including necessary cutting moulding of brick as required thichkness of walls no to be less than half brick including supply of all materials, labour and T&P etc. required for proper completion of work. (SI No. 305+309+310A)
4.3
5085
21865.5
... More
M-150 class Brick work in 1:6 cement and coarse sand mortar in super structure for one brick thick walls. (Sl No. 303+305a-305+309)
30.6
4610
141066
... More
M.S. Iron work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks and authorised overlapping shall be measured and excluding cost of binding wire. (Analysis)
0.99
9432
9337.68
... More
Making expansion joints with 24 gauge 5" wide aluminium sheet & 8" wide Tar felt fixed with Tar mastic in roof or floors, filling joints with approved bituman 30/40 as per direction of the Engineer in charge including supply of all materials, labour, tools & plants etc. Required for proper completion of the work. ( S.I.No 547)
202.5
210
42525