Uttar Pradesh Housing And Development Board Tender

... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

Uttar Pradesh Housing And Development Board - UPAVP Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date30 Nov 2024
Closing Date26 Dec 2024
Tender Amount₹ 79,88,739 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Disposal of extra earth/dismantled material within 10km distance.including loading , unloading & cartage as per direcion by E/I.

691.68

237

163928.16

... More
Providing and laying of cement concrete in 1:1.5:3 (1 cement, 1.5 C.sand, 3, 20mm stone grit) including supply of all materials labour T&P etc.complete with form work as per direction by E/I.,

12

7314

87768

... More
Dismantling of CC Ramp/Floor including disposal of dismantaled material within 10km distance as per direction by E/I

37.35

1309

48891.15

... More
Drain Earth work in excavation in ordinary soil (loam, Clay or sand) i/c lift upto 1.50m and lead upto 30m and including filling watering and ramming of excavaled earth in to the trenches or into the side of foundation trenches or into the plinth and removal and disposal of surplus earth as per direction by E/I.

265.92

156

41483.52

... More
Providing and laying of cement concrete in 1:4:8 (1 cement, 4 C.sand, 8, 40mm stone ballast) including supply of all materials labour T&P etc.complete with form work as per direction by E/I.,

43.1

6099

262866.9

... More
Class 150 Brick Work in 1:6 cement and coarse sand (FM 1.50 to 2.00) mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. required for proper completion of the work & as per direction by E/I.

181.07

6519

1180395.33

... More
12mm thick plaster in 1:6 cement and coarse sand (F.M. 1.50 - 1.75 ) mortar, single coat on fair side of single or half brick wall for interior plastering including internal rounded angles chamfers and / or rounded angles not exceeding 80mm in girth and finished even and smooth No extra for mixing any additive,

892.26

195

173990.7

... More
R.C.C. work with cement approved coarse sand and 20mm gauge stone grit in the proportion of 1:1.5:3 in slabs excluding supply of reinforcement and including necessary centering & shuttering etc and also including supply of all materials, labour and T&P etc. required for proper completion of the work. Binding wire cost being included in the item.

10.94

8536

93383.84

... More
M..S. or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work. as per direction of E/I.

12.89

7560

97448.4

... More
Disposal of surplus earth including loading, unloading cartage and disposal in low lying area as directed by the Engineer-in-charge upto 10 Km within the scheme and from the site of work and also including leveling and dressing of surface in required level and slope.

158.4

237

37540.8



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.