Uttar Pradesh Gramin Awas Parishad Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh Gramin Awas Parishad Tender
Civil And Construction
Eprocure
Opening Date16 Feb 2019
Closing Date21 Feb 2019
Tender Amount₹ 25,65,000
Costs
EMD
₹ 52,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_UPGAP_310480_5Bid Award Id
ViewTender No
142/GAP/2018-19 DT. 15.02.2019Tender Authority
Uttar Pradesh Gramin Awas Parishad ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying in cement concrete 1:4:8 (1 cement, 4 find sand, 8 graded stone ballast aggregate 40 mm Nominal size) including supply of all materials, labour and T&P etc. requried for proper completion of the work and curing coplete, also including cost of form work in foundation and floors.
144.45
-
2950
... More
Class -150 brick work in 1:3 cement and coarse sand of fineness modilus mortar in foundation and plinth including supply of all material, labour T&P etcrequired proper completion of work.
307.36
-
4250
... More
Earthwork in filling or in embarkment in ordinary soil, excavation to be in the form of regular pits not exceeding 1/2 metre (20") in depth and earthwork in emankment to be in 20 cm (8") layers, including ramming & dressing the surface to required levels and slopes and also including 1.5 metre (5Fts) lifts and 30 m. (100") lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30 meters (100 ft.) distance as directed by the Engineer-in-charge.
116.1
-
95
... More
2 cm (3/4") thick cement plaster neat finish in 1:2 consisting of one part of cement and 2 parts of approved coarse sand laid in panels, finished with 3mm. (1/8") floting coat of neat cement or cement and marble dust in ratio of 5:1 including supply of all materials, labour and T & P etc. required for proper completion of the work.
116.1
-
190
... More
Providing and laying cement concrete 1:2:4 (1cement : 2corse sand : 4 graded stone ballast 20mm nominal size) including supply of all materials, labour and T&P etc. required for proper completion of the work and curing complete also including cost of formwork in foundation and floors.
50.83
-
6000
... More
R.C.C. work with cement approved stone grit in the proportion of 1:2:4 in linteles of doors and windows excluding supply of reinforcement and its binding but including its. Fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and T&P etc. required for proper completion of the works. Binding wire cost being included in the item in ground floor.
10.08
-
7375
... More
Mild steel or iron in plain work such as rein-forced concrete or reinforced brick work (when not included in over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage & over lapping & hooks.
988.61
-
54
... More
S/F of Sign board i/c all necessary fitting i/c all material, labour T&P etc. req. for proper completion of the work.
1
-
5000
... More
total in figures
1
-
1
... More
Add GST @ 12%
1
-
1