Uttar Pradesh Expressways Industrial Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh Expressways Industrial Development Authority - UPEIDA Tender
Other Consultancy Services
Consultancy Services
Eprocure
Opening Date4 Mar 2022
Closing DateCancelled
Tender AmountRefer Documents
Costs
EMD
₹ 2,50,000Document Cost
₹ 59,000Tender Fee
Refer Documents
Summary
Selection Of Independent Engineer.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_UPEID_677157_1Bid Award Id
ViewTender No
UPEIDA/2022/2304/Ganga_IE_ITender Authority
Uttar Pradesh Expressways Industrial Development Authority ViewPurchaser Address
-Website
http://http://www.upeida.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
NIT for selection of IE for Ganga Expressway Project (Group-I).
BOQ Items
... More
Sr. Contract Specialist – 1 no.
1
-
-
... More
Resident Engineer - 3 nos.
1
-
-
... More
Highway Design Specialist – 1 no.
1
-
-
... More
Bridge Design Specialist – 1 no.
1
-
-
... More
Sr. Bridge/Structural Engineer – 1 no.
1
-
-
... More
Sr. Quantity Surveyor - 1 no.
1
-
-
... More
Sr. Pavement Engineer–1 no.
1
-
-
... More
Highway Engineer– 3 nos.
1
-
-
... More
Bridges/Structural Engineer – 3 nos.
1
-
-
... More
Material Engineer – 3 nos.
1
-
-
... More
Safety Expert – 1 no.
1
-
-
... More
Environment Expert – 1 no.
1
-
-
... More
Electrical Engineer – 1 no.
1
-
-
... More
Geotechnical Expert – 1 no.
1
-
-
... More
TMS and HTMS Expert – 1 no.
1
-
-
... More
Building Design & Construction Expert – 1 no.
1
-
-
... More
Remuneration for Professional Staff - Sub Professional
-
-
-
... More
Survey Engineer – 3 nos.
1
-
-
... More
Assistant Highway Engineer – 3 nos.
1
-
-
... More
Assistant Bridge Engineer – 3 nos.
1
-
-
... More
Quantity Surveyor - 1 no.
1
-
-
... More
Lab Technician - 3 nos.
1
-
-
... More
Horticulture cum Landscaping - 1 no.
1
-
-
... More
II. Support Staff
-
-
-
... More
Office Manager - 4 nos.
1
-
-
... More
Accountant cum cashier - 1 no.
1
-
-
... More
Steno cum Computer Operator – 4 nos.
1
-
-
... More
Office Boy - 8 nos.
1
-
-
... More
III. Transportation (Fixed rate on monthly rental basis)
-
-
-
... More
Innova (AC) or equivalent (not more than 3 years old)
1
-
-
... More
Bolero (AC) or equivalent (not more than 3 years old)
1
-
-
... More
Bolero for sub professional staff (not more than 3 years old)
1
-
-
... More
IV. Duty Travel to Site (Fixed Costs) (For all Lengths of Projects): Professional & Sub-Professional Staff
-
-
-
... More
Site to Authority HQ for Key Professionals (36 + 12) = 48 Round trips (including Hotel charges, travel costs etc. Complete)
1
-
-
... More
Site to Regional Office for Key Professionals (36 + 24) = 60 Round trips (including Hotel charges, travel costs etc. Complete)
1
-
-
... More
V. Office Rent (Fixed Costs) Minimum 400 sqm area of Office shall be rented as HO during Construction period. During Maintenance Period, the space may be reduced to 200 sqm. In addition to the above, the consultant shall maintain three field offices of minimum area of 200 sqm each during the construction period. The location of the Field offices shall be finalized in consultation with Authority. The Rent cost includes electricity and water charges, maintenance charges, cleaning, repairs etc. complete.
-
-
-
... More
Head Office (36 months for Construction period)
1
-
-
... More
Head Office (24 months for Maintenance period)
1
-
-
... More
Field Office (3 X 36 months for Construction period)
1
-
-
... More
VI. Office Supplies, Utilities and Communication (Fixed Costs)
-
-
-
... More
Office Supplies
1
-
-
... More
Drafting Supplies
1
-
-
... More
Computer Running Costs
1
-
-
... More
Domestic and International Communication
1
-
-
... More
VII. Office Furniture and Equipment (Rental) The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input) , PCs with latest configuration with licensed softwares (5 Nos), laser Printers (2 no., 30 ppm, A3 size) etc., binding machine (1 no.), plotter A0 size, Smart screen, AC (4 no., 1.5 Ton), Water Coolers (as required) etc.
-
-
-
... More
Construction Period
1
-
-
... More
Maintenance Period
1
-
-
... More
VIII. Reports and Document Printing
-
-
-
... More
Monthly reports (Design and Construction) - 60 X 3 copies
1
-
-
... More
Half yearly Reports - 10 X 3 copies
1
-
-
... More
Various others reports as provided in the Concession Agreement such as Completion Report - 5 X 3 copies
1
-
-
... More
IX. Road Survey Equipment
-
-
-
... More
Surface defects detection and roughness measurement using Network Survey Vehicle
1
-
-
... More
Pavement Strength measurement using FWD ( During O&M)
1
-
-
... More
Bridge inspection using Mobile Bridge Inspection Unit
1
-
-
... More
Road signs inspection using Retro reflectometer
1
-
-
... More
X. Contingencies
-
-
-
... More
A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. The provisions of Contingency shall be operated with the specific approval from the Competent Authority in Uttar Pradesh Expressways Industrial Development Authority, Uttar Pradesh.
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements