Uttar Pradesh Expressways Industrial Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Uttar Pradesh Expressways Industrial Development Authority - UPEIDA Tender

Works
Civil And Construction
Software and IT Solutions
Consultancy Services
Civil And Architectural Services
Eprocure
Opening Date24 Jun 2024
Closing Date29 Aug 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Backup Video Recording (Only Incidents) Server with 240 TB storage

1

-

-

... More
Facility Monitoring System Controller

1

-

-

... More
Graphic Display (Laser DLP/ 0.9mm Pixel LED) with controller and software

1

-

-

... More
Internet & SMS Server

1

-

-

... More
Fiber Channel Host 16 GB

1

-

-

... More
Command Centre Operator Console with 4 nos. 21 inch touchscreen monitors

4

-

-

... More
USB joystick to control PTZ cameras

4

-

-

... More
Emergency Telephone (helpline) console with 2 nos. 21 inch touchscreen monitors

1

-

-

... More
Facility Monitoring System Console with 2 nos. 21 inch touchscreen monitors

1

-

-

... More
Operations Laser Printer (Colour) A3 All-in-one

1

-

-

... More
Operations Laser Printer (Black)

1

-

-

... More
Firewall, IDS, IPS, Core Switch, and Network Equipment (Bidder shall attach the breakup of Network equipment with unit price of each item)

1

-

-

... More
Aadhar enabled Biometric Fingerprint machine

2

-

-

... More
Power Distribution Board (PDB)

1

-

-

... More
Rack 19"

2

-

-

... More
Interior works of TMC including Operation room, Server Room, UPS room, Incharge cabin, pantry toilet, etc. with complete technical furniture, indoor lighting, Audio/Mic system, Public Announcement / addressing system, CCTV system (control room, server room UPS room etc.), IP Phones (4 nos.), Access Control system with smart card and biometrics, power backup system including sufficient DG, Firefighting, alarm, extinguishers, etc. PRI Line, 32 MBPS Internet & MPLS Connectivity with TMC, Sub-centres, IMS, etc.

1

-

-

... More
Maintenance Equipment as per ToR and site requirement

1

-

-

... More
Surge Protection Device (SPD)

2

-

-

... More
Lighting protection

2

-

-

... More
Advance Driver Advisory System (ADAS), GPS tracker, industrial grade rugged (Waterproof) dashboard mounted 10" Tablet, Dashcam with video calling feature, body cam, rear & front view varifocal cameras with vandalproof housing (mounted on vehicle), LPU, storage, UPS, live monitoring provision of cameras from TMC & sub-centres, etc. for patrol, ambulance, and maintenance vehicles.

40

-

-

... More
Incident Monitoring System (IMS): Workstation, All-in-one color A4 printer, 100" 4K UHD interactive LED display (commercial grade), UPS as per requirement, IP Phone, Networking devices, switches, CCTV camera,DG of suitable rating as per requirement, 32 MBPS Internet & MPLS Connectivity with TMC, Sub-centres, IMS, etc.

1

-

-

... More
Sub-Centres (One each at Pkg-1(Km 5+100), Pkg-2(Km 86+640) & Pkg-4 (Km174+000))

-

-

-

... More
Sub Centre / Central Processing Server in hot standby configuration (Primary + Secondary server)

3

-

-

... More
Video Recording Server with storage (minimum 360 TB)

6

-

-

... More
Backup Video Recording (Only Incidents) Server with 240 TB storage

3

-

-

... More
Facility Monitoring System Controller

3

-

-

... More
Internet & SMS Server

3

-

-

... More
Graphic Display (Laser DLP/0.9mm Pixel LED) for each Sub Centre with controller & software

3

-

-

... More
Emergency Telephone (helpline) console with 2 nos. 21 inch touchscreen monitors

3

-

-

... More
Sub Centre Operator Console with 4 nos. 21 inch touchscreen monitors

6

-

-

... More
USB joystick to control PTZ cameras

6

-

-

... More
Facility Monitoring System Console with 2 nos. 21 inch touchscreen monitors

3

-

-

... More
Operations Laser Printer (Black)

3

-

-

... More
Firewall, IDS, IPS, Core Switch, and Network Equipment (Bidder shall attach the breakup of Network equipment with unit price of each item)

3

-

-

... More
Power Distribution Board (PDB)

3

-

-

... More
Rack 19"

3

-

-

... More
Aadhar enabled Biometric Fingerprint machine

4

-

-

... More
Interior works of Sub-Centre including Operation room, Server Room, UPS room, Incharge cabin, pantry toilet, etc. with complete technical furniture, raised floor, indoor lighting, Audio/Mic system, Public Announcement / addressing system, CCTV system (control room, server room UPS room etc.), IP Phones (4 nos.), Access Control system with smart card and biometrics, power backup system including sufficient DG, Firefighting, alarm, extinguishers, etc. PRI Line, 32 MBPS Internet & MPLS Connectivity with TMC, Sub-centres, IMS, etc.

3

-

-

... More
Surge Protection Device (SPD)

6

-

-

... More
Lighting protection

6

-

-

... More
ATMS Software

-

-

-

... More
Central Processing Software Package including Mobile App

1

-

-

... More
Facility Monitoring System Controller Software

1

-

-

... More
Network Management Software (COTS)

1

-

-

... More
Database licenses for all servers (COTS)

1

-

-

... More
Antivirus licenses for all computing devices (servers, workstations, etc.) (COTS)

1

-

-

... More
GIS Application

1

-

-

... More
VAMS Licenses (for minimum of 890 Cameras)

1

-

-

... More
Traffic Monitoring Camera System Equipment (TMCS)

-

-

-

... More
PTZ Camera (including CCTV Controller)

296

-

-

... More
Cabinet

296

-

-

... More
12m Galvenised Pole with 1m arm at 8m with pole mounting arrangement

296

-

-

... More
Motion Detection surveillance camera, hooter alarm with beacon, and all-in-one solar street light

296

-

-

... More
Pole Foundation, PCC, backfilling with sand

296

-

-

... More
Solar System with UPS, Li-on battery for 72 hours backup & Pole mounting with SPD, and lighting protection

296

-

-

... More
Video Incident Detection System Equipment (VIDS) - 50 locations

-

-

-

... More
VIDS Camera - 3 per location

150

-

-

... More
Warning amber lights with hooters and solar with at least 96 hours backup, pole and foundation (10 nos. at each junction/ location)

50

-

-

... More
Local Processing unit (LPU)

50

-

-

... More
Cabinet

50

-

-

... More
12m Galvanised Pole with 1m arm at 8m with pole mounting arrangement.

50

-

-

... More
Motion Detection surveillance camera, hooter alarm with beacon, and all-in-one solar street light

50

-

-

... More
Solar System with UPS/PCU, 72 hour battery backup & Pole mounting with SPD, and lighting protection

50

-

-

... More
Pole Foundation, PCC, backfilling with sand

50

-

-

... More
Variable Message Sign Equipment (VMS)

-

-

-

... More
Portable VMS (2m x 2m) with mounting arrangement

4

-

-

... More
Solar Power with Batteries for 12 hours backup for Portable VMS

4

-

-

... More
UPS and Power system

-

-

-

... More
Uninterruptible Power Supply (UPS) For TMC (20KVA Online Double Conversion UPS -IGBT based arranged in parallel configuration -Warranty 5 years)

1

-

-

... More
Battery backup -34560 VAH for Each UPS -Warranty 5 years-100AH X 20nos.

1

-

-

... More
Racks Links DC cable

1

-

-

... More
Uninterruptible Power Supply (UPS) For Sub-Centre (10KVA Online Double Conversion UPS -IGBT based, arranged in parallel configuration -Warranty 5 years)

3

-

-

... More
Battery backup -24000 VAH for Each UPS -Warranty 5 years-100AH X 20nos.

3

-

-

... More
Racks Links DC cable

3

-

-

... More
Power Distribution Board (Essential & Critical Supply)

4

-

-

... More
Vehicle Speed Detection System Equipment (VSDS) - 14 locations (LHS + RHS)

-

-

-

... More
ANPR for 4 lanes (6 Cameras - one each for 2 lanes in each direction + shoulder)

42

-

-

... More
Local Processing Unit (LPU)

14

-

-

... More
Speed Detection Radar (upto 90m range) for 2+1 lanes (one in each direction for 2+1 lanes))

14

-

-

... More
Solar Powered (off-grid) Vehicle Actuated Speed Display (VASD) System (one each for 2+1 lanes in each direction)

42

-

-

... More
Motion Detection surveillance camera, hooter alarm with beacon, and all-in-one solar street light

14

-

-

... More
Gantry (including manufacturing and galvanizing) & pile foundation

14

-

-

... More
Cabinet

14

-

-

... More
Solar System with UPS, Li-on battery for 72 hours backup, Pole, cabinet for VSDS, with SPD, and lighting protection

14

-

-

... More
Digital Transmission System

-

-

-

... More
24 core Primary OFC Cable + all accessories for OFC etc.

325600

-

-

... More
6 core Auxiliary OFC Cable + all accessories for OFC etc.

9100

-

-

... More
40mm HDPE PLB duct + all accessories for duct (push fit coupler, spacers, etc.)

325600

-

-

... More
32 mm HDPE PLB duct (for auxiliary OFC) + all accessories for duct (push fit coupler, etc.)

9100

-

-

... More
Duct pulling, cable pulling, splicing, chambers lowering, sand, route markers at every 200 meters, etc.

296000

-

-

... More
Chambers (Handhole HH-1) (with concrete cover) with reinforcement and M20 grade. 1 nos. at every equipment location

364

-

-

... More
Chambers for primary OFC (Manhole MH-1) (with concrete cover) with reinforcement and M20 grade at every 500 meters

592

-

-

... More
Crossing of OFC & duct through HDD from equipment location on main carriageway to service road/utility corridor (primary OFC cable location))

9100

-

-

... More
Installation, and Testing

-

-

-

... More
Installation, and Testing

1

-

-

... More
Spares (5 years)

1

-

-

... More
Technical Staff

-

-

-

... More
System Maintenance Engineer/ Manager (1 per Shift + Reliever (At TMC))

240

-

-

... More
System Maintenance Technicians (4 per Shift + Relievers)

960

-

-

... More
Maintenance Vehicle with Driver and helper (1 at TMC & 1 at each sub-centre)

240

-

-

... More
Man hoist vehicle with Driver and helper (1 at TMC)

60

-

-

... More
Overhead cost (incl. tools, and other operations cost etc)

60

-

-

... More
Control Room Operations Staff

-

-

-

... More
Chief Manager for Operation and Maintenance (1 at TMC)

60

-

-

... More
Traffic Management Engineer/ Manager (1 at TMC & each Sub-centre + relievers)

300

-

-

... More
Asst Manager - Operations (1 at TMC & each Sub-centre + relievers)

300

-

-

... More
Control room operators (5 per Shift at TMC & 3 at each sub-centre + Relievers)

2940

-

-

... More
Support Staff (In General Shift at TMC and Sub-centres)

240

-

-

... More
Office Assistant (1 at TMC & 1 at each Sub-centre per shift + relievers)

840

-

-

... More
Security Guard (1 at TMC & 1 at each Sub-centre per shift + relievers)

840

-

-

... More
Overhead cost (Incl. office maintenance, recurring charges, DG charges, electricity bill, operations cost, etc.)

60

-

-

... More
Note

-

-

-

... More
All values must be verified before Submission, in case of any errors/ incompleteness, Contractor shall be responsible, and no additional items/ claims for the payments shall be entertained.

-

-

-

... More
Above breakup of rates is only for determining the total bid value for shortlisting the successful bidder for work award. However actual payments shall be regulated based on the actual number of equipment / sub-systems installed at the stretch where services as per ToR were delivered during the billing period.

-

-

-

... More
UPEIDA reserves the right to order for increased or decreased quantity by up to 100% of items or services without any change in price quoted by the Contractor. If the quantity increased/decreased beyond the abovementioned limit, the item and/or services shall be executed on mutually agreed rates.

-

-

-

... More
I/We do hereby confirm that my/ our bid price includes all statutory taxes/ levies but excluding GST. I/ We also declare that any tax, surcharge on tax and / or any other levies, if altered in future and payable under the law, the same shall be borne by me/ us.

-

-

-

... More
The quoted rates for all items shall remain unchanged for entire term of the Contract Agreement. In case there is increase or decrease in any item(s) to be installed is requisitioned by UPEIDA, then the payments to the Contractor shall get increased or decreased, as the case may be, in reference to the quoted price in the financial bid and/or as assessed by the Authority’s Engineer in case item is not mentioned in the financial bid. However, in case UPEIDA decides to increase the term of the Contract pursuant to clause 7(b) contemplated in the draft Contract Agreement, in that case payment of O&M will be revised as per clause 11 of the draft Contract Agreement.

-

-

-

... More
This bid is valid for a period of 120 calendar days from the bid due date. However, UPEIDA reserves the right to increase the validity period before the expiry of the validity period of 120 days.

-

-

-

... More
I/ We, understand that the (a) applicable GST shall be reimbursed by UPEIDA separately on production of proof of payment and CA certificate; and (b) TDS will be deducted against payments as per Applicable Law. (c) In case of any difference in figures and words, the amount mentioned in words will prevail.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.