Uttar Pradesh Engineering And Labour Cooperative Federation Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Uttar Pradesh Engineering And Labour Cooperative Federation Limited - UPELCFED Tender

Works
Civil And Construction
Eprocure
Opening Date30 Aug 2018
Closing Date6 Sep 2018
Tender Amount₹ 3,31,131 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supploy of 110mm dia PVC pipe 6kg/cm2

60

10500

175

... More
Supply ofr 110 mm dia strainer with blind pipe

6

1980

330

... More
Supply of spreding of course sand & putting it up to the strainer around tyhe3 satrainer

1

576

576

... More
Supply of application of the bentonite slurry between bore hole and casing pipe

1

263

263

... More
Supply of 32 mmj medium quality G.I. pipe

24

4110

171.26

... More
Digging work for water and arrengment of tripod for boring

1

252

252

... More
Boring 150mm dias 0-30 M

30

5820

194

... More
Boring 150mm dias 30-60 M

30

6300

210

... More
Lowering of PVC pipe assembly blind pipe strainer into borehole 0-30

30

480

16

... More
Lowering of PVC pipe assembly blind pipe strainer into borehole 30-60 M

30

510

17

... More
Grauting work for fixing the assembly (1:4:8)

0.04

282

7057.49

... More
Construction and development

1

80

80

... More
testing

1

1462

1462

... More
Construction of 100mm wide C.C. drain as per departmental dressing in proportion of 1:2:4 cement coars sand and nominal (10mm-1 part & 20mm 3 part) stone grit over base concrete ihn proportion of 1:4:8 cement, coarse sand and 40mm nominal grite.

10

9000

900

... More
Disinfection in foundation in ordinary soil (loam clay or sand) lift up to 50m filling watering of excavated earth into trenches or into the space between the builiding and the side of foundation trenches or into the plinth and disposal of surplus earth upto a distance of 50m from thye center of the foundfation trenches as pr direction of etc.

1.8

240

133.49

... More
Concrete with cement coarse sand & 40mm nominal bsize stone ballast in proportion of 1;4;8 in foundation including supply of material, labour T&P etc. requirment for proper complestion of the work.

0.45

3175

7057.49

... More
First class bricks work in 1:6 cement and coarse sand mortar in foundation and plinth including supply of all material labour T&P etc. requirment for proper coplestion of work.

1.35

8119

6014.2

... More
40mm thick D.P.C in cement concrete consisting of 1:2:4 cement coarse sand and graded stone aggregate 12.5mm nominal size and including water proofing (ISI MARK) material in the proportion as specified by the manufacture including etc. requirment for proper complestion of the work

3

1245

415.1

... More
First class bricks work in 1:6 cement and coarse sand mortar in super structure including necessery cutting and moulding of bricks as requirment for proper coplestion of work.

4.12

27018

6558

... More
40mm thick of 1:2:4 cement coarse sand and 20mm nominal sizestone grit laid in panel and finished with 3mm floating caot of neat cement including 75mm thick base concrete consisting of cement coars sand and etc.

3

2200

733.53

... More
12mm thick plaster above plinth in 1:6 cement and banda(ken) hamirpur (betva) fine sand (F M not less than 1.25mm) over brick work minimum thickness not to be less than 10mm including supply of all material,labour T&P and Rwquired for proper complete.

10.08

1703

169

... More
R.C.C work (with use of cc mixer) inj 1:1:53 proportionh of cement coarse sand and 20mm nominal sizestone grit with proper finishing including supply pof all material T&P and kachcha plaster on wooden plank.

1

1900

1900

... More
Sun Shed s & slab

0.55

7018

12854.05

... More
Mild steel work RCC work wrought to required shape as necessary including supply of steel and wastage etc for proper complection of the work

0.44

3518

7997

... More
The inner finish should be two coat of oil bound distemer 1st quality such bas bison distemper tractor distemper with one coat of priming coat over smoothy base of cement of based wall putty such as birla j.k. waLL PUTTY OVER THE PLASTERED WALL SURFACE TO P.

10.08

1529

151.7

... More
Supply and installation of MS flat fabricated stand in the inner wall of the surface

1

500

500

... More
Mortar 1:3 (1cement, 3coarse sand), including pointing in white cement with an admixtiure of pigment to match the sone shade 8mm thick mirrior polished machiene cut edge for granite stone of any colour and shade.

13.44

23184

1725

... More
Supply of installation on the work site (includin freight) of triple layer water tank capacity 500ltr

1

9000

9000

... More
Supply and fixing iron jali around of coolar water including labour and cost indention all complete as per direction of etc.

1

35000

35000

... More
Supply of 20mm OD MDPE pipe PN-6 including all fittings labour all complete as per direction of etc

25

875

35

... More
Laying and carting opf 20mm OD MDPE pipe PN-6 including all fittings labour all complete as per direction of etc

25

375

15

... More
Supply and installation of fabricate MS gril on the front of the water cooler including two coats of anticorrosion pant of approved quality after one coat of primer as per direction of etc.

2.52

3661

1453.17

... More
Supply and fixing inaugration stone including labour and coast of indention all complete as per direction of etc.

1

3000

3000

... More
Sign Board

1

4000

4000

... More
Cost of electrification 5% of above items

1

15768

15768.15



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.