Uttar Pradesh Cooperative Sugar Factories Federation Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh Cooperative Sugar Factories Federation Limited Tender
Machinery and Tools
Eprocure
Opening Date8 Aug 2024
Closing Date16 Aug 2024
Tender AmountRefer Documents
Costs
EMD
₹ 10,000Document Cost
₹ 590Tender Fee
Refer Documents
Summary
Competative E-bidding For Suplly Of Boiler Fabrication And Erection Work Services For Season 2024-25
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_KSCMS_944460_1Bid Award Id
ViewTender No
KSCM/609/C/GM/2024-25Tender Authority
Uttar Pradesh Cooperative Sugar Factories Federation Limited ViewPurchaser Address
-Website
http://http://www.upsugarfed.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Relief Tube size 76.2mm O.D.Dismentaling of old tubes Fabrication of new tube as per drg./sample & sucessfuly hydroulic testing at 32 Kg/Cm²
-
-
-
Roof tube size 70.00 mm O.D. Dismentaling of old tubes ii) Fabrication of new tube as per drg./sample & sucessfuly hydroulic testing at 32 Kg/Cm²
-
-
-
Screen Tube size 70mm O.D. (Row no 16-17) Dismentaling of old tubes Fabrication of new tube as per drg./sample & sucessfuly hydroulic testing at 32 Kg/Cm²
-
-
-
Super Heater coil tube size 44.45 mm O.D. Dismentaling of old tubes Fabrication of new tube as per drg./sample & sucessfuly hydroulic testing at 32 Kg/Cm²
-
-
-
Dismentaling, Fabrication and erection of Nipple Size:
1 - 44.45mm OD
2 - 70.00 mm OD
3- 76.20 mm OD
4- 63.50 mm OD
-
-
-
Fabrication of 101.6 mm OD gilled type economizer tube with supply of MS fins as per our sample /drawing (Note: Old flanges will be given by factory)
-
-
-
Fabrication of 101.6 mm OD gilled type economizer tube without supply of MS fins as per our sample /drawing (Note: Old flanges will be given by factory)
-
-
-
Dismentaling of old Air heater tubes of boiler no. 1 & 2, fabrication and erection of new tube with leak proof trial expanded at both ends.
-
-
-
Dismentaling of old Air heater tubes of boiler No. 1 & 2 and fitting the old Boiler tubes as per sample of A.H.T. (63.5 mm O.D.), Fabrication of air heater tubes from old tube and fitting the old tube with leak proof trial.
-
-
-
For 30 Ton Taxmaco make Boilers
-
-
-
Drum to Drum tube size 63.5mm O.D. (Row No 6-13) Dismentaling of old tubes Fabrication of new tube as per drg./sample Errection & sucessfuly hydroulic testing at 32
-
-
-
Side Wall tube size 76.2mm O.D Dismentaling of old tubes Fabrication of new tube as per drg./sample Errection & sucessfuly hydroulic testing at 40 Kg/Cm²
-
-
-
Roof tube size 76.2mm O.D. Fabrication of new tube as per drg./sample Errection & sucessfuly hydroulic testing at 40 Kg/Cm²
-
-
-
Steam Relief Tube size 76.2mm O.D. Dismentaling of old tubes Fabrication of new tube as per drg./sample Errection & sucessfuly hydroulic testing at 40 Kg/Cm²
-
-
-
Dismantling , fabrication & erection of 63.5mm OD Air Heater Tubes with leak proof trial
-
-
-
Down take / cummer tube Drum to side header (6 Nos) Dismentaling of old tubes Fabrication of new tube as per sample with flange Fitting & hydroulic testing
-
-
-
Super heater coils tube size 44.45mm O.D. Dismentaling of coils Fabrication of new coils per drg./sample Errection along with luga/clamps & hydroulic testing at 40 Kg/Cm²
-
-
-
Texmaco make 30 Ton Boiler
-
-
-
Dismentaling Fabrication with welding of MS Flats size 50 mm X 4mm thick (Flats would be supplied by the party) then erection of Economizer coils (26 Nos) size 44.45mm od X 4.06 mm thick (tube material supplied by factory) with hydraulic testing at 36 kg/cm² pressure at our 30 Ton capacity Texmaco boiler. Side plates and cover of economizer chamber will also by fitted by the contractor
-
-
-
Dismentaling Fabrication & Erection of Economizer coils (26 Nos) size 44.45mm od X 4.06 mm thick (tube & m.s.flates supplied by factory) with hydraulic testing at 36 kg/cm² pressure at our 30 Ton capacity Texmaco boiler. Side plates and cover of economizer chamber will also by fitted by the contractor
-
-
-
Machining of cap seat Eliptical
-
-
-
Machining of cap seat Round
-
-
-
Machining of header seat at site Eliptical
-
-
-
Machining of header seat at site Round
-
-
-
Re-threading of cap bolt if required
-
-
-
Dismentalling, fabrication & errection of Nipple of sizes:
1 - 44.45mm OD
2 - 70.00 mm OD
3- 76.20 mm OD
4- 63.50 mm OD
-
-
-
Reclaimation of 63.5 mm OD drum to drum tube. The work include dismantling of Old Tubes with bends, fabrication of new bends & wielding in Old Tubes. After that fitting of repaired tube with Hydraulic Testing at 32 Kg/cm²
-
-
-
Supply of Air heater tube plate of size 1150 mm x 810 mm thickness 6mm with 153 holes of 63.5 mm tube size
-
-
-
Dismantling of Old Air Heater Tube plate and fitting of new fabricated tube plate as per design /sample
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements