UP State Construction And Infrastructure Development Corporation Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

UP State Construction And Infrastructure Development Corporation Limited - UPSCIDC Tender

Works
Eprocure
Opening Date20 Aug 2021
Closing Date26 Aug 2021
Tender Amount₹ 17,53,030 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
B/W in 1:6 mortar in foundation & plinth

7.15

-

4555

... More
Providing and laying damp proof coarse 40 mm thick with cement concrete 1:2:4 (1 cement:2 corse sand :4 grades stone aggregates 10 mm nominal size) and

3.22

-

285

... More
Bitumen painting

3.22

-

56

... More
B/W in 1:6 mortar in super structure

8.42

-

5045

... More
R.C.C. work in lintel & shunshade door

0.67

-

7910

... More
Slab

1.39

-

8800

... More
M.S.work in reinforcement of R.C.C. work

2.43

-

4815

... More
60mm cement plaster 1:3 (1 cement :3 fine sand) finished with a floating coat of neat cement and thick coat of lime wash on top of walls when dry for

3.43

-

292.14

... More
15mm plaster

92.96

-

135

... More
Supply & filling loose earth in floor

4.2

-

550

... More
C:C in floor & apron in 1:4:8 with 40mm stone ballast

4.2

-

5435

... More
25mm thick C.C. Flooring with 1:2:4 size of tile 600x600

12

-

237

... More
Apron 25mm th.

7.94

-

237

... More
C.C. Skirting with 1:2:4

1.49

-

216

... More
Providing and fixing 100mm thick M.S.sheet door with frame of 40x40x6mm angle iron and 3mm M.S.gusset plates at the junctions and corners all necessary fittings 517 (b)

1.89

-

4288.58

... More
P/F of ''Z'' Section window 502 (b)

39.6

-

57

... More
Oil bound painting

51

-

73

... More
Two coat water proof cement paint out side over one coat white

56.23

-

92

... More
Two coat enamal painting on steel work

5.94

-

71

... More
Brick edgine lengthwise with half brick depth including excavation refilling and disposal of surplus earth lead up to

17.8

-

46.75

... More
Supply & Installation of Solar power plant 5 kw power grid with battery solar wire all necessary items for making connection etc. complete in all respect

5

-

40000

... More
Supply & Installation 500 LPH R.O. plant with water chiller i/c all compl.

1

-

580000

... More
Cost of Solar Street Light (24 Pic.)

24

-

23000

... More
Cost of Sakhta (3 No.) E/W excavation in foundation in ordinary soil clay or soil i/c lift up to 1.50 m. Lead up to 30m. i/c filling, watering, ramming of executed earth comp. of work etc. Sl. No. 251

62.31

-

120

... More
B/W 1st class M-150 sub class A brick work in 1:4 cement and coarse sand mortar Sl. No. 305

26.25

-

4555

... More
R.C.C. work with cement approved coarse sand and 2 cm guage approved stone ballast in the proportion 1:1.5:3 in R.C.C. slab excluding supply of Steel and it's bending but including fixing and binding the same with 24b. W.G.G.I. binding wire and including necessary centering and shuttering etc. and alos including S/o all materials required for proper completion of the work. As per S.I. No. 284A

1.98

-

8800

... More
Mild Steel of Iron work in plain work such as reinforced cement concrete (when not included in over all rate) wrought to required shape as necessary including bending for proper completion of work, supply of steel, all labour etc. required and including wastage bend, hooks and authorised over lapping shall be measured. As per S.I. No. 504 R.C.C. Slab @1.25% volume of concrete

194.28

-

48.15

... More
S/filling of Brick Bats.

40.83

-

1300

... More
Connection of Soak Pit.

6

-

315

... More
S/filling of PVC Pipe 110 mm.

9

-

373

... More
12 mm cement plaster finished with a floating coat of neat cement of mix 1:3 (1 cement : 3 fine sand).

11.01

-

157

... More
Drain Work (10 Rmt.) :- Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50m and lead upto 30m. and including filling, watering and ramming of excavated earth in to the space between the building and side of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by engineer in charge.

3.37

-

115

... More
P.C.C. 1:5:10 C:F/Sand with 40 mm Brick Ballast mortar in foundation i/c S/O all material labour T & P

0.75

-

3380

... More
P.C.C. work ratio (1:2:4) C:C/S:20 mm S/Grit mortar

0.37

-

7500

... More
M-150 brick work in 1:4 cement and C/sand mortar in foundation and plinth including supply of all materials, labour and Tools and Plants etc. required for proper completion of work.

1.75

-

4550

... More
12 mm thick plaster ratio (1:3) C:C/S mortar in celling.

20

-

155

... More
R.C.C. work with cement, approved coarse sand and 2 cm gauge approved stone ballast in the proportion 1:1.5:3 in R.C.C. Slab, excluding supply of steel and its bending but including fixing and binding the same with 24 B. W.G.G.I binding wire and including necessary centering and shuttering etc and also including s/o all materials required for proper comletion of the work.

0.75

-

8790

... More
Mild steel or iron work in plain work such as reinforced cement concrete (when not included in over all rate) wrought to required shape as necessary including bending for proper completion of work, supply of steel, all labour etc. required and including wastage bend, hooks and authorised over lapping shall be measured.

58

-

47



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.