UP State Construction And Infrastructure Development Corporation Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

UP State Construction And Infrastructure Development Corporation Limited - UPSCIDC Tender

Works
Eprocure
Opening Date21 Aug 2021
Closing Date7 Sep 2021
Tender Amount₹ 17,40,552 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
RCR Stone masonry 1:6 Cement & sand mortar in foundation

14.09

-

3465

... More
brick work 1:6 cement & sand work in foundation (303)

4.11

-

5800

... More
Rcc work 1:1.5:3 plinth beam (pg.39)

1.6

-

7155

... More
rainforcement of plenth bar (504)

278.89

-

59.5

... More
supply and filling loose earth in plinth

17.88

-

300

... More
230 mm brick work 1:6 cement&sand in super structure

23.48

-

6365

... More
115 mm brick work 1:4 cement&sand in super structure

3.41

-

6640

... More
20 mm thick bearing plaster 1:3 cement sand mortar neat cemtent finshed(597)

12.73

-

235

... More
Supply & fitting z section window & ventilation weight @35kg/Sqm

202.39

-

94.1

... More
Supply & fitting ms sheet shutter With angle 40x40x5 mm

231.05

-

88.9

... More
R.c.c work 1:1.5:3 cement & sand nominal size 20 mm (284)

6.57

-

7515

... More
20mm plaster 1:3 cement & sand mortar with neat cement (597)

57.11

-

235

... More
12mm plaster 1:6 cement& sand mortar out side (17.58)

88.72

-

130

... More
15 mm plaster 1:6 cement & sand in side(17.59)

110.27

-

165

... More
10 mm celling plaster 1:3 cement sand mortar

42.32

-

175

... More
Plan concrete 1:4:8 cement & sand 40mm stone ballast (281)

5.12

-

4175

... More
25mm 1:2:4 cement & sand nominal size 20mm on floor (14.69)

62.66

-

230

... More
20 mm thick skirting 1:3 cement &sand mortar (597)

7.6

-

235

... More
Supply & fixing glass strip .@2.5 per sqm

123.8

-

30

... More
Supply & fixing glass panes window 3.8mm thick(812)

5.79

-

480

... More
Three coat white wash in ceiling quantity same as item 17

42.32

-

39

... More
Two coat oil bound distamper two cote (inside wall)(671,672,673)

110.23

-

75

... More
two coat water proof apex with two coat birla white putty

87.6

-

70

... More
two coat enamal paint (641)

25.93

-

65

... More
MS iron work & cutting bending Placing supply fixing by binding wire(504)

937.33

-

59.5

... More
Construciton of soak pit

-

-

-

... More
earthwork exavation(252)

3.3

-

170

... More
Brickwork 1:4 cement & sand

0.6

-

6505

... More
Brickwork bets filling in soak pit

1.45

-

3646.8

... More
Brickwork 1:4 cement & sand edgeing in top

0.73

-

6640

... More
Rcc 1:1.5:3 cement sand morter 20 mm nominal size(284)

0.23

-

7515

... More
cutting & binding of for steel(504)

18.06

-

59.5

... More
15mm plaster in 1:6 c/s mortar (14.1)

0.92

-

165

... More
Construciton of Septic Tank (1.0x0.75x1m size)

-

-

-

... More
earthwork exavation(252)

2.61

-

170

... More
pcc 1:4:8 cement sand nominal size40mm (281)

0.18

-

4175

... More
Brickwork 1:4 cement & sand

1.25

-

6640

... More
20 mm plaster 1:3 cement sand mortar 597

6.67

-

235

... More
Rcc 1:1.5:3 cement sand morter 20 mm nominal size(284)

0.24

-

7515

... More
40 mm pcc 1:2 cement sand 20 mm nominal size(665)

1.13

-

335

... More
steel bar(504)

7.98

-

59.5

... More
sanitary work

-

-

-

... More
supply white glazed earten ware pan 580mm dia (orisa pan)(2)

1

-

1566

... More
pvc pipe

1

-

300

... More
110mm pvc pipe

8

-

420

... More
Construction of Main hole 600X600

-

-

-

... More
earthwork exavation(252)

3.3

-

170

... More
pcc 1:4:8 cement sand nominal size40mm 281

0.51

-

4175

... More
Brickwork 1:4 cement & sand

0.88

-

6505

... More
20 mm plaster 1:3 cement sand mortar 665

5.89

-

235

... More
40 mm plaster 1:2:4 cement sand mortar 14.1

2.16

-

335

... More
Rcc 1:1.5:3 cement sand morter 20 mm nominal size(284)

0.34

-

7515

... More
cutting & binding of for steel(504)

25.89

-

59.5

... More
15 mm plaster 1:6 cement sand mortar 14.1

1.91

-

165

... More
Construciton of C.C. Road & Both side Edging

-

-

-

... More
E/W in filling including in ordinary soil , by cartage in embankment to be in 20 cm (8") layers including ramming & dressing the surface to required levels and slopes etc. complete work (253)

128.05

-

130

... More
Excavation in foundation in black cotton soil (in Bundelkhand area) including lift upto 1.5 m. and lead upto 30 m. and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge a distance of 30 m. from the foundation (Drain/Edging).(251)

4.09

-

145

... More
Stone dust filling in foundation including supply of necessary quanity of sand, watering and dressing etc. rate to including cost of material, labour and T&P etc. required for poper completion of the work .(all work)

41.6

-

1315.7

... More
Concrete with 4 cm .(1.5") gauge approved stone ballast,approved coarse sand and cement in the proportion of 1:4:8 including supply of all materials, labour and T&P etc.required for proper completion of the work.(281)

4.09

-

4175

... More
M 150 brick work in 1:4 cement and fine sand of 1.25 F.M. mortar in foundation and plinth including supply of all materials, labours and T&P etc. required for proper completion of the work .(Edging)305

8.07

-

5940

... More
Supply and laying of 125 micron thick approved quality polythen sheet over prepared base.

399.94

-

16

... More
Making 10 to 12 mm. thick expansion or contraction joints at interval of 3.00 m each in C.C. road slab by full depth from at header joint and 1/3 depth saw cuts on other joints with cleaning and sealing with asphalt including all labour, T&P etc. as directed by Engineer-in-charge.

159.97

-

38.5

... More
Cement, concrete with 1:2:4 cement, coarse sand and approved 20 mm. gauge granite stone grit including supply of all materials, labour and T&P etc. required for proper completion of work.(pg 39 new)

85.37

-

5815

... More
Construction of Drain 0.3x0.3 M in Size

-

-

-

... More
Earth Work in foundaion in ordinary-soil(lome clay or sand) including lift upto 1.50 m and lead upto 30.0 m & inclding flling. Watering and Ramming of excavated earth in to the space between the building and the sides of foundationtrenches or in to the plinth and removel and disposal of surplas earth as directed by the Engineer - incharges upto a distance of 30 m (100 fts.)from the foundation trenches.(251)

94.76

-

145

... More
stone dust filling in foundation including supply of necessary quanity of sand, watering and dressing etc. rate to including cost of material, labour and T&P etc. required for poper completion of the work .(all work)

19.95

-

1315.7

... More
Providing and laying Cement and Concrete1:4:8 ( 1 Cement: 4 Fine sand : 8 Graded Brick aggreate 40 mm nominal size ) including supply of materials. Labour and T & P etc. required of proper completion of the work and curing complete , also including cast of formwork in foundation & floors.(281)

19.95

-

4175

... More
First class brick work in 1: 4 cement & fine sand of 1.25 F M mortar in foundation including supply of all material. Labour and T & P etc. (305)

36.23

-

5940

... More
20 mm Thick plaster with cement morter in Proportion of 1:2 cement & fine sand (597)

157.5

-

235

... More
Providing and laying Cement and concrete flooring 1:2:4 ( 1 Cement: 2 Corse Sand : 4 graded Stone ballast 12.5 mm & below nominal size ) inc-luding supply of materials. Labour and T&P etc, required of proper completion of the work and curing complete, also including cast of formwork in foundation & floors.(665)

199.5

-

335

... More
Cost of Internal electrification work (Detail Attached)

1

-

50000

... More
Cost of Electric Power Connection

1

-

15000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.