If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

UP State Construction And Infrastructure Development Corporation Limited - UPSCIDC Tender

Works
Eprocure
Opening Date21 Aug 2021
Closing Date7 Sep 2021
Tender Amount₹ 15,63,888 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and fixing of sub cable

60

-

75

... More
Providing and fixing of m.s.clamp

3

-

150

... More
Providing and fixing of G.I. Pipe 32mm dia B class Meadium

50

-

260

... More
Installation of Pump Labour / fixing

1

-

5000

... More
Providing and fixing of G.I. Pipe 20mm dia B class Meadium

12

-

304.19

... More
Providing and fixing of G.I. Pipe 10mm dia B class Meadium

10

-

395.68

... More
Three coat white wash in ceiling quantity

79.2

-

39

... More
Two coat oil bound distamper two cote (inside wall)

192

-

75

... More
two coat water proof apex with two coat birla white putty

101.3

-

70

... More
two coat enamal paint

25

-

65

... More
Construction of Apron

-

-

-

... More
E/W in filling including in ordinary soil , by cartage in embankment to be in 20 cm (8") layers including ramming & dressing the surface to required levels and slopes etc. complete work (253)

3.8

-

130

... More
Excavation in foundation in black cotton soil (in Bundelkhand area) including lift upto 1.5 m. and lead upto 30 m. and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge a distance of 30 m. from the foundation (Drain/Edging).(252)

0.68

-

170

... More
Concrete with 4 cm .(1.5") gauge approved stone ballast,approved coarse sand and cement in the proportion of 1:4:8 including supply of all materials, labour and T&P etc.required for proper completion of the work.(281)

2.28

-

4175

... More
115 mm brick work 1:4 cement&sand in super structure

1.14

-

5940

... More
Cement, concrete with 1:2:4 cement, coarse sand and approved 20 mm. gauge granite stone grit including supply of all materials, labour and T&P etc. required for proper completion of work.(pg 39 new)

1.82

-

5815

... More
Construction of Apex

-

-

-

... More
Excavation in foundation in black cotton soil (in Bundelkhand area) including lift upto 1.5 m. and lead upto 30 m. and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge a distance of 30 m. from the foundation (Drain/Edging).252

1.36

-

170

... More
E/W in filling including in ordinary soil , by cartage in embankment to be in 20 cm (8") layers including ramming & dressing the surface to required levels and slopes etc. complete work (253)

12

-

130

... More
Cement concrete in 1:4:8 with cement, sand and stone ballast (crusher broken) in foundation including supply of all materials, labours and T&P etc. required for proper completion of the work . (All work)

0.43

-

4175

... More
M 150 brick work in 1:4 cement and fine sand of 1.25 F.M. mortar in foundation and plinth including supply of all materials, labours and T&P etc. required for proper completion of the work .(Edging)

1.09

-

5940

... More
Laying and consolidation of Av. 12cm. loose thick 45-63mm gauge Granite stone ballast with 21% stone dust by road roller including supply of all materials, labours and T&P etc.(Road)

5.2

-

1779

... More
Supply and laying of 80mm thick precast inter Lock concrete block manufacturing by Rubber Mouleded making each in size and shape (35No. Per sqm.) of minimum compressive strength 300kg/sqm over 40mm thick average stone dust with joints 3 mm thick with stone dust including labour and tempring & sweeping etc. complete to work. (Road)

40

-

800

... More
Cement, concrete with 1:2:4 cement, coarse sand and approved 20 mm. gauge granite stone grit including supply of all materials, labour and T&P etc. required for proper completion of work.

0.11

-

5815

... More
Construction of Apex Road & Both side Edging

-

-

-

... More
Excavation in foundation in black cotton soil (in Bundelkhand area) including lift upto 1.5 m. and lead upto 30 m. and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge a distance of 30 m. from the foundation (Drain/Edging).251

14.82

-

145

... More
E/W in filling including in ordinary soil , by cartage in embankment to be in 20 cm (8") layers including ramming & dressing the surface to required levels and slopes etc. complete work (253)

96.66

-

130

... More
Stone dust filling in foundation including supply of necessary quantity of sand, watering and dressing etc. rate to including cost of materials, labour and T&P etc. required for proper completion of the work. (All work)

37.16

-

1315.7

... More
Cement concrete in 1:4:8 with cement, sand and stone ballast (crusher broken) in foundation including supply of all materials, labours and T&P etc. required for proper completion of the work . (All work)

4.94

-

4175

... More
M 150 brick work in 1:4 cement and fine sand of 1.25 F.M. mortar in foundation and plinth including supply of all materials, labours and T&P etc. required for proper completion of the work .(Edging)

12.35

-

5940

... More
Laying and consolidation of Av. 12cm. loose thick 45-63mm gauge Granite stone ballast with 21% stone dust by road roller including supply of all materials, labours and T&P etc.(Road)

32.22

-

1779

... More
Supply and laying of 80mm thick precast inter Lock concrete block manufacturing by Rubber Mouleded making each in size and shape (35No. Per sqm.) of minimum compressive strength 300kg/sqm over 40mm thick average stone dust with joints 3 mm thick with stone dust including labour and tempring & sweeping etc. complete to work. (Road)

322.2

-

800

... More
Cement, concrete with 1:2:4 cement, coarse sand and approved 20 mm. gauge granite stone grit including supply of all materials, labour and T&P etc. required for proper completion of work.

1.5

-

5815

... More
Supply and fixing of Granit Black Stone sign board including painting and lettering as directed by Engineer-in-charge.&Add for Photography etc.

1

-

5000

... More
Construction of Drain 0.30x0.30 M in Size

-

-

-

... More
Earth Work in foundaion in ordinary-soil(lome clay or sand) including lift upto 1.50 m and lead upto 30.0 m & inclding flling. Watering and Ramming of excavated earth in to the space between the building and the sides of foundationtrenches or in to the plinth and removel and disposal of surplas earth as directed by the Engineer - incharges upto a distance of 30 m (100 fts.)from the foundation trenches.(251)

189.35

-

145

... More
stone dust filling in foundation including supply of necessary quanity of sand, watering and dressing etc. rate to including cost of material, labour and T&P etc. required for poper completion of the work .(all work)

39.86

-

1315.7

... More
Providing and laying Cement and Concrete1:4:8 ( 1 Cement: 4 Fine sand : 8 Graded Brick aggreate 40 mm nominal size ) including supply of materials. Labour and T & P etc. required of proper completion of the work and curing complete , also including cast of formwork in foundation & floors.(281)

39.86

-

4175

... More
First class brick work in 1: 4 cement & fine sand of 1.25 F M mortar in foundation including supply of all material. Labour and T & P etc. (305)

72.38

-

5940

... More
20 mm Thick plaster with cement morter in Proportion of 1:2 cement & fine sand (597)

314.7

-

235

... More
Providing and laying Cement and concrete flooring 1:2:4 ( 1 Cement: 2 Corse Sand : 4 graded Stone ballast 12.5 mm & below nominal size ) inc-luding supply of materials. Labour and T&P etc, required of proper completion of the work and curing complete, also including cast of formwork in foundation & floors.(665)

398.62

-

335

... More
Construction of 4 Seated Toilet (2M&2F) in Village Jhansi

-

-

-

... More
Cleaning of Jungle i/c uprooting of rank vegetations grass, bush, wood trees and saplings of girth upto 30 cm. Measured at a height of 1 mtr. above ground level & removal of rubbish upto a distance of 50 mtr. outside the periphery of area cleared.

9.6

-

5

... More
Earth work in excavation in foundation

3.85

-

170

... More
Cement concrete with 4 cm (1.5") gauge approved coarse sand and cement in the proportion of 1:4:8 i/c supply of all materials, labour and T&P etc. required for proper completion of the work.

0.51

-

4175

... More
M 150 brick work in 1:6 cement and Coarse sand of mortor in foundation in one work thick wall i/c supply of all materials, labour and T&P etc. required for proper completion of the work.

3.68

-

5800

... More
R.C.C work with cemenet approved coarse sand and 20 mm gauge stone ballast in the proportion of 1:1.5:3 excluding supply of reinforcement and its bending but i/c its fixing and binding the same with 24 B.W. G.G.I. binding the wire and i/c necessary centering and shuttering etc. also i/c supply of all materials, labour and T&P etc. required for proper completion of the work. Binding wire cost being included in the item

1.15

-

7515

... More
Mild Steel or iron in plain work such as reinforced concrete wrought to required same as necessary i/c proper completion of the work.

0.9

-

5950

... More
M 150 brick work in 1:6 cement and coarse sand of Mortor in Super structure in one brick thick wall i/c supply of all materials, labour and T&P etc. required for proper completion of the work.

3.62

-

6505

... More
115 mm Brick work in 1:4 cement and Coarse sand of mortor in s/s in one brick thick wall i/c supply of all materials, labour and T&P etc. required for proper completion of the work.

1.38

-

6640

... More
2 cm (2/4") 20 mm thick plaster in 1:3 consisting of one part yf. Cement and 2 part of approved coarse sand laid in panels. Finished with 3 mm (1/8") floating coat of meat cement of matble dust in ration 5:1 in Sunshed i/c supply of materials, labour and T&P complete.

10.16

-

235

... More
12/15 mm thick plaster in 1:6 cement mortor over brick work minimum thickness not to be less than 3/6" (12 mm) thick i/c supply of all materials, labour and T&P etc. required for proper completion of the work but with cement and approved coarse sand in 1:6 cement & fine sand of 1.25 F.M. mortor in external

39.26

-

165

... More
Supply of ALuminium Door with frame and ventilation inc. supply of materials, labour and its fixing complete

4

-

3000

... More
Cement concrete with 4 cm (1.5") gauge approved stone ballast, approved coarse sand and cement in the proportion of 1:4:8 i/c supply of all materials, labour and T&P etc. required for proper completion of the work

0.97

-

4175

... More
Supply and filing of Loose Earth

2.5

-

335

... More
25 mm P.C.C. 1:2:4 (1 Cement : 2 coarse sand : 4 Graded stone aggregate of size 12.5 mm)

5.75

-

230

... More
25 mm P.C.C. 1:2:4 (1 Cement :2 coarse sand : 4 graded stone aggregate of size 12.5 mm)

16.28

-

905

... More
Supply and fixing of W.C. Seat without Sistern

4

-

1300

... More
Apex Paint two coat with 1 mm thick birla white putty outside

14.81

-

142

... More
Three Coat white wash

35.32

-

23

... More
Internal Electrification work

1

-

1120

... More
Laying & Supply 110 mm PVC Pipe in Sewer Line

8

-

220

... More
Construction & Providng a Septic Tank for 25 Users Jhansi

-

-

-

... More
Excavation in Foundation in Mixed soil

8.16

-

150

... More
Supply and filling of sand

0.36

-

1900

... More
PCC in 1:4:8 in C:C/s:Ballast (40mm)

0.48

-

4175

... More
Brick work in foudation in 1:6 C:C/S mortor in S.T.

2.99

-

5800

... More
4½" Brick work in 1:4 C:C/Sand mortor in sides

0.16

-

5940

... More
R.C.C. in 1:½:3 C:C/S:S/G top Cover i/c all material, Labour tT&P

0.46

-

7515

... More
Cutting & Binding of for steel

19.2

-

59.5

... More
20 mm plaster with 1:2 C:C/S + neat cement

17.13

-

235

... More
40 mm P.C.C. Flooring in 1:2:4 C:C/S:S/G

2.5

-

335

... More
Construciton of soak pit

-

-

-

... More
Excavation in Foundation in mixed soil

4.58

-

150

... More
Honey Camp. Brick work in 1:3 C:C/sand mortor in sided

2.95

-

2045

... More
Brick bots filling in soak pit i/c all materials, labour T&P

2.93

-

4055

... More
R.C.C. in 1:½:3 C:C/S:S/G top cover i/c all materials, labour T&P

0.2

-

7995

... More
Supply cutting & Binding of for steel

19.17

-

59.5

... More
Cost of Internal Electrification work (Detail Inclose)

1

-

50000

... More
Cost of Electrical Power Connection

1

-

15000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.