UP State Construction And Infrastructure Development Corporation Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
UP State Construction And Infrastructure Development Corporation Limited - UPSCIDC Tender
Eprocure
Opening Date21 Aug 2021
Closing Date7 Sep 2021
Tender Amount₹ 13,50,662 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 30,500Document Cost
₹ 1,300Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_SCIDC_612483_1Bid Award Id
ViewTender No
190/EE/Jhansi/2021-22Tender Authority
UP State Construction And Infrastructure Development Corporation Limited ViewPurchaser Address
-Website
http://http://www.upscidc.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
RCR Stone masonry 1:6 Cement & sand mortar in foundation
14.09
-
3465
... More
brick work 1:6 cement & sand work in foundation (303)
4.11
-
5800
... More
Rcc work 1:1.5:3 plinth beam (pg.39)
1.6
-
7155
... More
rainforcement of plenth bar (504)
278.89
-
59.5
... More
supply and filling loose earth in plinth
17.88
-
300
... More
230 mm brick work 1:6 cement&sand in super structure
23.48
-
6365
... More
115 mm brick work 1:4 cement&sand in super structure
3.41
-
6640
... More
20 mm thick bearing plaster 1:3 cement sand mortar neat cemtent finshed(597)
12.73
-
235
... More
Supply & fitting z section window & ventilation weight @35kg/Sqm
202.39
-
94.1
... More
Supply & fitting ms sheet shutter With angle 40x40x5 mm
231.05
-
88.9
... More
R.c.c work 1:1.5:3 cement & sand nominal size 20 mm (284)
6.57
-
7515
... More
20mm plaster 1:3 cement & sand mortar with neat cement (597)
57.11
-
235
... More
12mm plaster 1:6 cement& sand mortar out side (17.58)
88.72
-
130
... More
15 mm plaster 1:6 cement & sand in side(17.59)
110.27
-
165
... More
10 mm celling plaster 1:3 cement sand mortar
42.32
-
175
... More
Plan concrete 1:4:8 cement & sand 40mm stone ballast (281)
5.12
-
4175
... More
25mm 1:2:4 cement & sand nominal size 20mm on floor (14.69)
62.66
-
230
... More
20 mm thick skirting 1:3 cement &sand mortar (597)
7.6
-
235
... More
Supply & fixing glass strip .@2.5 per sqm
123.8
-
30
... More
Supply & fixing glass panes window 3.8mm thick(812)
5.79
-
480
... More
Three coat white wash in ceiling quantity same as item 17
42.32
-
39
... More
Two coat oil bound distamper two cote (inside wall)(671,672,673)
110.23
-
75
... More
two coat water proof apex with two coat birla white putty
87.6
-
70
... More
two coat enamal paint (641)
25.93
-
65
... More
MS iron work & cutting bending Placing supply fixing by binding wire(504)
937.33
-
59.5
... More
Construciton of soak pit
-
-
-
... More
earthwork exavation(252)
3.3
-
170
... More
Brickwork 1:4 cement & sand
0.6
-
6505
... More
Brickwork bets filling in soak pit
1.45
-
3646.8
... More
Brickwork 1:4 cement & sand edgeing in top
0.73
-
6640
... More
Rcc 1:1.5:3 cement sand morter 20 mm nominal size(284)
0.23
-
7515
... More
cutting & binding of for steel(504)
18.06
-
59.5
... More
15mm plaster in 1:6 c/s mortar (14.1)
0.92
-
165
... More
Construciton of Septic Tank (1.0x0.75x1m size)
-
-
-
... More
earthwork exavation(252)
2.61
-
170
... More
pcc 1:4:8 cement sand nominal size40mm (281)
0.18
-
4175
... More
Brickwork 1:4 cement & sand
1.25
-
6640
... More
20 mm plaster 1:3 cement sand mortar 597
6.67
-
235
... More
Rcc 1:1.5:3 cement sand morter 20 mm nominal size(284)
0.24
-
7515
... More
40 mm pcc 1:2 cement sand 20 mm nominal size(665)
1.13
-
335
... More
steel bar(504)
7.98
-
59.5
... More
sanitary work
-
-
-
... More
supply white glazed earten ware pan 580mm dia (orisa pan)(2)
1
-
1566
... More
pvc pipe
1
-
300
... More
110mm pvc pipe
8
-
420
... More
Construction of Main hole 600X600
-
-
-
... More
earthwork exavation(252)
3.3
-
170
... More
pcc 1:4:8 cement sand nominal size40mm 281
0.51
-
4175
... More
Brickwork 1:4 cement & sand
0.88
-
6505
... More
20 mm plaster 1:3 cement sand mortar 665
5.89
-
235
... More
40 mm plaster 1:2:4 cement sand mortar 14.1
2.16
-
335
... More
Rcc 1:1.5:3 cement sand morter 20 mm nominal size(284)
0.34
-
7515
... More
cutting & binding of for steel(504)
25.89
-
59.5
... More
15 mm plaster 1:6 cement sand mortar 14.1
1.91
-
165
... More
Construciton of Apex Road & Both side Edging
-
-
-
... More
Excavation in foundation in black cotton soil (in Bundelkhand area) including lift upto 1.5 m. and lead upto 30 m. and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge a distance of 30 m. from the foundation (Drain/Edging).251
5.05
-
145
... More
E/W in filling including in ordinary soil , by cartage in embankment to be in 20 cm (8") layers including ramming & dressing the surface to required levels and slopes etc. complete work (253)
65.88
-
130
... More
Stone dust filling in foundation including supply of necessary quantity of sand, watering and dressing etc. rate to including cost of materials, labour and T&P etc. required for proper completion of the work. (All work)
24.33
-
1315.7
... More
Cement concrete in 1:4:8 with cement, sand and stone ballast (crusher broken) in foundation including supply of all materials, labours and T&P etc. required for proper completion of the work . (All work)
3.37
-
4175
... More
M 150 brick work in 1:4 cement and fine sand of 1.25 F.M. mortar in foundation and plinth including supply of all materials, labours and T&P etc. required for proper completion of the work .(Edging)
8.42
-
5940
... More
Laying and consolidation of Av. 12cm. loose thick 45-63mm gauge Granite stone ballast with 21% stone dust by road roller including supply of all materials, labours and T&P etc.(Road)
21.96
-
1779
... More
Supply and laying of 80mm thick precast inter Lock concrete block manufacturing by Rubber Mouleded making each in size and shape (35No. Per sqm.) of minimum compressive strength 300kg/sqm over 40mm thick average stone dust with joints 3 mm thick with stone dust including labour and tempring & sweeping etc. complete to work. (Road)
219.6
-
800
... More
Cement, concrete with 1:2:4 cement, coarse sand and approved 20 mm. gauge granite stone grit including supply of all materials, labour and T&P etc. required for proper completion of work.
1.03
-
5815
... More
Supply and fixing of Granit Black Stone sign board including painting and lettering as directed by Engineer-in-charge.&Add for Photography etc.
1
-
5000
... More
Supply and Installation of LED Street Light
-
-
-
... More
Supply & Fixing of LED Street Light having die cast Aluminium body and diffuser with driver set suitable for 75 to 90 watt. Confirming up to IP 66 and above Protection complete in all respec CAT-AA (with Complete Supporting Material. Make Panasonic/Anchor, 05 year Warranty
50
-
8850
... More
Supply & Erection of "D" Clamps of 38x6mm flat iron for wall/roof type service bracket with bolts nuts etc complete in all respect including painting with aluminium paint
50
-
147
... More
Wire for Connection
850
-
50
... More
Cost of Internal electrification work (as per Detail Attached)
1
-
50000
... More
Cost of Electric Power Connection
1
-
15000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements