If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

UP State Construction And Infrastructure Development Corporation Limited - UPSCIDC Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date3 Jan 2022
Closing Date8 Jan 2022
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
R.C.R.stone masonery work in foundation in 1:6 cement:sand mortar including Supply of all Material labour T&P

17.97

-

3643.25

... More
First class brick Work in 1:6 cement and fine sand of 1.25 FM, mortar in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work.(Brick work in 1:6 ct:c/s from g/l to p/l-)

6.72

-

5985

... More
Rcc work with cement opproved coarse sand and 2 cm. (3/4") gauge oPProved stone ballast in the proportion of 1:1:5:3 in lintels of doors and windows excluding supply of reinforcement and itsbinding but Including its fixing and binding the same with24 B.W.G.G.I binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour &. T&p ate.required for proper completion of the work. Binding wire cost being. including in the item. as in item 283(1) above but in R.C.C. at foundation and footing with 4 cm. (1.5") gauge approved stone ballast. (R.c.c. in 1:1,1/2:3 ct:c/s:s/g in col. footing)

0.35

-

7528.75

... More
Rcc work with cement approved coarse sand and 2 cm. (3/4") gauge oPProved stone ballast in the proportion of 1:1:5:3 in lintels of doors and windows excluding supply of reinforcement and its binding but Including its fixing and binding the same with24 B.W.G.G.I binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour &. T&p ate.required for proper completion of the work. Binding wire cost being. including in the item. (R.C.C. in 1:1,1/2:3 ct:c/s:s/g in tie beam & plinth Beam)

0.25

-

9205.5

... More
Rcc work with cement approved coarse sand and 2 cm. (3/4") gauge oPProved stone ballast in the proportion of 1:1:5:3 in lintels of doors and windows excluding supply of reinforcement and its binding but Including its fixing and binding the same with24 B.W.G.G.I binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour &. T&p ate.required for proper completion of the work. Binding wire cost being. including in the item. (R.C.C. in 1:1,1/2:3 ct:c/s:s/g in tie beam & plinth Beam)

1.68

-

7657

... More
Rcc work with cement opproved coarse sand and 2 cm. (3/4") gauge oPProved stone ballast in the proportion of 1:1:5:3 in lintels of doors and windows excluding supply of reinforcement and its binding but Including its fixing and binding the same with24 B.W.G.G.I binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour &. T&p ate.required for proper completion of the work. Binding wire cost being. including in the item. as in item 283(1) above but in Rcc T beam and slab roofs and R.c.c. columns.

2.24

-

7657

... More
Rcc work with cement approved coarse sand and 2 cm. (3/4") gauge oPProved stone ballast in the proportion of 1:1:5:3 in lintels of doors and windows excluding supply of reinforcement and its binding but Including its fixing and binding the same with24 B.W.G.G.I binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour &. T&p ate.required for proper completion of the work. Binding wire cost being. including in the item. as in item 283(1) above but for slab. (R.c.c. in 1:1x1/2:3(ct:c/s:s/g) in Rcc Column

13.8

-

8041.75

... More
First class brick Work in 1:6 cement and fine sand of 1.25 FM, mortar in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work. As in item (301 to (304) above but in super structure, including necessary cutting and moulding of bricks as required and also - including honey comb brick work, thickness of wall not to be less than 1.5 brick thick. Add extra labor to ab OV e item in O. 301 to 304. as in item (309) above but for wall of one brick thick. add for extra labour.(Brick work in 1:6 ct:c/s mortor in super structure (23 cm thick)

27.05

-

6521.75

... More
2 cm (3/4") thick cement plaster in dedo or skirting in 2 Consisting of one part yf cement and 2 parts of approved coarse sand laid in Panels, finished with 3 mm (1/8"), floating, coat of neat cement or Genent and marble dust in ratio 51 including supply of materials abour and T&P etc. required for proper completion of the work. (Dado/skrt. in 1:2 (ct:c/s) 20mm with neat flush)

11.2

-

237.5

... More
supply of Approved M.S. Z-section windows and ventilators excluding cost of glass panes but including supply of all material its fabrication nuts and bolt, hole fast for proper completion of work as per direction of engineer-in-charge and also including cost of handle stays rod etc. and one coat of red oxide paint complete in the respect site of work, Supply of M.S. Grillofa approved quality- and drawing made of flat iron not bigger then 20x4 mm size including supply of materials, fabrication, labour, T&P and also one coat of red oxide paint complete in all respect as per direction of Engineer-incharge for proper completion of work at site. (Rate Average of Z section + Grill) (92.80+82.49)/2=87.65with 10mm sq bar grill

345.6

-

89.4

... More
supply of Ms. Angle iron windows ventilation frame made of approved M.S. angle iron Wroght to required form including drilling hole, Welding and recetting where necessary and also including supply of all material, such as steel hinges of required size, nut 8 bolts etc. and also including all taxes, Wastage and one coat of red oxide paint complete in all respect as per direction of Engineer-in-charge for proper completion of Work at site of work.

135

-

84.46

... More
6to10mm ceiling plaster in 1:3 cement:sand

150.89

-

175.75

... More
15 mm Cement plaster in single coat on fair side of single or hal brick wall for interior plastering upto floor two level including internal rounded angles chamfers, and/or rounded angles not exceeding 80 mm. in girth and finished even and smooth. No extra for mixing any additive.IN ROUGH SURFACE OF WALL

174.62

-

166.25

... More
12 mm Cement plaster in single coat on fair side of single or hal brick wall for interior plastering upto floor two level including internal rounded angles chamfers, and/or rounded angles not exceeding 80 mm. in girth and finished even and smooth. No extra for mixing any additive.

130.94

-

133

... More
2 cm (3/4") thick cement plaster in dedo or skirting in 2 Consisting of one part yf cement and 2 parts of approved coarse sand laid in Panels, finished with 3 mm (1/8"), floating, coat of neat cement or Genent and marble dust in ratio 51 including supply of materials abour and T&P etc. required for proper completion of the work. (Dado/skrt. in 1:2 (ct:c/s) 20mm with neat flush)

5.15

-

237.5

... More
earth filling in plinth including supply of necessary quantity of moorum from a distance not exceeding 8 Km.(5 miles) from the site of work and including watering, dressing etc. rate to include cost of all materials, labour and T&P etc. required for proper completion of the work. (Rate is including Royllity)

31.32

-

451.63

... More
Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 km. (5 miles) from the site of work and including watering, dressing etc. Rate to include cost of all materials, labour and T&P etc.required for proper completion of the work. (Rate is including Royality)

7.83

-

1785.05

... More
Cement concrete with 4 cm (1.5") gauge approved stone ballast approved coarse sand and cement in the proportion of 4 2: including supply of all materials, labour and T & P etc. required for proper completion of the work.As In een No. 279) above but in the proportion of 8:4: 1 - (L.c. in 1:4:8 ct:c/s:s/B (40mm) in base of apron & step.)

7.33

-

399

... More
Cement concrete flooring 1:2:4 cement 2 coarse S. sandi: 4 graded stone aggregate of size 20 mm nomina size) laid in one layer finished with floating cost of nea cement:40 mm thick floor) (p.c.c. flooring in 1:2:4 ct:C/s:s/g in apron & step etc.)

97.73

-

280.25

... More
2 cm (3/4") thick cement plaster in dedo or skirting in 2 Consisting of one part yf cement and 2 parts of approved coarse sand laid in Panels, finished with 3 mm (1/8"), floating, coat of neat cement or Genent and marble dust in ratio 51 including supply of materials abour and T&P etc. required for proper completion of the work. (Dado/skrt. in 1:2 (ct:c/s) 20mm with neat flush)

4.31

-

237.5

... More
providing & painting of two coate of apex wheather coate with primary coate of wall primer- out side

130.94

-

120.61

... More
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.

607.33

-

97.67

... More
One priming coat &. Twocoat oil distemper on new St work including supply of all materials, labour and T&P etc. required for proper completion of the work. As in item 649 above but for every coat after the first coat.

325.51

-

66.5

... More
Painting or Varnishing on iron works in small areas St. or new wood work with one coat of ready mixed priming paint & one coat of approved superior quality ready mixed paint of clear synthetic varnish including supply of all materials, labour and T&P etc. required for proper completion of the Work Paint to be used should confirm to the I.S.I.No. 103 1950,Same as in item 641 above but for every coat after is Coat. Details of cost for 650 stfit. Area.

38.23

-

90.25

... More
Providing and fixing glass stirrups in flooring 35x5mm size

244.32

-

28.5

... More
Providing and fixing 4mm thick Glass pan in Window with putty & pins

11.52

-

456

... More
providing & injecting chemical for post constructional ant termite treatment with drilling holes at juction of floor with walls & pillars, the application of chemicals shall be as per relevant. i.s code and the rate of application of chemical ahall also be as provided in the is 6313 part-iii, including quarterly inspection and providing required treatment for one year as per direction of E/L.

91.67

-

133

... More
As in item 303 above but in 1:4 cement and fine sand of 1.25FM mortar., As in item (301 to (304) above but in super structure, including necessary cutting and moulding of bricks as required and also - including honey comb brick work, thickness of wall not to be less than 1.5 brick thick. Add extra labor to ab OV e item in O. 301 to 304. as in item (309) above but for wall of half brick (41/2") thick. add for extra labour over item no. 310. (Brick work in 1:4 (ct:c/s) in apron)

0.56

-

6118

... More
Drip couse in 1:3 ct:c/s with all material labour T&P in sunshade and slab projection

55.88

-

23.75

... More
Mild steel or iron in plain work such as Ot reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage & overlapping & hooks.

1620.62

-

56.53

... More
2 cm (3/4") thick cement plaster in dedo or skirting in 2 Consisting of one part yf cement and 2 parts of approved coarse sand laid in Panels, finished with 3 mm (1/8"), floating, coat of neat cement or Genent and marble dust in ratio 51 including supply of materials abour and T&P etc. required for proper completion of the work. (Dado/skrt. in 1:2 (ct:c/s) 20mm with neat flush)

109.71

-

237.5

... More
Providing and fixing Sign Board

1

-

4750



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.