UP State Construction And Infrastructure Development Corporation Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

UP State Construction And Infrastructure Development Corporation Limited - UPSCIDC Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date2 Mar 2024
Closing Date7 Mar 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
First class brick Work in 1:6 cement and fine sand of 1.25 FM, mortar in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work.(Brick work in 1:6 ct:c/s from g/l to p/l-)

2.34

15467

6610

... More
RCC in Foundation and peddstle

4.53

35900

7925

... More
RCC In Plinth beam

4.06

32175

7925

... More
RCC in Column

3.75

37425

9980

... More
RCC in lintel sunshade.

0.86

7138

8300

... More
RCC in Slab

9.51

82832

8710

... More
RCC in slab beam

2.56

25548

9980

... More
First class brick Work in 1:6 cement and fine sand of 1.25 FM, mortar in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work. As in item (301 to (304) above but in super structure, including necessary cutting and moulding of bricks as required and also - including honey comb brick work, thickness of wall not to be less than 1.5 brick thick. Add extra labor to ab OV e item in O. 301 to 304. as in item (309) above but for wall of one brick thick. add for extra labour.(Brick work in 1:6 ct:c/s mortor in super structure (23 cm thick)

20.74

149286

7198

... More
2 cm (3/4") thick cement plaster in bearing in 2 Consisting of one part yf cement and 2 parts of approved coarse sand laid in Panels, finished with 3 mm (1/8"), floating, coat of neat cement or Genent and marble dust in ratio 51 including supply of materials abour and T&P etc. required for proper completion of the work. (Dado/skrt. in 1:2 (ct:c/s) 20mm with neat flush)

10.29

2695

262

... More
supply of Approved M.S. Z-section windows and ventilators excluding cost of glass panes but including supply of all material its fabrication nuts and bolt, hole fast for proper completion of work as per direction of engineer-in-charge and also including cost of handle stays rod etc. and one coat of red oxide paint complete in the respect site of work, Supply of M.S. Grillofa approved quality- and drawing made of flat iron not bigger then 20x4 mm size including supply of materials, fabrication, labour, T&P and also one coat of red oxide paint complete in all respect as per direction of Engineer-incharge for proper completion of work at site. (Rate Average of Z section + Grill) (92.80+82.49)/2=87.65with 10mm sq bar grill

180

17784

98.8

... More
supply of Ms. Angle iron windows ventilation frame made of approved M.S. angle iron Wroght to required form including drilling hole, Welding and recetting where necessary and also including supply of all material, such as steel hinges of required size, nut 8 bolts etc. and also including all taxes, Wastage and one coat of red oxide paint complete in all respect as per direction of Engineer-in-charge for proper completion of Work at site of work.

120

11196

93.3

... More
6to10mm ceiling plaster in 1:3 cement:sand

40.2

7798

194

... More
15 mm Cement plaster in single coat on fair side of single or hal brick wall for interior plastering upto floor two level including internal rounded angles chamfers, and/or rounded angles not exceeding 80 mm. in girth and finished even and smooth. No extra for mixing any additive.IN ROUGH SURFACE OF WALL

128.21

23462

183

... More
12 mm Cement plaster in single coat on fair side of single or hal brick wall for interior plastering upto floor two level including internal rounded angles chamfers, and/or rounded angles not exceeding 80 mm. in girth and finished even and smooth. No extra for mixing any additive.

111.3

16361

147

... More
2 cm (3/4") thick cement plaster in dedo or skirting in 2 Consisting of one part yf cement and 2 parts of approved coarse sand laid in Panels, finished with 3 mm (1/8"), floating, coat of neat cement or Genent and marble dust in ratio 51 including supply of materials abour and T&P etc. required for proper completion of the work. (Dado/skrt. in 1:2 (ct:c/s) 20mm with neat flush)

90.54

23721

262

... More
earth filling in plinth including supply of necessary quantity of moorum from a distance not exceeding 8 Km.(5 miles) from the site of work and including watering, dressing etc. rate to include cost of all materials, labour and T&P etc. required for proper completion of the work. (Rate is including Royllity)

24.79

8924

360

... More
Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 km. (5 miles) from the site of work and including watering, dressing etc. Rate to include cost of all materials, labour and T&P etc.required for proper completion of the work. (Rate is including Royality)

2.64

5464

2070

... More
Cement concrete with 4 cm (1.5") gauge approved stone ballast approved coarse sand and cement in the proportion of 4 2: including supply of all materials, labour and T & P etc. required for proper completion of the work.As In een No. 279) above but in the proportion of 8:4: 1 - (L.c. in 1:4:8 ct:c/s:s/B (40mm) in base of apron & step.)

5.31

27930

5260

... More
Cement concrete flooring 1:2:4 cement 2 coarse S. sandi: 4 graded stone aggregate of size 20 mm nomina size) laid in one layer finished with floating cost of nea cement:40 mm thick floor) (p.c.c. flooring in 1:2:4 ct:C/s:s/g in apron & step etc.)

127.87

39511

309

... More
2 cm (3/4") thick cement plaster in dedo or skirting in 2 Consisting of one part yf cement and 2 parts of approved coarse sand laid in Panels, finished with 3 mm (1/8"), floating, coat of neat cement or Genent and marble dust in ratio 51 including supply of materials abour and T&P etc. required for proper completion of the work. (Dado/skrt. in 1:2 (ct:c/s) 20mm with neat flush)

3.65

956

262

... More
Providing and fixing Glass stirups

345.24

5178

15

... More
Finishing of wall with waterproof cement paint two or more coat

111.3

8681

78

... More
White washing three coat

168.41

2829

16.8

... More
Painting or Varnishing on iron works in small areas St. or new wood work with one coat of ready mixed priming paint & one coat of approved superior quality ready mixed paint of clear synthetic varnish including supply of all materials, labour and T&P etc. required for proper completion of the Work Paint to be used should confirm to the I.S.I.No. 103 1950,Same as in item 641 above but for every coat after is Coat. Details of cost for 650 stfit. Area.

23.44

2320

99

... More
Mild steel or iron in plain work such as Ot reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage & overlapping & hooks.

2940.93

231245

78.63

... More
Providing and fixing Sign Board

1

5000

5000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.