UP State Construction And Infrastructure Development Corporation Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

UP State Construction And Infrastructure Development Corporation Limited - UPSCIDC Tender

Works
Eprocure
Opening Date21 Aug 2021
Closing Date7 Sep 2021
Tender Amount₹ 14,21,874 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Concrete with 4 cm .(1.5") gauge approved stone ballast,approved coarse sand and cement in the proportion of 1:4:8 including supply of all materials, labour and T&P etc.required for proper completion of the work.(281)

9.57

-

4175

... More
M 150 brick work in 1:4 cement and fine sand of 1.25 F.M. mortar in foundation and plinth including supply of all materials, labours and T&P etc. required for proper completion of the work .(Edging)305

3.45

-

5940

... More
Cement, concrete with 1:2:4 cement, coarse sand and approved 20 mm. gauge granite stone grit including supply of all materials, labour and T&P etc. required for proper completion of work.(pg 39 new)

13.48

-

5815

... More
Providing and laying Cement and concrete 1:2:4 ( 1 Cement: 2 Corse Sand : 4 graded Stone ballast 20 mm nominal size ) inc-luding supply of materials. Labour and T&P etc, required of proper completion of the work and curing complete, also including cast of formwork in foundation & floors.(665)

11.5

-

335

... More
Construciton of Drain 0.6x1.0 M in Size

-

-

-

... More
Earth Work in foundaion in ordinary-soil(lome clay or sand) including lift upto 1.50 m and lead upto 30.0 m & inclding flling. Watering and Ramming of excavated earth in to the space between the building and the sides of foundationtrenches or in to the plinth and removel and disposal of surplas earth as directed by the Engineer - incharges upto a distance of 30 m (100 fts.)from the foundation trenches.(251)

113.22

-

145

... More
stone dust filling in foundation including supply of necessary quanity of sand, watering and dressing etc. rate to including cost of material, labour and T&P etc. required for poper completion of the work .(all work)

9.76

-

1315.7

... More
Providing and laying Cement and Concrete1:4:8 ( 1 Cement: 4 Fine sand : 8 Graded Brick aggreate 40 mm nominal size ) including supply of materials. Labour and T & P etc. required of proper completion of the work and curing complete , also including cast of formwork in foundation & floors.(281)

9.76

-

4175

... More
First class brick work in 1: 4 cement & fine sand of 1.25 F M mortar in foundation including supply of all material. Labour and T & P etc. (305)

28.06

-

5940

... More
20 mm Thick plaster with cement morter in Proportion of 1:2 cement & fine sand (597)

61

-

235

... More
Providing and laying Cement and concrete flooring 1:2:4 ( 1 Cement: 2 Corse Sand : 4 graded Stone ballast 12.5 mm & below nominal size ) inc-luding supply of materials. Labour and T&P etc, required of proper completion of the work and curing complete, also including cast of formwork in foundation & floors.(665)

64.66

-

335

... More
Construciton of Drain 0.3x0.45 M in Size

-

-

-

... More
Earth Work in foundaion in ordinary-soil(lome clay or sand) including lift upto 1.50 m and lead upto 30.0 m & inclding flling. Watering and Ramming of excavated earth in to the space between the building and the sides of foundationtrenches or in to the plinth and removel and disposal of surplas earth as directed by the Engineer - incharges upto a distance of 30 m (100 fts.)from the foundation trenches.(251)

12.06

-

145

... More
stone dust filling in foundation including supply of necessary quanity of sand, watering and dressing etc. rate to including cost of material, labour and T&P etc. required for poper completion of the work .(all work)

1.98

-

1315.7

... More
Providing and laying Cement and Concrete1:4:8 ( 1 Cement: 4 Fine sand : 8 Graded Brick aggreate 40 mm nominal size ) including supply of materials. Labour and T & P etc. required of proper completion of the work and curing complete , also including cast of formwork in foundation & floors.(281)

1.98

-

4175

... More
First class brick work in 1: 4 cement & fine sand of 1.25 F M mortar in foundation including supply of all material. Labour and T & P etc. (305)

5.38

-

5940

... More
20 mm Thick plaster with cement morter in Proportion of 1:2 cement & fine sand (597)

11.7

-

235

... More
Providing and laying Cement and concrete flooring 1:2:4 ( 1 Cement: 2 Corse Sand : 4 graded Stone ballast 12.6 mm & below nominal size ) inc-luding supply of materials. Labour and T&P etc, required of proper completion of the work and curing complete, also including cast of formwork in foundation & floors.(665)

19.76

-

335

... More
Construciton of Drain 1.5x1.5 M in Size

-

-

-

... More
Earth Work in foundaion in ordinary-soil(lome clay or sand) including lift upto 1.50 m and lead upto 30.0 m & inclding flling. Watering and Ramming of excavated earth in to the space between the building and the sides of foundationtrenches or in to the plinth and removel and disposal of surplas earth as directed by the Engineer - incharges upto a distance of 30 m (6.260 fts.)from the foundation trenches.(251)

431.81

-

145

... More
stone dust filling in foundation including supply of necessary quanity of sand, watering and dressing etc. rate to including cost of material, labour and T&P etc. required for poper completion of the work .(all work)

24.68

-

1315.7

... More
Providing and laying Cement and Concrete1:4:8 ( 1 Cement: 4 Fine sand : 8 Graded Brick aggreate 40 mm nominal size ) including supply of materials. Labour and T & P etc. required of proper completion of the work and curing complete , also including cast of formwork in foundation & floors.(281)

32.08

-

4175

... More
R.C.R. work in 1: 4 cement & fine sand of 1.25 F M mortar in foundation including supply of all material. Labour and T & P etc.

133.25

-

3465

... More
20 mm Thick plaster with cement morter in Proportion of 1:2 cement & fine sand (597)

133.25

-

235

... More
Providing and laying Cement and concrete flooring 1:2:4 ( 1 Cement: 2 Corse Sand : 4 graded Stone ballast 12.5 mm & below nominal size ) inc-luding supply of materials. Labour and T&P etc, required of proper completion of the work and curing complete, also including cast of formwork in foundation & floors.(665)

236.88

-

335

... More
Construciton of C.C. Road & Kc Drain & edging

-

-

-

... More
E/W in filling including in ordinary soil , by cartage in embankment to be in 20 cm (8") layers including ramming & dressing the surface to required levels and slopes etc. complete work (253)

101.24

-

130

... More
Excavation in foundation in black cotton soil (in Bundelkhand area) including lift upto 1.5 m. and lead upto 30 m. and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge a distance of 30 m. from the foundation (Drain/Edging).(251)

10.44

-

145

... More
Stone dust filling in foundation including supply of necessary quanity of sand, watering and dressing etc. rate to including cost of material, labour and T&P etc. required for poper completion of the work .(all work)

27.7

-

1315.7

... More
Concrete with 4 cm .(1.5") gauge approved stone ballast,approved coarse sand and cement in the proportion of 1:4:8 including supply of all materials, labour and T&P etc.required for proper completion of the work.(281)

38.38

-

4175

... More
M 150 brick work in 1:4 cement and fine sand of 1.25 F.M. mortar in foundation and plinth including supply of all materials, labours and T&P etc. required for proper completion of the work .(Edging)305

10.99

-

5940

... More
Supply and laying of 125 micron thick approved quality polythen sheet over prepared base.

303.72

-

16

... More
Making 1 to 12 mm. thick expansion or contraction joints at interval of 3.00 m each in C.C. road slab by full depth from at header joint and 1/3 depth saw cuts on other joints with cleaning and sealing with asphalt including all labour, T&P etc. as directed by Engineer-in-charge.

121.49

-

38.5

... More
Cement, concrete with 1:2:4 cement, coarse sand and approved 20 mm. gauge granite stone grit including supply of all materials, labour and T&P etc. required for proper completion of work.(pg 39 new)

30.45

-

5815



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.