UP Jal Nigam Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
UP Jal Nigam - UPJN Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date7 Dec 2024
Closing Date12 Dec 2024
Tender Amount₹ 15,83,821.87 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 32,000Document Cost
₹ 3,540Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPJNG_981166_1Tender No
3098/M-16/05Tender Authority
UP Jal Nigam ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
63mm
1485
146
216810
... More
Supply of specials required for proper completion of work. (5% of above cost (Item 1A)
310
12
3937
... More
Supply of specials required for proper completion of work. (5% of above cost (Item 1A)
1485
7
10840.5
... More
Excavation of trenches for pipe line with lift up to 1.5 m lead up to 50 m including filling back, watering and ramming of excavated earth in to the trenches and removeal and disposal of surplus earth within a distance of 50 m from the center of the excavated trenches.
1077
221
238017
... More
Supply of following size of C.I.D./F sluice valve and scour valves of various size given below including railway freight, insurance charge, carting, loading, unloading & stacking, etc. complete.
-
-
-
... More
DI D/F Sluice valve
-
-
-
... More
100mm
1
11739
11739
... More
80mm
1
9648
9648
... More
65mm
1
7856
7856
... More
50mm
2
7486
14972
... More
Carting of following size of sluice valves and scour valves from store to site of work, lowering in already prepered trenches and fixing them in position including cost of jointing materials and proper completion of work.
-
-
-
... More
DI D/F Sluice valve
-
-
-
... More
100mm
1
937
937.22
... More
80mm
1
937
937.22
... More
65mm
1
937
937.22
... More
50mm
2
937
1874.44
... More
Provide all materials and labour T & P etc. required for proper completion of work and construction of following chambers.
-
-
-
... More
Sluice valve chamber masonary type
2
25000
50000
... More
Provision for Inter Connections from old existing pipe line with new pipe line as per requirement & direction of Engineer Incharge Including Supply of all material, Labour T & P etc.
-
-
-
... More
200mm x110mm dia or below dia
1
7000
7000
... More
110mm x 75mm dia
2
2000
4000
... More
110mm x 63mm dia
3
1800
5400
... More
Dismentaling&Reinstatement of following types of road surface including supply of all material,labour, T&P etc. for proper completion of work.
-
-
-
... More
B.O.E.
112
495
55440
... More
Interlocking/ stone patia
173
1274
220402
... More
Provision for road, nala and culvet crossing 1.5 to 3.0m expansion-
-
-
-
... More
150 mm Dia
4
15000
60000
... More
Leakage Repairing of following dia /types of pipes with all materials, labour, etc complete
-
-
-
... More
200mm HDPE/AC
2
5611
11222.44
... More
160mm HDPE/PVC
1
2901
2901.59
... More
140mm HDPE/PVC
3
2901
8704.77
... More
110mm HDPE/PVC
6
2260
13565.34
... More
90mm HDPE/PVC
7
2260
15826.23
... More
75mm HDPE/PVC
9
1765
15888.96
... More
63mm HDPE/PVC
42
1765
74148.48
... More
Provision for shifting of tap house connection of individual household damaged due to widing of road as per departmental type design and drawing including supply of all materials such as 20mm outer dia HDPE pipe/ 15mm GI pipe upto 10m length and specails (15mm GI Elbow, saddle, brass ferrule, adopter, brass bib cock, etc.), complete including dismantling and temporary reinstatement of road surface with all materials, labour, T&P etc required for proper completion of work.
42
2496
104850.9
... More
Same as ITEM NO. 14 but for new house connections.
8
3700
29600
... More
Cleaning and repairing of existing OHT leakage and sepage from oht or pipe, using mechanical tools, chlorine including all labour, Tools, T&P etc. Complete.
150
42
6300
... More
Repairing of Pump House and boundary wall with dismantling of old plaster as required and replaster and painting of pump house including supply of all materials, labour, T&P etc complete.
1
18000
18000
... More
Repairing of existing CI/ DI DF sluice valve of following diameter-
-
-
-
... More
200mm
2
5600
11200
... More
150mm
2
4200
8400
... More
125mm
2
3500
7000
... More
100mm
2
2800
5600
... More
Supply and Installation of new motor pump as per existing specification of tubewell, including new submersible cable 40m length, dismantling and lowering of pump, motor, column pipe etc complete.
1
125000
125000
... More
Monthly Salary for Pump Operater to operate scheme for regular water supply during construction Phase ( 1month) &operation& maintenance Phase (12months)
13
5000
65000
... More
Cleaning of water works campus with all labour T&P etc complete.
1
6000
6000
... More
Electronic type chlorinating dosing system(1W+1S) with 6LPH capacity 4kg/cm2 working pressure with 200 liter tank and valve pipe with all required acessories.
1
64000
64000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements