UP Jal Nigam Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
UP Jal Nigam - UPJN Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date30 Dec 2024
Closing Date15 Jan 2025
Tender Amount₹ 18,79,830
Costs
EMD
₹ 38,000Document Cost
₹ 3,540Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPJNM_988176_1Bid Award Id
ViewTender No
982/Nivida/32 Date 23/12/2024Tender Authority
UP Jal Nigam ViewPurchaser Address
-Website
http://http://jn.upsdc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Removing all existing unsound/loose material like plaster,loose concrete,loose particle,oil,dust and other impurities etc manually by chisel and hammer from rcc conduit surface. Making Rcc surface thoroughly cleaned using wire brush and water including disposal of debris outside of pipeline.
32
-
-
... More
Cleaning of Joints including removing of baker rod, filling and all other loose materials from the expansion joint and clean the surface around the joint to make it free from loose particles,dirt,oil,grease etc and disposal of malba/debris outside of pipeline including all labour,T&P etc complete.
15
-
-
... More
Drilling and fixing injection packers in RC members including, Drilling Holes: Drilling holes in structural members at intervals as per the recommendation of the engineer in charge.Cleaning of holes: Clean the holes with air blower before fixing nozzles. Fixing of Packers: Insert 12 mm dia., 50~75 mm long injection packers in cleaned holes with moisture-insensitive epoxy resin-based putty or equivalent. Cutting of Packers: Cut the Packers by wheel after grouting completion without damaging structural elements.Patching Hole:- After cutting off the packer we patch the hole on epoxy putty.
30
-
-
... More
Supply and apply single component, Polyurethane Injection foam based system for wet conditions and temporary sealing, which cures to a dense flexible foam with a fine cellular structure. Minimum Product Requirements:
Viscosity cps 500-1300 at 23°C
250
-
-
... More
Supply and apply 2 components, elastic, low viscous, solvent-free, Polyurethane Injection resin based system for permanent sealing, that does not need the presence of water for hardening reaction
Product Requirements:
The viscosity of the mixture 100 mPa•s (at +20°C) Capable of penetrating cracks0.2mm wide with a CE Marking (European Conformity) - Conformance label that the product is approved to the essential requirements and under market surveillance
100
-
-
... More
Filling the joints with Polystyrene baker rod of the size next higher to the joint gap and apply Polyurethane based sealant in the expension joint up to a depth equal to not less than 1/2 the width of the joint including insert of bitumen impregnated board as filling material,T&P etc. complete.
30
-
-
... More
Supply and apply two coats of sodium silicate-based quick setting cement mortar to prevent leakage in the place system Similar Product Make: Sikafloor® curehard-24 or its equivalent completion as per the direction of the engineer in charge
Consumption: 0.25 kg/m2 per coat
8
-
-
... More
Application of rust remover cum passivator (Restolene) on steel bars and also application polymer (Build Crete) in two coats on steel bars (sika rustoff -100) or its equivalent completion as per the direction of the engineer. Consumption: 0.150 kg/m2 per coat
20
-
-
... More
Providing and applying the epoxy-based bonding agent on the dry and prepared surface. Product: Sikadur®-32 LP or its equivalent Consumption: 0.45kg/m2 Product requirements: mixed density: 1.70kg/ltr; shear strength 10MPa.
40
-
-
... More
Providing, mixing and applying polymer modified cement concrete/mortar at an average thickness of 10-12 mm in multilayers, including making smooth surface with wooden tools etc complete as per specification and directions of enginner in charge. Similar Product Make: SikaLatex®-SBR or its equivalent
Consumption: 10% by weight of cement
Product: specific gravity- 1.02, mixing ratio -1:5 (SikaLatex: water) other material as per grade, density - 2300 kg/m3
32
-
-
... More
Providing, mixing, and applying Latex polymer-modified cement concrete in the ratio (1:1.5:3) (with polystyrene-based epoxy system, and furane system to be used as per the direction of the manufacturer), including making smooth surfaces with wooden tools, etc complete as per specification and directions of the engineer in charge. Similar Product Make: SikaLatex®-SBR or its equivalent
Consumption: 10% by weight of cement
Product: specific gravity- 1.02, mixing ratio -1:5 (SikaLatex: water) other material as per grade, density - 2300 kg/m3
8
-
-
... More
Providing, mixing, and applying two coats of protective epoxy coating over finished and dry surfaces. Similar Product Make: Sikagard®-67 or its equivalent
Consumption: 0.25 kg/m2 per coat
Product requirements: mixed density: 1.22kg/ltr;
40
-
-
... More
Making scaffolding and dismantling the same after completion of work including cost of material, labour, T&P, transportation etc. required for proper completion of work.
700
-
-
... More
Finishing / Painting of the external surface of walls with premium acrylic smooth exterior paint (asian apex Ultima paint or its equivalent) of approved shade to give an even shade in two coats after applying priming coat of cement primer including all material, labour T & P etc.
40
-
-
... More
Dismantling of old damaged stone pitching and re-stone pitching 22.50 cm. thick required work and preparing surface complete inside slopes of Hindon river bund excluding cost of stones but including carting of stones from one place to site of work including supply of labour, T&P etc.
600
-
-
... More
Raised and cut pointing on stone work with 1:3 cement and fine sand mortar including all material, labour, T&P etc.
600
-
-
... More
Labour cess@1%
1861217.4
-
-