UP Jal Nigam Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
UP Jal Nigam - UPJN Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date20 Nov 2024
Closing Date2 Dec 2024
Tender Amount₹ 76,25,081.08 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 1,53,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPJNG_975634_1Bid Award Id
ViewTender No
379/E-Tender/151 date 11.11.2024Tender Authority
UP Jal Nigam ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
CC Road
17.5
289
5060.83
... More
Earth work in excavation by manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed with required dewatering as per site requirement.
-
-
-
... More
0.00 to 1.50 m B.G.L.
1365
288
394348.5
... More
1.50 to 3.00 m B.G.L.
1131
361
408652.92
... More
3.00 to 4.50 m B.G.L.
598
451
269967.1
... More
Disposal of excavated of surplus earth during excavation & laying of Sewer Line (Average lead up to 8 km)
99.51
351
34943.93
... More
OPEN TIMBERING
-
-
-
... More
Provide and fix open timbering in (covering 1/3 of surface area by plank) in trenches for the depth upto 3m below grond level consisting of 40mm thick approved country wood planks for polling boards. 125 mm x 75 mm Indian sal wood wallers and 100 mm dia sal ballies for struts at 1.5m including removal after laying of sewers.
-
-
-
... More
0.00 To 3.00 m BGL
780
379
295947.6
... More
CLOSE TIMBERING
-
-
-
... More
Provide and fix Close timbering in 3.00 to 6.0 mtr trenches for the depth upto 3m below grond level consisting of 40mm thick approved country wood planks for polling boards. 125 mm x 75 mm Indian sal wood wallers and 100 mm dia sal ballies for struts at 1.5m including removal after laying of sewers.
-
-
-
... More
3.00 To 6.00 m BGL
520
718
373578.4
... More
Bedding
-
-
-
... More
Provision of CC bedding including supply of material, labour, T&P etc required for the proper completion of work.
-
-
-
... More
3.00 - 4.50 m B.G.L.
68.64
7763
532870.85
... More
Supply of following sizes of RCC NP3 S&S Hume pipes from factory to divisional store including Rubber Gaskets/Rings etc. also including transportations loading, unloading, stacking all taxes excise dutiy insurance etc. complete
-
-
-
... More
500 mm Dia RCC NP3
520
2108
1096669.6
... More
LAYING & JOINTING OF SEWERS
-
-
-
... More
LAYING, AND JOINTING 500 MM DIA, R.C.C. NP3 HUME PIPE 3.00-4.50 M DEEP.
520
747
388507.6
... More
Supply and Filling of Local Sand in trenches including watering, ramming and dessing etc complete
177.19
1333
236275.78
... More
Dewatering of water by diesel pump including hiring of diesel pump during sewer laying/Interconnection work including supply of all labour .
10
514
5145.3
... More
Provision for shifting/repairing of electric & telephone cable/Poles, Sewer/Water Lines etc. including temporary arrangements for restoration of services during execution of works
-
-
-
... More
Electricity cable, Telephone Cable, Water Line etc
520
201
104780
... More
Interconnection of new sewer line to existing sewer line including dismantling existing manhole, repairing and cleaning of existing manhole etc. complete.
5
7676
38380
... More
Constructing brick masonary circular type manhole of following internal diameter at bottom and 560 mm internal diameter at top and depth is given below with brick work in cement mortar 1:4 (Cement: C. Sand), necessary excavation, foundation concrete 1:4:8 (cement : c. sand: 40 mm size stone balast) and plastering with cement mortar 1:3 (cement : c. sand) 12 mm thick finished with a floating coat of neat cement, benching ( the benching at the side of channel shall be at least 50 mm above crown of the pipe and then rise with a slope of 1 in 12 towards the sides of the manhole) & cover fixed in cement concrete 1:2:4 (cement : c. sand: 20 mm size stone balast) incuding S/F SFRC cover & frame of heavy duty as per IS:12592 and plastic encapsulated foot step.
-
-
-
... More
1500 mm Dia 2.3 m to 5.0m BGL
9
147468
1327215.87
... More
Reinstatement of following type of road as existing road section including supply of all materials, labour, T&P etc complete with proper baaricading and all safety measures and as per required specification
-
-
-
... More
Interlocking road
175
1437
251476.75
... More
CC Road
17.5
2216
38782.8
... More
Microtunneling for laying of 400 mm dia RCC NP3 Pipe line including Supply 12 mm thick 700 mm dia mild steel casing pipe with inside 2 coats of food grade epoxy painting over 1 coat of epoxy primer and outside 2 coats of anti-corrosive red oxide primer as per specification and Installation of product pipe by Guided Auger Bored method including making of entry and exit pits, all related civil works like excavation, shoring/strutting, etc., shielded excavation through auger boring process, lowering of pipe segments in the jacking pit, laying and jointing of product pipeline through jacking process from the jacking pit, construction of required manholes and restoration of site after project completion including all labor material T&P etc..
20
80491
1609836.6