UP Jal Nigam Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

UP Jal Nigam - UPJN Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date19 Nov 2024
Closing Date27 Nov 2024
Tender Amount₹ 23,11,416 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply of Tubewell Assembly- M.S.Tubewell assembly with all required parts like plain pipe, Slotted pipe (as required upto 50% of plain pipes) rings, well cap bail plug, clamp reducer, central guide, suport structure etc. as required & as per typed design complete in all respect.(Note- Axial Length of Reducer without Ring shall be measured with casing pipe) 300 mm dia M.S. Pipe

54

-

-

... More
200 mm dia M.S. Plain/slotted

91

-

-

... More
PEA-GRAVEL (As per IS:4097)- 1.65 mm to 4.50 mm size Pea gravel of Lalkuwan quarry duly screened, washed and properly stacked at site for Tubewell

55

-

-

... More
Drilling of bore by rig machine As Per IS :2800(Part I & II):- Drilling of bore by 600 mm dia bit GL to 60 mt. BGL.

60

-

-

... More
Drilling of bore by 500 mm dia bit from 60 mt GL to 100 mt. BGL.

40

-

-

... More
Drilling of bore by 500 mm dia bit 100 m BGL to 160 m. BGL.

60

-

-

... More
Lowering of tube well assembly With M.S. rings, Bail Plug, Reducer Including welding: - Lowering of 300 mm dia M.S. Housing pipe from GL to 54 m.BGL

54

-

-

... More
Lowering of 200 mm dia M.S. Plain/slotted pipe 54 m. BGL to 100 m. BGL

46

-

-

... More
Lowering of 200 mm dia M.S. Plain/slotted pipe 100 m. BGL to 145 m. BGL

45

-

-

... More
Development and testing of tube well by Air Compressor.

50

-

-

... More
Development and testing of tube Well O.P.Unit to yield sand free Discharge.

100

-

-

... More
Chemical and Bacteriological test (Analysis of water sample)

1

-

-

... More
Logging of borehole by departmental/approved electric logger

1

-

-

... More
Arrangement of water and digging of pit for water storage

1

-

-

... More
Barricading of site at the time of Tubewell Construction.

1

-

-

... More
Complete cabling of tubewell including power and control cabling complete in all respect

1

-

-

... More
Carting of old pumpset from Nagar Nigam store with piping and valve or Dismantling of old pumpset from defunc tubewell with piping & valve and lowering in newly constructed rebore tubewell including testing & commissiong complete.

1

-

-

... More
Misc. Items such as Prtection Ring, Cutout, Electric resistance Rubber sheet, Transformer oil etc.

1

-

-

... More
Painting of pumping plants and other equipments

1

-

-

... More
One month watch and ward during installation period

1

-

-

... More
Three months trial and run of tubewell

3

-

-

... More
Rising Main work- Supply of following pipes including railway freight, insurance charges and cartage charges F.O.R. etc. complete 200 mm dia D.I.Pipe 7.0mm thickness

50

-

-

... More
Supply of D.I. specials for the above pipe lines

1

-

-

... More
Supply of following size of C.I. D/F sluice valves as per I.S. 780-1960 tested to 10 Kg/Sq.m fixing in pipe line trenches, jointing and testing complete 200 mm dia size

1

-

-

... More
Earth work in ordinary soil loam, clay or sand with lift upto 1.50 m and lead upto 50m filling, watering and ramming of excavated earth into the trenches and disposal of surplus earth upto 50 m

38.5

-

-

... More
Carting, laying and jointing of the following sizes of pipes into the trenches including cost of all jointing materials, labour and T&P testing etc. complete 200 mm dia

50

-

-

... More
THRUST BLOCK-RCC with cement, coarse sand & 20 mm gauge stone ballast in proportion of 1:1.5:3 in thrust blocks of pipe line excluding supply of reinforcement & its bending but including its fixing & binding the same with 0.50 mm thick binding wire in position & necessary centering & shuttering including curing and supply of all materials, labour, T&P etc. required for proper completion of the work.

2.11

-

-

... More
THRUST BLOCK- Mild steel or iron work in RCC wrought to required shape as necessary including bending for proper completion of the work including supply of steel & wastage etc.

2.5

-

-

... More
Site clearance and other unforeseen items.

1

-

-

... More
Connection work for tubewell- CI D/F Bend (90°) 150 mm dia

1

-

-

... More
CI D/F Pipe piece 150 mm dia

1

-

-

... More
CI Bend (90°) 200 mm dia

1

-

-

... More
CI D/F Reducer 200 mm dia to 150 mm dia

1

-

-

... More
CI D/F Tail piece 200 mm dia

1

-

-

... More
Packing sheet

5

-

-

... More
Nut bolt

10

-

-

... More
Cartage of Materials to site.

1

-

-

... More
Labour charges for Connection.

1

-

-

... More
Pea Gravel Connecting Chamber and Coloumn for Girder- Excavation in foundation in ordinary soil (loam, clay and sand) including lift up to 1.5 m & lead up to 50 m refilling, watering and ramming of excavated earth into trenches or into the space between the building and sides of foundation trenches or into to plinth and disposal of surplus earth up to a distance of 50 m from the center of foundation trenches.

11.43

-

-

... More
Concrete with 4 cm guage brick ballast, LOCAL SAND & cement in proportion of 12:6:1 in foundation, including supply of all materials, labor, t & P etc. required for proper completion of the work.

2.24

-

-

... More
Ist Class brick work in 1:6 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour, T&P etc required for proper completion of work.

11.66

-

-

... More
Ist Class brick work in 1:4 cement and coarse sand mortar in super structure including supply of all materials, labour, T&P etc required for proper completion of work.

1.1

-

-

... More
Providing 25mm thick PCC apron of 1:2:4 with 12-20 mm stone grit over 75mm thick base concrete in 1:4:8 cement, local sand and 40mm gauge over burnt brick ballast with finishing coat including fixing of glass strips at desired intervals and BOE at ends supply of all materials, labour, T&P etc. required for proper completion for the work

8

-

-

... More
Cement concrete with cement, coarse sand and 20mm gauge approved stone ballast in proper ratio of 1:2:4 with centering, curing supply of all materials, labour, T&P etc. required for proper completion of the work in following.

0.95

-

-

... More
Supply& Fixing of MS guarder 150 mm X150mmX6mm including all material, labour, T&P etc. complete.

1.11

-

-

... More
12mm thick plaster with cement local snad mortar in 1:3 (over brick work with 3 mm floating coat of neat cement including supply of all materials, labour, T&P etc required for proper completion of work. From GL utpo super structure.

49.49

-

-

... More
White washing in three coat including supply of all materials, labour, T&P etc required proper completion of work.

26.04

-

-

... More
Earth work in filling in plinth including supply of excavated earth from distance of 8 Km.

2.4

-

-

... More
Site clearance and other unforeseen items.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.