UP Jal Nigam Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

UP Jal Nigam - UPJN Tender

Works
Civil And Construction
Civil Works Others
Consultancy Services
Civil And Architectural Services
Eprocure
Opening Date2 Nov 2024
Closing Date3 Dec 2024
Tender Amount₹ 56,55,00,000 
Notes
Download

Costs

Summary

Design And Build Sewage Treatment Plant Of Installed Capacity 20 Mld Along With Facility For Septage Co-treatment (10 Kld)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply, Installation, testing and commissioning of Electro – mechanical and Instrumentation equipment and accessories including equipment for electricity generation from solar photovoltaic arrangement (including required for disposal and facility for reuse of treatet effluent) .

1

-

-

... More
Ancillary works like boundary wall of campus with gate, RCC retaining wall along the Kutti darin side along with other appurtenant works, strengthening of Kutti drain at disposal point in length of 50 meters each on both banks, 7 set of staff quarters based on CPWD plinth area (2-Type 1 (double story), 2-Type 2 (double story) and 1-Type 3), nd 2.0 m wide C.C. path ways to various units, CC/Bitumen approach/access road to the STP in 550 mts length in width of 4.50 mts, 50 KL RCC OHT, Tubewell & Pump House and water distribution system for potable water supply and drainage system in the STP campus, earth filling up-to the nearest road level or HFL whichever is higher, horticulture works, firefighting arrangements water supply arrangement, land scaping, site development, Construction of culvert across Kutti drain to reach STP site capable of withstanding heavy vehicle movement etc.

1

-

-

... More
Implementation of Environmental Management Plan and ESHS-MSIP, as per Appendix 1 of Schedule 2 (Design Build Services).

1

-

-

... More
Add GST

18

-

-

... More
Nalla Tapping Arrangement: Survey, design and construction of suitable size R.C.C. (M-30) Nala tapping structure as per design at Deoband town with RCC M-30 training works at upstream and downstream of tapping point upto suitable length and installation of required number Stainless Steel sluice gates to regulate the flow along with construction of inlet channel and installation of stainless steel coarse screen and proper arrangement for operating platform.

-

-

-

... More
Nallah tapping works at drain -1

1

-

-

... More
Nallah tapping works at drain -2

1

-

-

... More
Add GST

18

-

-

... More
Laying of Gravity Intercepting Sewer: Design, supply & laying of following size R.C.C. Hume pipe NP-4 Class Socket spigot pipes, rubber rings jointing materials and specials from store to the work lowering the same in to the trenches up to depth as specified below G.L. true to alignment and gradient including barricading of site, traffic diversion arrangement, dismantling of roads, mechanical/ manual excavation, dewatering (as per requirement), shoring & timbering with mild steel/ wooden planks, construction of required class beddings, construction of RCC/ brick masonry circular/ rectangular or precast manholes in accordance with the provisions laid down in latest version of IS 4111 (Part 1) as per site requirement, refilling of trenches with proper compaction including disposal of surplus earth with in 8 km radius, temporary reinstatement of dismantled roads, permanant restoration of road as per PWD/MoRTH norms, shifting & reinstatement of existing utilities if any, cost of all jointing material, testing & commissioning etc. complete including supply of all material, labour, T&P etc. required for proper completion of work.

-

-

-

... More
1000 mm dia RCC NP-4 Pipe

3950

-

-

... More
Add GST

18

-

-

... More
By Trenchless Method: Design, supply and installation of Mild Steel pipe having PU coating both inside and outside in minimum thickness of 250 microns, by Tunnel boring machine/HDD method including making of entry and exit pits, all related civil works like excavation, shoring/ strutting, etc. shielded excavation, lowering of pipe segments in the jacking pit, laying and jointing of product pipe line through jacking process from the jacking pit true to alignment and gradient, construction of required manholes, refilling of excavated pits with proper compaction including disposal of surplus earth with in 8 km radius, temporary reinstatement of dismantled roads, permanant restoration of road as per PWD/MoRTH norms, shifting & reinstatement of existing utilities if any, cost of all material, testing & commissioning etc. complete including supply of all material, labour, T&P etc. required for proper completion of work and restoration of site after project completion.

-

-

-

... More
1000 mm dia, 12 mm thickness MS pipe

700

-

-

... More
Add GST

18

-

-

... More
Main Sewage Pumping Station : Design and construction of main pumping station of 28 MLD capacity including construction of Sump well , receiving chamber, screen chamber, Pump house, Panel room, DG/Transformer yard, Panel & PLC Room, internal road, Painting, site development works along with supply, installation and commissioning of suitable capacity non-clog submersible pumps (MOC- Casing- 2%NiCI, Impeller- Duplex SS, Shaft & Shaft sleeve- Duplex SS) capable of pumping 100 mm particle with necessary accesseries such as motors, panals, cabeling, valves, pipings etc, D.G. set of suitable capacity with necessary accessaries, one no. Electromagnetic Flowmeter cum totalizer, Automation of MPS, two nos Mechanical screens of half peak capacity each, one no. Manual screen of full peak capacity, two nos. Transformers and Substation, provision for supply and installation of 5T capacity chain pulley block with traveling trolley with 15 meter lift with girder etc with necessary tools and spares, provision for testing of each pump set, valves etc. at manufacturer works and at site, painting of all pumps piping and valves with two coat enamel paint, supply and installation of AMF panel with associated works, supply and installation of actuated sluice gates with associated works etc. including Installation, commissioning and testing of all E&M equipments complete to the satisfaction of engineer in charge. Civils component of the MPS shall be designed for 28 MLD (Avg. flow) capacity. E&M component of the MPS shall be designed for 20 MLD (Avg. flow) capacity.

-

-

-

... More
Civil and Structural Works

1

-

-

... More
Supply, Installation, testing and commissioning of Electro – mechanical and Instrumentation equipment and accessories

1

-

-

... More
Add GST

18

-

-

... More
Rising main from MPS to STP

-

-

-

... More
Design, supply and laying of following diameter DI K-9 pipe Pressure Pipes (S&S) with out side Zinc coating with finishing layer of Bitumen and have factory internal cement mortar lining in SRC cement for sewerage confirming to IS 8329:2000 (amended upto date) with push on type EPDM 'ISI marked' rubber gasket (including cost of rubber gasket) joining as per IS 5382 specifications with hydraulic field testing, commissioning as per specifications, providing, Erecting, Testing, Commissioning of C.I. double ball orifice type Air Valve, construction of air valve chamber as per type design including supply & fixing of 500 mm dia medium duty perforated C.I. cover, Providing, Erecting, Testing, Commissioning, of Scour/Drain Valve with construction of chambers including dismanteling & permanant restoration of road as per PWD/MoRTH norms, excavation by manually or mechanically in inordinary soil (earth, sand, loam & clay) including ramming dressing, leveling by manually or mechanically, refilling of trenches in 15cm layer watering and ramming the same including removal of surplus earth or other dismantled material upto a distance of 500 m from the centre of trenches/trenchless technology, construction of required necessary thrust blocks, complete to the satisfaction of engineer in charge.

-

-

-

... More
500 mm DI K-9 pipe

50

-

-

... More
Add GST

18

-

-

... More
Treated Effluent Pipeline:

-

-

-

... More
Design, supply & laying of following size R.C.C. Hume pipe NP-4 Class Socket spigot pipes, rubber rings jointing materials and specials from store to the work lowering the same in to the trenches up to depth as specified below G.L. true to alignment and gradient including barricading of site, traffic diversion arrangement, dismantling of roads, mechanical/ manual excavation, dewatering (as per requirement), shoring & timbering with mild steel/ wooden planks, construction of required class beddings, construction of RCC/ brick masonry circular/ rectangular or precast manholes in accordance with the provisions laid down in latest version of IS 4111 (Part 1) as per site requirement, refilling of trenches with proper compaction including disposal of surplus earth with in 8 km radius, temporary reinstatement of dismantled roads, permanant restoration of road as per PWD/MoRTH norms, shifting & reinstatement of existing utilities if any, cost of all jointing material, testing & commissioning etc. complete including supply of all material, labour, T&P etc. required for proper completion of work to the satisfaction of engineer in charge.

-

-

-

... More
1000 mm dia RCC NP-4 Pipe

100

-

-

... More
Add GST

18

-

-

... More
Operation and Maintenance for 15 Years

-

-

-

... More
STP (PART A) Operation and Maintenance Price for Treatment of threshold sewage flow of 13.20 MLD at STP & Co- Treatment facility (10 KLD) with all civil, electrical-mechanical and instrumentation works, effluent chanel, appurtenant and other allied works for 15 years as specified in tender document and as per norms of CPHEEO manual on Sewerage and Sewage Treatment System-2013 (Bidder is required to quote the year wise O&M price for 15 years

-

-

-

... More
1st year

1

-

-

... More
2nd year

1

-

-

... More
3rd year

1

-

-

... More
4th year

1

-

-

... More
5th year

1

-

-

... More
6th year

1

-

-

... More
7th year

1

-

-

... More
8th year

1

-

-

... More
9th year

1

-

-

... More
10th year

1

-

-

... More
11th year

1

-

-

... More
12th year

1

-

-

... More
13th year

1

-

-

... More
14th year

1

-

-

... More
15th year

1

-

-

... More
PART B Additional Operation and Maintenance Price for Treatment of additional sewage in excess of the threshold flow on per MLD basis at STP & Co- Treatment facility (10 KLD) with all civil, electrical-mechanical and instrumentation works, effluent chanel, appurtenant and other allied works for 15 years as specified in tender document and as per norms of CPHEEO manual on Sewerage and Sewage Treatment System-2013

-

-

-

... More
1st year

1

-

-

... More
2nd year

1

-

-

... More
3rd year

1

-

-

... More
4th year

1

-

-

... More
5th year

1

-

-

... More
6th year

1

-

-

... More
7th year

1

-

-

... More
8th year

1

-

-

... More
9th year

1

-

-

... More
10th year

1

-

-

... More
11th year

1

-

-

... More
12th year

1

-

-

... More
13th year

1

-

-

... More
14th year

1

-

-

... More
15th year

1

-

-

... More
Total O&M Price- assuming indicative Sewage Flow reaching the STP C=a+b x (x= indicative flow minus threshold sewage flow)

-

-

-

... More
1st year (X=13.2-13.2=0)

1

-

-

... More
2nd year (X=13.69-13.2=0.49)

1

-

-

... More
3rd year (X=14.17-13.2=0.97)

1

-

-

... More
4th year (X=14.66-13.2=1.46)

1

-

-

... More
5th year (X=15.14-13.2=1.94)

1

-

-

... More
6th year (X=15.63-13.2=2.43)

1

-

-

... More
7th year (X=16.11-13.2=2.91)

1

-

-

... More
8th year (X=16.60-13.2=3.40)

1

-

-

... More
9th year (X=17.09-13.2=3.89)

1

-

-

... More
10th year (X=17.57-13.2=4.37)

1

-

-

... More
11th year (X=18.06-13.2=4.86)

1

-

-

... More
12th year (X=18.54-13.2=5.34)

1

-

-

... More
13th year (X=19.03-13.2=5.83)

1

-

-

... More
14th year (X=19.51-13.2=6.31)

1

-

-

... More
15th year (X=20-13.2=6.80)

1

-

-

... More
Operation and Maintenance cost of MPS, tapping, interceptor sewer, effluent pipe line and rising main with all civil, electrical-mechanical and instrumentation works, appurtenant and other allied works for 15 years as specified in tender document and as per norms of CPHEEO manual on Sewerage and Sewage Treatment System-2013 (Bidder is required to quote the year wise O&M price for 15 years

-

-

-

... More
1st year

1

-

-

... More
2nd year

1

-

-

... More
3rd year

1

-

-

... More
4th year

1

-

-

... More
5th year

1

-

-

... More
6th year

1

-

-

... More
7th year

1

-

-

... More
8th year

1

-

-

... More
9th year

1

-

-

... More
10th year

1

-

-

... More
11th year

1

-

-

... More
12th year

1

-

-

... More
13th year

1

-

-

... More
14th year

1

-

-

... More
15th year

1

-

-

... More
Total O&M Price

-

-

-

... More
1st year

1

-

-

... More
2nd year

1

-

-

... More
3rd year

1

-

-

... More
4th year

1

-

-

... More
5th year

1

-

-

... More
6th year

1

-

-

... More
7th year

1

-

-

... More
8th year

1

-

-

... More
9th year

1

-

-

... More
10th year

1

-

-

... More
11th year

1

-

-

... More
12th year

1

-

-

... More
13th year

1

-

-

... More
14th year

1

-

-

... More
15th year

1

-

-

... More
Add GST

18

-

-

... More
NPV of total O&M

-

-

-

... More
1st year (NPV Factor-0.909)

1

-

-

... More
2nd year (NPV Factor-0.826)

1

-

-

... More
3rd year (NPV Factor-0.751)

1

-

-

... More
4th year (NPV Factor-0.683)

1

-

-

... More
5th year (NPV Factor-0.621)

1

-

-

... More
6th year (NPV Factor-0.564)

1

-

-

... More
7th year (NPV Factor-0.513)

1

-

-

... More
8th year (NPV Factor-0.467)

1

-

-

... More
9th year (NPV Factor-0.424)

1

-

-

... More
10th year (NPV Factor-0.386)

1

-

-

... More
11th year (NPV Factor-0.350)

1

-

-

... More
12th year (NPV Factor-0.319)

1

-

-

... More
13th year (NPV Factor-0.290)

1

-

-

... More
14th year (NPV Factor-0.263)

1

-

-

... More
15th year (NPV Factor-0.239)

1

-

-

... More
Electricity and fuel charges during O&M for 15 Years

-

-

-

... More
Guaranteed Energy Consumption for 20 MLD STP at Deoband town for the first month after successful trial run (Value should be entered in all cell of rows 14.02 to 14.05, after adjusting for energy generated through solar power plant if proposed to be installed)

-

-

-

... More
For flow upto 13.2 MLD and BOD ≤ 125 mg/L

1

-

-

... More
For flow upto 13.2 MLD and BOD 125 mg/L

1

-

-

... More
For flow 13.23 MLD and BOD ≤ 125 mg/L

1

-

-

... More
For flow 13.2 MLD and BOD 125 mg/L

1

-

-

... More
STP Average GEC

-

-

-

... More
Power Charges for 20 MLD STP at Deoband town for Indicative Flow (= Sum of indicative flows in MLD X Units Consumed/MLD X 365 X 7.74) (Not to be filled by the Bidder)

703449.9

-

-

... More
Guaranteed Energy Consumption for 28 MLD MPS at Deoband town for the first month after successful trial run (Value must be entered for rows at S. No. 15.01 and 15.02 )

-

-

-

... More
For flow upto 13.2 MLD

1

-

-

... More
For flow 13.2 MLD

1

-

-

... More
SPS Average GEC

-

-

-

... More
Power Charges for 20 MLD MPS at Deoband town for Indicative Flow (= Sum of indicative flows in MLD X Units Consumed/MLD X 365 X 7.74) (Not to be filled by the Bidder)

703449.9

-

-

... More
Land requirement (sqm) - 28 MLD STP at (Circle rate is Rs 1800.00 per sq.m.) (Bidder is required to quote the land requirement under column 5 of this row including land required for Solar Power Plant if proposed, subject to lavailable land i.e. 11700 sqm)

1800

-

-

... More
Total in Figures (based on NPV of O&M Price and including Land Price)

1

-

-

... More
Total in Figures (based on actual O&M Price and excluding Land Price)

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.