UP Jal Nigam Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

UP Jal Nigam - UPJN Tender

Works
Civil And Construction
Eprocure
Opening Date13 Feb 2019
Closing Date25 Feb 2019
Tender Amount₹ 2,69,63,309 
Notes
Download

Costs

Summary

Nit for Supply of All Materials Labour And T And P

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
RISING MAIN

-

-

-

... More
Supply of following dia of pipe, laying, jointing and testing including specials cost of all jointing material etc. complete work.

-

-

-

... More
DI pipe (K-7) 150 mm dia.

30

-

1117.37

... More
Supply of following size of C.I. D/F Sluice Valve as per I.S. 780 –1960 into tested to 10Kg per sq. cm lowering them in to trenches, fixing in proper position jointing & testing including cost of jointing materials etc. complete.

-

-

-

... More
C.I.D/F sluice valve (150mm dia)

1

-

13482.79

... More
Earth Work in ordinary Soil (loam, clay or Sand) with lift upto 1.50 m and lead upto 50 m filling, watering and ramming of excavated earth into trenches and disposal of surplus earth upto 50 meter.

27.97

-

171.33

... More
Supply of all materials, labour, T&P etc and construction of masonary type sluice valve chambers as per type design of the department (1.00x1.20x1.50m size)

1

-

18870

... More
Supply of all materials labour, T&P etc and construction of thrust block as per departmental design & drawing.

-

-

-

... More
R.C.C. work with cement, coarse sand and 20 mm gauge approved stone ballast in proportion of (1:1.5:3) in thrust block of pipe line excluding supply of reinforcement and its bending, but including its fixing and binding the same with 0.50 mm thick binding wire (to be supplied by the contractor) and including necessary centering and shuttering, supply of all materials, labour, T&P etc. required for proper completion of the work.

3.33

-

9999.74

... More
Mild steel or plain work such as R.C.C. or R.B. work (when not included in overall rates) wrought to required shape as necessary including bending for proper completion of the work including supply of steel and wastage.

37.3

-

65.48

... More
DISTRIBUTION SYSTEM

-

-

-

... More
Supply of following size of pipes specials and fittings to the site of works, laying true to alignment and gradient including jointing and testing of pipe line and including supply of jointing materials etc. complete.

-

-

-

... More
HDPE PN-6 (PE- 100 - 6 Kg/sqcm)

-

-

-

... More
160 mm dia OD

47

-

543.15

... More
140 mm dia OD

606

-

421.31

... More
110 mm dia OD

672

-

268.25

... More
90 mm dia OD

896

-

189.63

... More
75 mm dia OD

875

-

138.09

... More
63 mm dia OD

27923

-

100.74

... More
Supply of following size of C.I. D/F Sluice Valve/Scour valve/Air Valve/Firehydrants as per I.S. 780 –1960 tested to 10Kg per sq. cm including lowering the same in to the trenches, fixing in proper position jointing & testing including cost of jointing material, labour, T&P etc. complete.

-

-

-

... More
C.I. sluice valve

-

-

-

... More
125 mm dia

1

-

6882.3

... More
100 mm dia

2

-

5581.8

... More
80 mm dia

2

-

4296.6

... More
65 mm dia

1

-

3600

... More
50 mm dia

10

-

3487.5

... More
Scour Valve

-

-

-

... More
50 mm dia

2

-

3487.5

... More
Fire Hydrants

-

-

-

... More
80 mm dia

1

-

1521

... More
Air Valve

-

-

-

... More
20 mm dia

1

-

8505

... More
Dismantling of following type of roads including stacking of serviceable materials and disposal of unseviceable materials from the site of work and Reinstatement of following roads including supply of all materials, labour, T&P etc all complete.

-

-

-

... More
Bituminous Road (Reinstatement as per PWD specification)

2126.75

-

1748.7

... More
B.O.E. (using 60% Old mateirals and 40% New materials

1832.56

-

309.78

... More
C.C. Roads (10 cm thick 1:2:4 C.C. road over 5cm thick P.C.C. 1:4:8 for base of road).

1133.19

-

1356.86

... More
Interlocking Roads over P.C.C 1:6:12 (10cm thick base concrete) using 60% Old Interlocking tiles and 40% New Interlocking tiles in place of broken tiles

1388.36

-

907.11

... More
Earth Work in excavation ordinary Soil (loam, clay or Sand) with lift upto 1.50 m and lead upto 50 m filling, watering and ramming of excavated earth into trenches and disposal of surplus earth upto 50 meter distance.

21075.03

-

171.33

... More
Supply of all materials, labour, T&P etc and construction of following type chambers as per type design of the department.

-

-

-

... More
Sluice Valve Chamber

-

-

-

... More
Masonary Type (size 1.00mx1.20mx1.50m)

1

-

18870

... More
C.I. Surface Box type (size 150mm x150m m)

15

-

2924

... More
Fire Hydrant Chamber

1

-

12733

... More
Air Valve Chamber

1

-

6077.5

... More
Construction of single tap pillar type stand post as per type design.

5

-

9545.5

... More
Supply of all materials labour, T&P etc and construction of thrust block as per type design of the department.

4

-

6004.4

... More
Crossing of nalas, bridge, rivers, culvert including shiffiting of telephone cable etc. along aligment of pipe line with supply of CI tyton pipe and specials for laying jointing and testing of pipe line including dismentalling of drain and reconstruction of the same.

-

-

-

... More
Culvert crossing more than 7.00m

3

-

38250

... More
Nala culvert crossing

20

-

15470

... More
Nala crossing small

30

-

4250

... More
Provision of house connection using 15 mm MDPE pipe average 6 meter long , gun metal ferrule , heavy duty PVC clamp, GI fittings and a tap etc all complete.

650

-

2550

... More
Staff Quarter

-

-

-

... More
Excavation of earth in foundation in ordinary soil (loam, clay or sand) including lift up to 1.5 m & lead upto 50 m refilling of excavated earth in to space between building and sides of foundation trench, watering, ramming and disposal of surplus earth up to 50 m from the center of the trenches .

60

-

136.84

... More
Concrete with 40 mm gauge First class brick ballast , local sand & Cement in proportion of 12:6:1 in foundation and floors including supply of all materials, labour, T&P etc. required for proper completion of the work .

5.9

-

3883.41

... More
Ist class brick work in 1:4 cement & local sand mortar in foundation and plinth including supply of all materials, labour, T&P etc required for proper completion of the work .

26.17

-

4865.56

... More
As in item 1.57 above but in 1:4 super structure including necessary cutting and moulding of bricks as required and also including honey comb brick work thickness of wall not be less than 1 brick.

25.43

-

5271.62

... More
As in item 1.57 above but in 1:4 super structure including necessary cutting and moulding of bricks as required and also including honey comb brick work thickness of wall not be less than 1/2 brick wall (Court yard).

3.31

-

5271.62

... More
20 mm thick D.P.C. with cement and approved coarse sand 12 mm stone grit in 1:1.5:3 including 5% water prooofing materials of in the proportion as specification for proper comletion of the work and including curing and shuttering as necessary.

26.4

-

284.35

... More
Sand filling in plinth including supply and carting of earth from a distance not exceeding 10 km from the site of work including watering, ramming and dressing etc required including cost of materials, labour T&P etc. required for proper completion of work.

14.51

-

364

... More
Reinforced cement concrete 1:2:4 in cement coarse sand and 20 mm gauge approved stone ballast in roof slab, beams and column excluding supply of reinforcement and its bending, but including its fixing and binding and including necessary centering, shuttering and curing and supply of all materials, labour, T&P etc. required for proper completion of the work.

6.59

-

10977.99

... More
Mild steel or plain work such as R.C.C. or R.B. work (when not included in overall rates) wrought to required shape as necessary including bending for proper completion of the work including supply of steel and wastage.

845.5

-

59.37

... More
Supply and fixing of M.S. angle iron chaukhats of 40mm x 40mm x 6mm size including simple moulding and welding work as in chaukhats and also supply with holdfasts and fixing of 125mm size heavy duty hinges as per direction of engineer in charge.

155

-

64.37

... More
Supply and fixing of M.S. angle iron chaukhats of 40mm x 40mm x 6mm size including simple moulding and welding work as in chaukhats and also supply with holdfasts and fixing of 100mm size heavy duty hinges as per direction of engineer in charge.

470

-

74.22

... More
Supply and fixing of 32mm thick plywood door and window shutter including AL drop tower bolt, handle, silencer & stoper etc. complete. All the accessaries should be heavey duty & apporved make & quality.

16

-

1887.57

... More
12 mm thick plaster with cement & local sand mortar in proportion of 1:3 over brick work, minimum thickness not be less than 10 mm including supply of all materials , labour , T & P etc. required for proper completion of work .

35.05

-

200.18

... More
12 mm thick plaster with cement & local sand mortar in proportion of 1:6 over rough face of one brick work, minimum thickness not be less than 10 mm including supply of all materials , labour , T & P etc. required for proper completion of work .

317.14

-

140.38

... More
25 mm thick (1:2:4) plain cement concrete floor with cement coarse sand and 20 mm gauge approved stone grit, laid on panels, finished with 3 mm floating coat of neat cement or cement and marble dust in ratio of 1:5 as specified over and including 75 mm thick base concrete consisting of cement, local sand and 1st class brick ballast 40 mm gauge in proportion of 1:4:8 and removing any over lapping of mortar in the joints of the panels if any and giving them uniform finish including supply of all materials , labour , T & P etc. required for proper completion of the work .

39.46

-

559.44

... More
25 mm thick (1:2:4) plain cement concrete floor with cement, coarse sand and 20 mm gauge stone ballast, laid in panels, finished with 3 mm floating coat of neat cement or cement and marble dust in ratio 1:5 as specified (without base concrete.)

51.56

-

406.11

... More
Painting or varnishing on new iron work in small areas or new wood work with one coat of priming and two coats of approved paint or varnish including supply of all materials , labour , T & P etc. required for proper completion of the work .

50

-

145.42

... More
Providing and applying plaster of paris putty of 2mm thickness over white wash surface to prepare the surface even and smooth complete.

330

-

74.8

... More
Distempering (two coat) with oil bound distemper of approved brand and manufacture & of required shade on undecorated wall surface to give an even shade over & including a priming coat with cement primer of approved brand after thoroughly brushing the surface free from mortar drooping & other foreign matters & also including preparing the surface even with plaster of paris or approved synthetic & sand papered smooth including cost of all material. (Inner plaster area)

165

-

107.94

... More
Finishing walls with premium acrylic smooth exterior paint (two coat) with silcon additives of required shade (DSR 13.47.1) all time weather proof paint i.e. Apex Ultima or other similar approved make, quality and required shade over one priming coat on new work with to coats, of Apex Ultima to give an even shade including cost of one priming coat for preparation of surface and supply of all materials, labour T&P etc. required for proper completion of work. (outer plaster area)

165

-

68.69

... More
Construction of drain

7.5

-

748

... More
Construction of Brick on edge floor

23.89

-

297.5

... More
Supply and fix 110 mm dia P.V.C. down pipe with rose heads, bends with eye hole and gratings fixed to walls with suitable clamps.

8

-

382.5

... More
For electrification work into building

1

-

34589.14

... More
For water supply work into building

1

-

34589.14

... More
For sanitation work into building

1

-

69178.28

... More
BOUNDARY WALL AND RELATED WORKS

-

-

-

... More
Excavation of earth in foundation in ordinary soil (loam, clay or sand) including lift up to 1.5 m & lead upto 50 m refilling of excavated earth in to space between building and sides of foundation trench, watering, ramming and disposal of surplus earth up to 50 m from the center of the trenches .

52.41

-

136.84

... More
Concrete with 40 mm gauge First class brick ballast , local sand & Cement in proportion of 12:6:1 in foundation and floors including supply of all materials, labour, T&P etc. required for proper completion of the work .

10.74

-

3483.41

... More
Ist class brick work in 1:4 cement & local sand mortar in foundation and plinth including supply of all materials, labour, T&P etc required for proper completion of the work .

30.07

-

4865.56

... More
As in item 1.84 above but in 1:4 super structure including necessary cutting and moulding of bricks as required and also including honey comb brick work thickness of wall not be less than 1/2 brick wall

26.63

-

5271.62

... More
20 mm thick D.P.C. with cement and approved coarse sand 12 mm stone grit in 1:2 including 5% water prooofing materials of in the proportion as specification for proper comletion of the work and including curing and shuttering as necessary.

444.21

-

284.35

... More
12 mm thick plaster with cement & local sand mortar in proportion of 1:3 over brick work, minimum thickness not be less than 10 mm including supply of all materials , labour , T & P etc. required for proper completion of work .

444.21

-

148.39

... More
Providing and applying plaster of paris putty of 2mm thickness over white wash surface to prepare the surface even and smooth complete.

444.21

-

74.8

... More
Finishing walls with premium acrylic smooth exterior paint (two coat) with silcon additives of required shade (DSR 13.47.1) all time weather proof paint i.e. Apex Ultima or other similar approved make, quality and required shade over one priming coat on new work with two coats, of Apex Ultima to give an even shade including cost of one priming coat for preparation of surface and supply of all materials, labour T&P etc. required for proper completion of work. (outer plaster area)

444.21

-

68.69

... More
Provide all materials, labour T&P etc. required for proper completion of work and construct B.O.E. approach road.

72

-

364

... More
Provide all materials, labour T&P etc. required for proper completion of work including leveling., dressing excavation and filling of earth where necessary for develop of water works site including carriage of

212.37

-

443.73

... More
GATE WITH PILLARS

-

-

-

... More
Size 3.6 M Wide Main & 1.2 M Wide Wicket Steel Gate With Pillars

-

-

-

... More
Excavation of earth in foundation in ordinary soil (loam, clay or sand) including lift up to 1.5 m & lead upto 50 m refilling of excavated earth in to space between building and sides of foundation trench, watering, ramming and disposal of surplus earth up to 50 m from the center of the trenches .

0.76

-

136.84

... More
Concrete with 40 mm gauge First class brick ballast , local sand & Cement in proportion of 8:4:1 in foundation and floors including supply of all materials, labour, T&P etc. required for proper completion of the work .

0.38

-

6925.43

... More
Mild steel or plain work such as R.C.C. or R.B. work (when not included in overall rates) wrought to required shape as necessary including bending for proper completion of the work including supply of steel and wastage.

0.58

-

5936.86

... More
Supply of all materials and favrication of M.S. boundary wall 3.60 m wide main steel gate as per departmental type desigen and drawing including its fixing in boundarywall gate pillars.

1

-

17000

... More
Supply of all materials and favrication of M.S. boundary wall 1.20 m wide wicket steel main gate as per departmental type desigen and drawing including its fixing in boundarywall gate pillars.

1

-

9800

... More
R.C.C. work with cement, coarse sand and 20 mm gauge approved stone ballast in proportion of (1:2:4) in pillar/post and windows excluding supply of reinforcement and its bending, but including its fixing and binding the same with 0.50 mm thick binding wire (to be supplied by the contractor) and including necessary centering and shuttering, supply of all materials, labour, T&P etc. required for proper completion of the work.

0.13

-

10977.99

... More
Ist class brick work in 1:6 cement, coarse sand & local sand mortar in foundation and plinth including supply of all materials, labour, T&P etc required for proper completion of the work .

0.22

-

4743.71

... More
As in item 7 above but in 1:6 super structure including necessary cutting and moulding of bricks as required and also including honey comb brick work thickness of wall not be less than 1 brick.

0.86

-

5393.46

... More
20mm dia P.V.C. Pipe

6

-

46.75

... More
Built up Main Gate

1

-

17000

... More
Painting or varnishing on new iron work in small areas or new wood work with one coat of priming and two coats of approved paint or varnish including supply of all materials , labour , T & P etc. required for proper completion of the work .

6

-

145.42

... More
Finishing walls two coat with water proofing cement paint of approved work and quality over with one coat of primer on new surface including supply of all materials, labour T&P etc. required for proper completion of the work.

6.45

-

68.69

... More
PUMP HOUSE CUM CHLORONOME (Size of PH- 3.60m x 3.00 x 3.00 m) (Size of C.Room- 1.80x1.20x3.00m) with 1.00mx1.50m stilling chamber and V-notch

-

-

-

... More
Excavation of earth in foundation in ordinary soil (loam, clay or sand) including lift up to 1.5 m & lead upto 50 m refilling of excavated earth in to space between building and sides of foundation trench, watering, ramming and disposal of surplus earth up to 50 m from the center of the trenches .

30

-

136.84

... More
Concrete with 40 mm gauge First class brick ballast , local sand & Cement in proportion of 1:4:8 in foundation and floors including supply of all materials, labour, T&P etc. required for proper completion of the work .

4.5

-

3883.41

... More
Ist class brick work in 1:1:5 cement & local sand mortar in foundation and plinth including supply of all materials, labour, T&P etc required for proper completion of the work .

12

-

4865.56

... More
20 mm thick D.P.C. with cement and coarse sand in proportion of 1:2 including 5% water prooofing materials of in the proportion as specification by the manufacturer including supply of all materials, labour T&P etc required for proper completion of work including curing and shuttering as necessary.

5

-

284.35

... More
Ist class brick work in 1:1:5 cement and coarse sand & local sand mortar in super structure including supply of all materials, labour , T&P etc required for proper completion of the work .

15.26

-

5271.62

... More
R.C.C. work with cement, coarse sand and 20 mm gauge approved stone ballast in proportion of (1:1.5:3) excluding supply of reinforcement and its bending, but including its fixing and binding the same with 0.50 mm thick binding wire (to be supplied by the contractor) and including necessary centering and shuttering, supply of all materials, labour, T&P etc. required for proper completion of the work.

-

-

-

... More
Same as item 2.12 but in Lintel

0.03

-

11313.39

... More
Same as item2.12 but in sunshade

0.77

-

10977.99

... More
Same as item 2.12 but in Slabs

4.5

-

10977.99

... More
Precast Reinforced Cement concrete with 20 mm gauge approved stone ballast, coarse sand and cement in the proportion 4:2:1 including supply of all materials, labour, T&P etc. required for proper completion of work in bed block for lintel , hold fast etc with proper shuttering.

0.09

-

8337.18

... More
Mild steel or iron work in R.C.C. work wrought to required shape as necessary including bending for proper completion of work including supply of steel its wastage.

5

-

5936.86

... More
Supply and fixing of M.S. angle iron, door, chaukhat of 40mm x 40mm x 6mm size with hold fasts including simple moulding ,welding work and also supply of all materials, labour, T&P etc required for proper completion of the work as per direction of Engineer-in-charge.

0.45

-

6548.3

... More
Supply and fixing of M.S. window with grill as per departmental drawing including supply and fitting of handle locking arrangement etc. complete.

3.21

-

6548.3

... More
Supply and Laying 40mm thick insulation layer of sand & clay over roof.

20.73

-

52.58

... More
Conc. 25mm brick ballast, white lime and surkhi (100:18:36) in roof terracing.

2.08

-

3450.97

... More
12 mm thick plaster with cement & local sand mortar in proportion of 1:1:5 over brick work, minimum thickness not be less than 10 mm including supply of all materials , labour , T & P etc. required for proper completion of work .

190

-

140.38

... More
Same as above item No.13 but in proportion 1:4 with cement and local sand mortar on ceiling .

25

-

148.39

... More
25 mm thick (1:2:4) plain cement concrete floor with cement coarse sand and 20 mm gauge approved stone grit, laid on panels, finished with 3 mm floating coat of neat cement or cement and marble dust in ratio of 1:5 as specified over and including 75 mm thick base concrete consisting of cement, local sand and 1st class brick ballast 40 mm gauge in proportion of 1:4:8 and removing any over lapping of mortar in the joints of the panels if any and giving them uniform finish including supply of all materials , labour , T & P etc. required for proper completion of the work .

22

-

559.44

... More
Supply and fixing 40 mm thick sheesham wood fully panelled door shutters including supply and fixing of wooden cleats and stoppers and fixing and adjustment of hinges, sliding door bolts, locks, handles, springs and other fitting with necessary screws etc complete.

10

-

3326.38

... More
Supply and fixing of 40 mm thick sheesham wood fully glazed window shutters including supply and fixing of wooden cleats and stoppers and fixing and adjustment of hinges, bolts, locks, handles, springs and other fitting with necessary screws etc complete.

4.91

-

7006.98

... More
Supply & Fixing of Hold fast in doors and windows of size 25cm X 4Cm X 9mm flat iron including their cutting & moulding and welding to required shape also including other material such as nails and screws etc. required for proper completion of work.

32

-

72.25

... More
Painting or varnishing on new iron work in small areas or new wood work with one coat of priming and two coats of approved paint or varnish including supply of all materials , labour , T & P etc. required for proper completion of the work .

43.21

-

145.42

... More
Supply and fixing of rolled steel joist 150mm x 100mm size including cost of all materials labour, T&P etc complete.

3.65

-

5525

... More
Construction of 250 mm wide PCC drain in proportion of 1:2:4 cement ,coarse sand and 12 to 20 mm gauge stone grit over base concrete in proportion of 1:4:8 cement ,local sand & 40mm gauge brick ballast including supply of all materials , labour , T & P etc. required for proper completion of work.

28

-

361.25

... More
Earth filling in plinth including supply and carting of earth from a distance not exceeding 10 km from the site of work including watering, ramming and dressing etc required including cost of materials, labour T&P etc. required for proper completion of work.

20.78

-

364

... More
Supply and fixing of rain water pipe110mm OD PVC 6 kg/cm sqm with bend and clamp etc all complete.

8

-

467.5

... More
Providing and applying plaster of paris putty of 2mm thickness over white wash surface to prepare the surface even and smooth complete.

215

-

74.8

... More
Distempering (two coat) with oil bound distemper of approved brand and manufacture & of required shade on undecorated wall surface to give an even shade over & including a priming coat with cement primer of approved brand after thoroughly brushing the surface free from mortar drooping & other foreign matters & also including preparing the surface even with plaster of paris or approved synthetic & sand papered smooth including cost of all material. (Inner plaster area)

115

-

107.94

... More
Finishing walls with premium acrylic smooth exterior paint (two coat) with silcon additives of required shade (DSR 13.47.1) all time weather proof paint i.e. Apex Ultima or other similar approved make, quality and required shade over one priming coat on new work with to coats, of Apex Ultima to give an even shade including cost of one priming coat for preparation of surface and supply of all materials, labour T&P etc. required for proper completion of work. (outer plaster area)

100

-

68.69

... More
Supply and fixing of cement Jali 30cmx60cm at the floor level in the chloronome for proper ventilation.

2

-

340

... More
Provide 3 mm thick floating coat of neat cemet over the previously made plaster e.g. Bye Pass chamber including all materials, labour, T&P etc. complete.

10

-

53.34

... More
Provide 150 cm long 25mm dia P.V.C. Pipe spout with slant cutting at ends and fixing the same with rich cement and coarse sand mortar in sunshades.

6

-

72.25

... More
Supply and fixing 25x3 mm thick glass strips in floors and aprons pannels in 1:3 cement and coarse sand mortar .

48

-

15.51

... More
Delivery pipe for bye pass chamber excavation of trenches and laying of 160mm dia PVC pipe including supply of all materials, labour, T&P etc complete.

20

-

382.5

... More
Site clearance of the site including disposal of earth/sand available at site during development of tubewell and due to any other cause and refilling of trenches made during construction of Tubewll.

1

-

4250

... More
Supply and fixing of 90 digree V-notch 4mm thick M.S. plate with sharp edged & scaled etc. complete as per direction of engineer-in-charge.

1

-

8500

... More
E and M Schedule-G

-

-

-

... More
Transportation

-

-

-

... More
Initial transportation of Rig Machine & its T&P/equipment’s to the site of work including loading & unloading, baricating, erection & dismantling etc.

1

-

148236

... More
Transportation of Air Compressor and its T&P including loading & unloading, erection & dismantling etc.

1

-

110872

... More
Transportation of OP Unit and its T&P including loading & unloading, erection & dismantling etc.

1

-

129952

... More
Supply including loading & unloading of TW assembly of MSERW pipe.

-

-

-

... More
200 mm dia 7.1 mm thick housing pipe

60

-

2200

... More
200 x 200 mm dia reducer

1

-

1100

... More
200 mm dia 7.1 mm thick plain pipe

99

-

2200

... More
200 mm dia 7.1 mm thick slotted pipe

21

-

3200

... More
200 mm dia bail plug

1

-

1800

... More
200 mm dia MS housing clamp

1

-

2000

... More
200 mm dia MS ring

10

-

1400

... More
200 mm dia MS ring

30

-

1400

... More
I section Girder 3.0M long

1

-

7000

... More
200 mm dia TW Housing cover

1

-

2000

... More
Drilling of Bore (Including water arrangement)

-

-

-

... More
Drilling of 550 mm dia from GL to 80 BGL

80

-

2359

... More
Drilling of 550 mm dia bore from 80 to 120 m BGL

40

-

2560

... More
Drilling of 550 mm dia bore from 120 to 160 m BGL

40

-

2694

... More
Drilling of 550 mm dia bore from 160 to 200 m BGL

40

-

2829

... More
Logging of bore

1

-

18000

... More
Per meter rate of drilling may vary as per encreasing/decreasing of drilling

1

-

2829

... More
Welding and lowering of TW Assembly (including electrodes welding set and generator etc. required for completion of work) as per following :

-

-

-

... More
200 mm dia MS ERW Housing pipe from 0 to 80 m BGL

80

-

327

... More
200 mm dia MS ERW/Plane/Sollated pipe from 80 m to 120m BGL

40

-

358

... More
200 mm dia MS ERW Plane/Slotted pipe from 120 m to 160 BGL

40

-

378

... More
200 mm dia MS ERW Plane/Slotted pipe from 160 m to 180 BGL

20

-

378

... More
Supply at site and shrouding of Pea Gravel of Lal Kuan, Haldwani.

63

-

7000

... More
Per meter rate of lowering may vary as per encreasing/decreasing of lowering

1

-

378

... More
Development of Tubewell

-

-

-

... More
By Air compressor of 350 PSI capacity including T&P, labour and material required for completion of work.

70

-

3682

... More
By OP Unit of 3 cusec capacity including T&P, labour and material required for completion of work.

150

-

963

... More
Chemical and bacteriological test

1

-

2200

... More
SCHEDULE ‘G’ for Pumping Plant of T.W.

-

-

-

... More
800LPM,40 m Head Clear water Submersible pump motor complete set.

1

-

90000

... More
Switch Gear with cubical panel

1

-

115000

... More
100mm dia,5.4mm thick MS coloumn pipe with both end flanged and groove in each length 3m long,complete 30m with 1m long top flanged pipe including bend,tee,MS distance piece, inlarger/reducer,sluice valve and refalxe valve etc. complete in all respect.

1

-

145000

... More
Pressure and Depth Gauges with fittings and all required accessories

1

-

8000

... More
Tools (ruputed make)

1

-

6000

... More
Lifting Tackle (1 Ton Capacity, 4.5 M lift)

1

-

20000

... More
Chlorinating plant (Electromechnical) 30 LPH capacity along with complete accessories

1

-

32000

... More
Painting of pumping plants and equipment

1

-

2000

... More
Rubber mat, protection ring, transformer oil& other miscellaneous item.

1

-

15000

... More
Erection of Pumping Plant & other items with power wiring & earthing and other civil work complete in all respect.

1

-

16500

... More
Commissioning & Testing of Pumping Plant

1

-

5000

... More
G.S.M. Controller Complete kit

1

-

25000

... More
Level controller complete kit

1

-

15000

... More
Servo Voltage Stabilizer 20 KVA

1

-

200000

... More
Electro magnetic flow meter of 100mm size

1

-

130000

... More
Internal electriffcation of pump house and chlorinating room with wiring point for light with 1.0mm sq. P.V.C. Insulated nulti strand copper conductor cable in heavy gauge rigid P.V.C. Conduit pipe on surface complete 14 S.W.G. Copper earth continuously wire piano type switch and ceiling rose/angle batton holder on 3 mm. thichphenolic laminated back ligh sheet etc. complete in all respect as per I.E. rule including luminaries sith 15 amp. Switch fuse unit.

1

-

17000

... More
Solar Panel and LED light fitting for electriffation of water works campus as per requiment of site

1

-

25000

... More
Supervision Charges provided by the contractor for E/M works

1

-

30000

... More
25 KVA SUBSTATION WITH TRANSMISSION LINE OR 21000WP SOLAR PENEL WITH INVETER.

-

-

-

... More
SITC of 11 KV/440 V, Sub-station including 25KVA transformer, double poie etc with 11KV HT Transmission Line of ACSR weasel conductor from the nearest existing Ht line and Energy Meter including all equipment complete in all respect . The decision of type of power connection to be provided will be as per direction of Engineer-in-charge at the time of actual work at site.

1

-

577300

... More
21000WP Solar panel with control cable & other necessary item for proper operation of 15 HP submersible pumping plant with ot dip galvanized mounting structure foundation and SITC of 1 KW D.C./A.C. inverter back by solar/electrical supply complete with 600 watt solar plate, solar converter,500 wattx2 battery etc. complete in all respect with all civil work. The decision of type of power connection to be provided will be as per direction of Engineer-in-charge at the time of actual work at site. the bidder must note that only one of the item no. 2.97 OR 2.98 will be executed at the time of work.

1

-

1820000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.