If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

UP Jal Nigam - UPJN Tender

Works
Civil And Construction
Consultancy Services
Pipe Line Project
Civil And Architectural Services
Water Storage And Supply
Eprocure
Opening Date12 Aug 2024
Closing Date28 Aug 2024
Tender Amount₹ 8,81,39,000 
Notes
Download

Costs

Summary

Rehabilitation Of 1.50 Mld Trivenipuram Sps And Laying Of Rising Main

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Wet well

1

-

-

... More
Screen Channel

1

-

-

... More
Pump Room

1

-

-

... More
Survey, review of design and re-design if required, supply & laying of 600 mm dia RCC NP3 Class Socket / spigot pipes, rubber rings jointing materials and specials from store to the work lowering the same in to the trenches upto depth as specified below G.L. true to alignment and gradient, bedding, hydrolic testing & commissioning including barricading of site, traffic diversion arrangement, dismantling of roads, mechanical/ manual excavation, dewatering (as per requirement), shoring & timbering with mild steel/ wooden planks, construction of required class beddings, as per CPHEEO manual in accordance with the provisions laid down in latest version of IS 4111 (Part 1), refilling of trenches with proper compaction including disposal of surplus earth with in 8 km radius, shifting & reinstatement of existing utilities if any, bailing out of water, cost of all jointing material, testing & commissioning etc. complete including supply of all material, labour, T&P etc. required for proper completion of work.

-

-

-

... More
From common Manhole to Screen Channel (Depth- 6.00 to 7.50 m BGL)

25

-

-

... More
Construction of one set Staff quarter type III at Trivenipuram SPS (2 storey) with size and FSI as per the CPWD norms provided in “Revised Plinth Area Norms- for General Pool Residential Accommodation (GPRA) to be constructed for Central Govt. Employees and its applicability to all Govt. Departments, MOUD including supply of all labor, material, T&P etc. complete.

1

-

-

... More
Construction of Air conditioned PLC cum Office of about 40 sqm which will include toilet block including all civil/electro-mechanical works and supply of required furnitures.

1

-

-

... More
Repair and restoration of existing boundary wall including plaster, minimum 2 coat apex paint, gate as per requirement, barbed wire/MS railing over boundary wall including all material, labor, T&P etc.complete. ( length of boundary wall- Approx. 280.0 mtr )

1

-

-

... More
Rehabilitation of existing panel room, DG room, pump room, toilet etc including dismantling of floor, plaster, DG plateform(if required) and construction of Tiles flooring, plastering, painting, door, window, ventilator, garland drain supply, waterproofing and electrical works i.e wiring, lighting, fan etc complete.

1

-

-

... More
Cleaning and desludging of sludge of channel and wet well including disposal of sludge etc complete.

990

-

-

... More
Rehabilitation of approx 6 mtr deep manhole inside the SPS campus including cleaning, plaster and replacement of manhole cover and frame etc complete.

3

-

-

... More
Arrangement of light inside the SPS campus including fixing of pole, light and wiring etc complete.

6

-

-

... More
Land scaping, Plantation, permanent type display board made up of MS Sheet on 500 dia GI pipes and angle support, gas filled fire hydrant etc. including all labor T&P etc complete.

1

-

-

... More
Arrangement of sewage diversion during rehabilitaion of Trivenipuram SPS including hiring charges of pumps and it fittings, Laying of pipe line from common manhole to disposal point in campus, power charges, operater, labor etc complete.

2160

-

-

... More
Construction boring by using minimum 140 mm dia PVC pipe including supply and fixing of submersible pump, starter, connection and Construction of adequate capacity storage reservoir for potable water supply along with rising main and other appurtenant works as per Applicable Laws etc. complete.

1

-

-

... More
 Rehabilitation of internal CC roads of SPS campus (width of road shall be depending on the functional and access requirements of various units within the plant).;

100

-

-

... More
Supply, Installation, testing and commissioning of Close Circuit Television (CCTV) System includes cameras, installation accessories, hardware and software to store data.

1

-

-

... More
Supply, Installation, testing and commissioning of Solar Power Plant upto 40 kW capacity including battery bank arrangement and construction of power bank room etc complete.

40

-

-

... More
Guaranteed Energy Consumption for 1.50 MLD Trivenipuram SPS, Jhunsi including Office, Campus Lighting etc. (Value should be entered , after adjusting for energy generated through solar power plant if proposed to be installed)

-

-

-

... More
For flow upto 1.50 MLD

1

-

-

... More
For flow 1.50 MLD

1

-

-

... More
Average Power Guaranteed (Not to be filled by bidder)(For the purpose of bid evaluation this value to be used, if absurd value will be quoted bid will be summarily rejected)

1

-

-

... More
Power Charges for 1.50 MLD Trivenipuram SPS (= 1.50 MLD x ……….Unit Consumed/MLD x 10.50 x 90 days )(Not to be filled by the bidder)

1

-

-

... More
Laying of Rising main by Open cut method

-

-

-

... More
Supply of all materials labour T&P etc. for fixing baricatting using 100 mm dia Eucliptus wood bellies and 125 mm dia eucliptus. Wood bellies for vertical post spaced 1.5m etc. beeding with naviyal rope property overlapping at the places required and also including dismantling after laying of sewers and reusing in subsequent reacches. The dismantled materials shall remain the property af the contractor

4550

-

-

... More
Dismentalling of Following Types of Road including stacking of servicable materials and disposal of Unservicable materials/ Debris upto 8 km as per direction of Engineer in Charge.

-

-

-

... More
Interlocking Road

395.61

-

-

... More
CC Road

1638.94

-

-

... More
Bituminous Road

3743.96

-

-

... More
Excavation for laying of rising main (up to 3.00 mtr depth below G.L) in ordinary and mixed soil, sand, loam and clay including cutting of jointing pits, trimming dressing leveling refilling of trenches in 20cm layers watering and ramming the same including removal of surplus earth or other dismantled materials up to distance 50m from the centre of trenches.

8667.75

-

-

... More
Survey, review of design and re-design if required, Supply, Carting and laying of 250 mm dia DI K-9 Socket/spigot pipes, rubber rings jointing materials and specials froms store to the work lowering the same in to the trenches up to depth as specified below G.L true to alignment shoring and timbering if required, with mild steel/ wooden planks, refilling of trenches with proper compaction including cost of all jointing material, testing & commissioning including construction of thrust block, supply of all Specials, labour, T&P etc. required for proper completion of work. including supply & fixing of same size/as per specification sluice valve, air valve, scour valve, surge protection, condtruction of chamber etc. as per direction of Engineer In-charge.

-

-

-

... More
Inside the campus

100

-

-

... More
From 1.5 MLD Trivenipuram SPS to 16 MLD Jhunsi STP

4450

-

-

... More
Disposal of excavated of surplus earth during excavation & laying of rising main (Average lead up to 8km) including all labour, T&P etc complete.

8667.75

-

-

... More
Supply and Filling of Local Sand in Trench including watering and ramming etc complete.

6455.97

-

-

... More
Arrangement for Nala Crossing including making temporary earthen bundh, Dewatering arrangmennt, excavation with suplly of all material,Labour,T&P etc. complete.

10

-

-

... More
Reinstatement of the following type of Road for sewers, manholes, sewer connecting chambers etc. including sorting out and stacking of materials ( serviceable materials) and disposal of unserviceable materials upto a distance of 50 m.

-

-

-

... More
Interlocking Road

1806.7

-

-

... More
C.C. road

3537.6

-

-

... More
Bituminous road up to DBM

4422

-

-

... More
Bituminous road (25 mm thick Semi Dense Bituminous Concrete (SDBC) Work)

10318

-

-

... More
Provision for shifting and reinstatement of electric & telephone cable/Poles, Sewer/Water Lines etc. including temporary arrangements for restoration of services during execution of works

4550

-

-

... More
Operation & Maintenance of all civil and E&M works of 1.50 MLD Trivenipuram SPS, rising main and and all executed works for 03 months (excluding cost of power)

-

-

-

... More
1st month

-

-

-

... More
Manpower

1

-

-

... More
Repair and maintenance

1

-

-

... More
Cost of Operational DG set including fuel, lubricant,maitenance etc. Average 1 Hour per day)

1

-

-

... More
2nd month

-

-

-

... More
Manpower

1

-

-

... More
Repair and maintenance

1

-

-

... More
Cost of Operational DG set including fuel, lubricant,maitenance etc. Average 1 Hour per day)

1

-

-

... More
3rd month

-

-

-

... More
Manpower

1

-

-

... More
Repair and maintenance

1

-

-

... More
Cost of Operational DG set including fuel, lubricant,maitenance etc. Average 1 Hour per day)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.