If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

UP Jal Nigam - UPJN Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date29 Jun 2024
Closing Date4 Jul 2024
Tender Amount₹ 2,77,14,000 
Notes
Download

Costs

Summary

Demolishing Of Existing Rcc Oht, Construction Of New Rcc Oht, Laying, Shifting Of Risingmain In Campus, Site Development, Repairing Of Boundary Wall Etc.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work in excavation for pipeline trenches in all type of soil with including lift upto 1.5 m and lead upto 50M, refilling the soil as required, including depositing in layers not exceeding 150mm, watering and compaction to 95% of the Standard Proctor density, level dressing, including supply of all labour, T&P etc. required for proper completion of the work. Including disposal of surplus earth up to 8 Km as instucted by engineer in charge.

24

-

206.9

... More
Construction of RCC thrusht block in 1:1.5:3 with cement, coarse sand and 20 mm guage stone gtit at bends of pipe including supply of all materials, labour, T&P etc. required for proper completion of work

0.25

-

12197.39

... More
Mild steel TMT.Fe-500D in plain work such as reinforced concrete or reinforced brick work (for construction of RCC thrusht block) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and othorised overlapping shall be measured upto floor two level.

0.2

-

9033.6

... More
Dismantling of Interlocking road surface including sorting out and stacking of serviceable materials and disposal of unserviceable materials upto distance of 8km. and also including temporary reinstatement/motorable of road by old materials.

48

-

143.75

... More
Permanent re-instatement of Interlocking road for providing and laying of 80 mm thick M-30 grade C.C. rubber moulded (60% new and 40% old tiles) interlocking paver tiles over 30 mm thick fine sand bed and also including earth wotk in excavation in proper slope & camber including all materials, labour, T&P required for proper completion of work.

48

-

895.31

... More
CONSTRUCTION / RENOVATION OF BOUNDARY WALL Excavation of earth for foundation in ordinary soil (loam, clay or sand) including lift upto 1.5M and lead upto 50M including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches and plinth, disposal of surplus earth upto a distance to 50M from the center of the foundation trenches.

22.54

-

167.29

... More
Concrete with cement, coarse sand and 40 mm nominal size (20 mm-2 part & 40 mm - 6 part) approved stone ballast in proportion of 1:4:8 in foundations including supply of all materials, labour, T&P etc. required for proper completion of the work.

2.97

-

6810.58

... More
Ist class brick work in 1:6 cement & coarse sand mortar in foundation and plinth including supply of all materials, labour, T&P etc. required for proper completion of the work.

13.13

-

5758.33

... More
20 mm thick D.P.C. in cement concrete consisting of 1:2:4 cement, coarse sand and graded stone aggregate 12.5 mm nominal size(10-12.5 mm) and including water proofing(ISI Mark) compound in the proportion as specified by the manufacturer including supply of all materials, labour, T&P etc. required for proper completion of the work.

13.75

-

368.35

... More
12 mm thick plaster in 1:4 with cement and coarse sand mortar for plinth shall be done on both side of brick work upto 15 cm below GL.

27.24

-

195.85

... More
First Class brick work in 1:4 cement and coarse sand mortar in super structure including necessary cutting and moulding of bricks as required and also including supply of all materials, labour, T&P etc. required for proper completion of the work(thickness of wall not be less than one brick).

16.33

-

6303.03

... More
C.C. coping on boundry wall & RCC Piller in 1:2:4 cement, coarse sand and stone grit (10-12.5 mm) including supply of all material, cost of centering, shuttering with extra labour, T&P etc. complete required for proper completion of work.

40

-

172.71

... More
12mm thick plaster with cement mortar in proportion of 1:6 consisting of cement and Banda(Ken)/Hamirpur(Betava) sand over brick work including supply of all materials, labour, T&P etc. required for proper completion of the work.

230

-

155.21

... More
Making groves 15 mm wide on wall plaster as per drawing including supply of all materials, labour, T&P etc. required for proper completion of the work.

122.6

-

51.2

... More
The outer surface of wall finish with two coat of weather coat-All Guard, Apex-Ultima(Premium Acrylic Smooth Exterior Paint with Silicon Additive) with one coat of priming coat of exterior primer over smooth base of white cement based wall putty such as Birla, J.K. wall Putty over the plastered wall surface to prepare the surface even and smooth including supply of all materials, labour, T&P etc. required for proper completion of the work.

230

-

274.61

... More
Campus Development Supply & Laying of 80 mm thick cement concrete paver block of M-30 grade with approved colour, design & pattern inter locking tiles over 30 mm thick fine sand bed over 150mm thick GSB and also including earth wotk in excavation in proper slope & camber, brick work for side alignment including all materials, labour, T&P required for proper completion of work as per direction of Engineer in charge.

75

-

1476.47

... More
Supply & fixing of brick edging laid lengthwise with half brick depth including excavation, refilling and disposal of surplus earth lead upto 50 m for plantation work including supply of all materials, labour, T&P required for proper completion of work as per direction of Engineer in charge.

40

-

47.41

... More
Horticulture, plantation, Land scaping, beautification, internal path way at water works compound including supply of all material, Plant, labour T&P etc. as per approval and direction of engineer in charge

400

-

260



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.