UP Jal Nigam Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

UP Jal Nigam - UPJN Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date11 Jan 2025
Closing Date27 Jan 2025
Tender Amount₹ 5,90,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying in cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded stone aggregate 40 mm nominal size) and curing complete,including cost of form- work, in foundation and floors.

2.97

6471

19220.06

... More
M-150 brick work in 1:6 (one cement and six coarse sand sand of 2.25 fineness modulus) mortar in foundation & plinth including supply of all materials, labour and T & P etc required for proper completion of the work.

6.47

6193

40069.36

... More
M-150 brick work in 1:6 (one cement and six coarse sand sand of 2.25 fineness modulus) mortar in super structor including supply of all materials, labour and T & P etc required for proper completion of the work.

12.96

6379

82675.73

... More
R.C.C. work with cement approved coarse sand and 20 mm. guage approved stone grit im the proportion of 1:1.5:3 in lintels of doors and windows excluding supply of reinforcement and its fixing and binding the same with 24 BWG binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. strength of the concrete shall not beless than M-200.

3.9

8191

31948.41

... More
Mils steel or iron in plain work such as rainforced concrete or reinforced , brick work (whennot included in anover all rates) wrought to required shapeas necessary including bending for proper completion of the work and including spply of its wastage bend hooks and authorised over lapping shall be measurd upto floor two level (PWD 504)

4.5

9661

43476.75

... More
15mm thick plaster with cement mortar in proportion 1:6 cement & c sand 13.5.2

82.92

326

27070.89

... More
15mm thick plaster with cement mortar in proportion 1:6 cement & c sand 13.5.2 fair side

51.74

326

16891.56

... More
Supply and fixing 6 mm (1/4") thick China glazed tiles in flooring or in skirting or dado laid with 1:3 cement and approved coarse sand mortar finished with white cement slurry jointing and polishing complete including supply of all materials, labour and tool sand plants etc. required for proper completion of the work.

76.16

1007

76693.12

... More
Providing and fixing pvc door

4

2137

8550

... More
Mild steel angle iron 40*40*5

9.38

114

1069.32

... More
Supply and fixing of flush doors commercial quality conforming to I.S.2202 Part I (1983) wooden cleats and stoppers and including ixing and adjustment ofhinges, bolts,locks, handle, springs and other fittings with necessary screws to be supplied departmentally.

4.2

2303

9673.44

... More
P/F ventilator

4

2821

11286

... More
Finished wall with water proofing over a priming coat of water proof cement of approved quality such as supper Snowcem, Durocem super quality of required shade etc including curing and cost of all materials labour T&P etc complete

51.74

111

5746.24

... More
Distempering (Two coat) with oil bound distemper of approved brand and manufacture & of required shade on undecorated wall surface to give an even shade over & including a priming coat with cement primer of approved brand & manufacture such as Berger,J&N, Shalimar, Asian paints after thoroughly brushing the surface free from mortar droppings & other foreign matters & also including preparing the surface even with plaster of paris or approved synthetic material & sand papered smooth including supply of all materials labour Tools & plantes etc. required for proper completion of the work.but for every coat after the firsh coat.

82.92

176

14624.6

... More
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.

15.79

148

2340.87

... More
Cement concrete flooring 1:2:4 (1 cement :2 coarse sand :4 graded stone aggregate 12-20mm nominal size laid in one layer neat cement (25 mm thick floor).

17.88

479

8577.93

... More
plaster on roof and step

33.51

326

10940.01

... More
provision for plumbing work ( Approx)

1

38000

38000

... More
provision for Electrical work ( Approx)

1

33250

33250

... More
Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches.

0.45

122

55.15

... More
Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 kms. from the site of work and including watering, dressing etc rate to include cost of all materials labour T & P etc required for proper completion of work.

0.08

1469

117.52

... More
Providing and laying in cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded stone aggregate 40 mm nominal size) and curing complete,including cost of form- work, in foundation and floors.

0.3

6471

1941.42

... More
M-150 brick work in 1:6 (one cement and six coarse sand sand of 2.25 fineness modulus) mortar in foundation & plinth including supply of all materials, labour and T & P etc required for proper completion of the work.

4.14

6193

25639.23

... More
Providing and laying Interlocking Tiles

90

783

70537.5



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.