UP Jal Nigam Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
UP Jal Nigam - UPJN Tender
Pipes and Pipe Related Activities
Eprocure
Opening Date14 Jul 2020
Closing Date21 Jul 2020
Tender Amount₹ 67,10,000
Costs
EMD
₹ 79,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_UPJNM_492842_1Bid Award Id
ViewTender No
513/M-12/194, Dt-07.07.2020Tender Authority
UP Jal Nigam ViewPurchaser Address
-Website
http://http://jn.upsdc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
160 mm dia
1120
-
377.33
... More
63 mm dia
3500
-
59.58
... More
Carting of the following sizes pipes and special from department store to site of work. (within 8 km or within municipal limit) and lowering them in to trenches and laying true to alignment and gradient including testing of pipeline .
-
-
-
... More
PVC Pipe 6kg/cm2
-
-
-
... More
160 mm dia
1120
-
36.77
... More
63 mm dia
3500
-
30.73
... More
Dismantelling & Reinstatement of Bituminous surface including sorting out and stacking of serviceable materials and disposal of unserviceable materials upto a distance of 50 m as per instruction of engineer in charge
460.74
-
1608.77
... More
Dismantelling & Reinstatement of BOE surface including sorting out and stacking of serviceable materials and disposal of unserviceable materials upto a distance of 50 m as per instruction of engineer in charge
464.1
-
395.53
... More
Dismantelling & Reinstatement of Interlocking surface including sorting out and stacking of serviceable materials and disposal of unserviceable materials upto a distance of 50 m as per instruction of engineer in charge
608
-
756.55
... More
Inter connection of proposed new pipe line with old pipe in already excavated trenches including supply of all materials, labour, T & P bailing out of water etc. complete.
8
-
1130.18
... More
Making House Connection with existing PVC/HDPE/AC/D.I. Supply mains including all material, labour, T&P etc complete with in folowing pipeline within the premises of house and as directed by engineer-in-charge.
935
-
3554.76
... More
Dismantelling & Reinstatement of following type of surface in house connection
-
-
-
... More
Bitumiuous Road
35.2
-
1668.46
... More
CC Road
52
-
1158.07
... More
Interlocking
248
-
756.55
... More
BOE surface
110.8
-
380.24
... More
12 mm thick plaster in 1:6 with cement and coures sand mortar over brickk work minimum thickness not to be less than 10 mm, including supply of all materials labour T & P etc. Required for proper completion of the work.
70
-
137.89
... More
Repairs of elecric fittimgs
1
-
6712.66
... More
Supply and fixing of flush door and windows including supply of all materials / labour Tools and plants.
2
-
2955.26
... More
Supply all materials / labour painting of outer surface with weather cost paint of approved quality.
35
-
211.09
... More
2.5 cm thick 1:2:4 plain cement concrete floor with cement approved coarse sand 2cm (1") graded approved stone laid in panels finished with 3mm (1/8") floating coat of neat cement or cement and marble dust in ratio of 5.1 as specified over and including 8cm (3") thick base concrete consisting of cement fine sand of 1.25 fineness modulus and brick ballast 4cm (11/2") gauge in the proportion of 1:4:8 and removing any overlapping mortar at the joint of the panels if any and giving them a uniform finish including supply etc. required for proper completion of the work.
-
-
-
... More
Apron
14.4
-
194.2
... More
Repairing of 25mm thick 1:2:4 plain cement concrete floor 3mm floating cost of neat cement marble dust in ratio 1:5 as specified over and removing any overlapping or mortar at the joints of panels if any and giving them uniform finish including supply of all materials labour anf T&P etc required for proper completion of the work.
38.8
-
84.44
... More
Supply all materials / labour painting of outer surface with weather cost paint of approved quality.
1
-
63327
... More
Repairing of 25mm thick 1:2:4 plain cement concrete floor 3mm floating cost of neat cement marble dust in ratio 1:5 as specified over and removing any overlapping or mortar at the joints of panels if any and giving them uniform finish including supply of all materials labour anf T&P etc required for proper completion of the work.
38.8
-
84.44
... More
Cleaning and qashing work inside of OTH including of labour ang T&P etc required for proper completion of the work.
1
-
3799.62
... More
Painting or varnishing of iron work with one coat priming and two coat of approved paint or varnish including supply of all materials, Labour and T & P etc required for proper completion of the work.
29.7
-
127.09
... More
Colour washing in two coat over ane primer cost with white cement including supply of all materials labour and T& P etc. required for proper completion of the work.
330
-
20.8
... More
Rain water down pipe 100mm dia PVC with fixed MS clamp etc. including supply of all materials labour, T&P etc required proper completion of works.
8
-
329.19
... More
Repairs of electric fittings
1
-
3377.44
... More
Repairs of Sanitation work
1
-
4221.8
... More
Provide all materials, labour T&P etc. required for proper completion of work and construct Boundary wall.
12.4
-
3799.62
... More
Provision for arboriculture for development of water works compound.
1
-
4221.8
... More
Total Schedule G
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements