UP Jal Nigam Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

UP Jal Nigam - UPJN Tender

Works
Pipes and Pipe Related Activities
Eprocure
Opening Date19 Aug 2020
Closing Date31 Aug 2020
Tender Amount₹ 73,55,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Mild steel or iron work in plain work such as RCC work wourght to required shape as necessary including bending for proper completion of work including .

2.36

-

5225

... More
Finishing wall with water proof cement paint of approved make and qualitiy over one priming coat of newwork with 2 coat to give an even shade including prepartion of surface ncluding supply of all material labour T&P etc required for proper completion of work White cement

700

-

68.27

... More
Colour washing using colouring material yellow shade (2 coat)

700

-

17.06

... More
Pipe Line Work Excavation :- Excavation of earth in ordinary soil (loam, clay or sand) for pipe line and rising main trenches including lift upto 1.50 m and lead upto 50 m and refilling watering, ramming of the excavated earth into the trench and also disposal of surplus earth upto 50m from the center of the trenches including supply of all material labour, T&P etc complete as per instructions of Engineer -in -charge.

5292

-

199.08

... More
Distribution System Supply of following sizes pipes for distribution system conforming to latest/ relevant I.S. 4985/2000 Specifications with all jointing materials and specials conforming to latest /relevant I.S. specifications including F.O.R. destination and all taxes and insurance etc. with loading, unloading and Carting up to site of work, also including specials for these pipes and lowering them into the trenches and laying true to alignment and gradient and jointing etc. complete (including testing of pipe lines and cutting of pipes for making up the length but excluding the cost of trenches) all complete as per instructions of Engineer -in -charge. 63 mm dia 6kg/cm² HDEP Pipe

5250

-

99.71

... More
75mm dia 6kg/cm² HDEP Pipe

500

-

147.43

... More
90 mm dia 6kg/cm² HDEP Pipe

300

-

197.69

... More
110 mm dia 6kg/cm² HDEP Pipe

500

-

281.89

... More
140 mm dia 6kg/cm² HDEP Pipe

500

-

422.03

... More
160 mm dia 6kg/cm² HDEP Pipe

200

-

542.51

... More
Supply and carting up to site of work of the following dia C.I. butterfly /sluice valves, class I, working pressure 10 Kg/cm2 confirming to IS: 780/1969 or its latest amendments, F.O.R. destination, and lowering them into the already prepared trenches, fixing in position and jointing them with pipelines and testing etc. complete and also including supply of jointing materials etc. complete .including all taxes and insurance, as per instructions of Engineer -in -charge. Sluice valve - 65 mm dia

3

-

5129.45

... More
Sluice valve - 50 mm dia

3

-

4028.6

... More
Sluice valve - 80 mm dia

2

-

6185.44

... More
Sluice valve - 100 mm dia

1

-

7235.43

... More
Construction of surface box Type Sluice valve chamber as per department type design and drawing including Heavy duty M.S. Manhole Cover and all materials, labour, T&P etc complete for proper completion of work as per instructions of Engineer -in -charge.

8

-

2728.29

... More
Construction of Masonary Type Sluice valve chamber as per department type design and drawing including Heavy duty M.S. Manhole Cover and all materials, labour, T&P etc complete for proper completion of work as per instructions of Engineer -in -charge.

1

-

19230.77

... More
Dismantling of Following type of surfaces including sorting out and stacking of serviceable materials and disposal of unserviceable materials upto a distance of 50m as per instructions of Engineer -in -charge. B.O.E. surface

157.33

-

85

... More
C.C. Road

1195

-

320

... More
Bituminous surface

100

-

220

... More
Inter Locking

550

-

80

... More
Culvert Crossing for 3.5 m wide in all requied completed

1

-

8902.56

... More
Reinstatement of Following type of surfaces including sorting out and stacking of serviceable materials and disposal of unserviceable materials upto a distance of 50m as per instructions of Engineer -in -charge. B.O.E. Surface

157.33

-

190

... More
C.C. Road

1195

-

1200

... More
Bituminous surface

100

-

900

... More
Inter Locking

550

-

300

... More
Crossing of following drains or culverts 1 to 2 m in width for laying of pipe line including dismentalling of drains and reconstruction the same. Main Drains

2

-

4000

... More
Smaill Drains

3

-

2000

... More
Repairing of pipe line leakage including all material labour t&p etc complete. 160 mm pvc pipe

15

-

2207.5

... More
140 mm pvc pipe

25

-

1998

... More
110 mm pvc pipe

30

-

1502.7

... More
90 mm pvc pipe

35

-

1419.5

... More
75 mm pvc pipe

35

-

1295

... More
63 mm pvc pipe

40

-

1233

... More
Interconnection to old pipe line to new pipe line

8

-

3000

... More
Repairing of Sluice valve chamber (Masonry Type) as per department type design and drawing including Heavy duty M.S. Manhole Cover and all materials, labour, T&P etc complete for proper completion of work as per instructions of Engineer -in -charge.

2

-

4807.69

... More
Repairing of Sluice valve chamber (Surface box Type) as per department type design and drawing including Heavy duty M.S. Manhole Cover and all materials, labour, T&P etc complete for proper completion of work as per instructions of Engineer -in -charge.

2

-

682

... More
Making of NEW FHTC Excavation for pipe line work in ordinary soil (loam, clayor, sand) for pipe line trenches including lift upto 1.50m and lead upto 50m and refilling watering ramming of excavated earth in to trenches and disposal od surplus earth up to 50m from centre of the trenches.

1656

-

198.55

... More
Making connection with existing PVC/HDPE mains including labour T&P etc complete.

1104

-

196.58

... More
Same as item no. 1.82 but for pipe laying.

2384.64

-

198.55

... More
Supply & Carting, laying and jointing with special required for 20mm (OD) HDPE out side house including cost of all jointing material labour and T&P testing etc complete.

6624

-

33.96

... More
Supply & Carting, laying and jointing with special required for 15mm (ID) GI pipe in inside house including cost of all jointing material labour and T&P testing etc complete.

1104

-

132.64

... More
Supply & fixing of ISI mark ferrul 8 mm dia including cost of all jointing material labour and T&P testing etc complete.

1104

-

89.46

... More
Supply of PVC. Saddle/Clamp 65mm to 160 mm

1104

-

38.95

... More
Supply of ISI mark bib cock

1104

-

42.73

... More
CC Grouting at base ((Cement concrete work in 1:4:8 (1 cement : 4 coarse sand : 8stone ballast 40 mm NS) ).

13.47

-

5446.79

... More
Survey with Auto level of the entire Distribution system and Design so as to ensure that the system would easly accumlate extra pipe line and FHTC including all material labour T&P etc complete as per site engineer incharge.

20

-

1626

... More
SITC of 1000 LPM, 55 meter head, & 30 H.P. Submersible clear water pumping plant suitable to operate on 415 + 5% volt 50 hz., 3 phase A.C. supply. (As per IS 8034-1989)including cable, with soft starter, control panel, cable complete in all respect with required material T & P labour etc.

1

-

212040

... More
Construction of Rain water Harvesting at Water works Campous Construction of 150 mm dia bore hole in all types soil as per drawing including erection of boring upto the required depth as per the direction of the engineer-in-charge by casing method and extracting back the casing pipe after lowering the PVC pipe including all labour material T&P etc. requierd for proper completion of work. 0 - 30 m

30

-

247

... More
30 - 45 m

15

-

266

... More
Jointing & lowering of 110 mm dia PVC pipe 10 kg/cm2 and johnson V wire screen pipe into the bore hole casing pipe bottom including all jointing material etc. completed as per the direction of the engineer-in-charge. 0 - 30 m

30

-

9.5

... More
30- 45 m

15

-

9.95

... More
Supply of 110 mm dia PVC screwed 60 mm (10 kg/cm2 etc complete.

45

-

231.8

... More
Shrouding/packing the vertical space between bore and PVC pipe with 5 mm to 10 mm size P gravel of approved quality including supply of all material labour, T&P etc. complete.

0.4

-

5200

... More
Excavation of earth in foundation in all type of soil including refilling the excavated earth after completion of the construction of chamber watering ramming dressing etc. complete and disposal of surplus earth within a lead of 50 mtrs.

57.99

-

160.7

... More
Cement concrete work in 1:4:8 (1 cement : 4 coarse sand : 8stone ballast 40 mm NS) in foundation.

1.48

-

5446.79

... More
Brick work in cement mortar 1:6 (1 cement : 6 coarse send)

20

-

5457.72

... More
Mild steel work in RCC work including (beam, baffle wall & slab) cost of mild steel, cutting of bars, bending and placing of the steel in proper position as per the directions of engineer-in-charge.

1.7

-

5035

... More
RCC work in beam and slab in 1 : 3/2 : 3 (1 cement : 3/2 coarse sand : 3 stone aggregate 20 mm NS)

2.2

-

11500

... More
12 mm thick plastering in cement mortar 1:4 (1 cement : 4 coarse sand).

62.92

-

152.21

... More
Supply and placing the graded filter madia of the following sixe in specified layers each 50 cm thick or as per the directions of engineer-in-charge. in filteration chamber. a) 18 mm-20 mm size stone pebbels

2.5

-

2000

... More
b) 10mm-15 mm size stone gravel

2.5

-

1800

... More
c) Coarse sand

2.5

-

1600

... More
Excavation of earth in foundation in all type of soil including refilling the excavated earth after completion of the construction of chamber watering ramming dressing etc. complete and disposal of surplus earth within a lead of 50 mtrs.

29.44

-

161.01

... More
Concrete with 40 mm gauge brick ballast local sand and cement in prop, 1:6:12 in foundation % floor with all labour, T&P etc. required from proper completion of work including materials.

7.36

-

3254.16

... More
First class brick work in 1:6 cement and local sand mortar for drain

33.72

-

5457.72

... More
12 mm thick plastering in cement mortar 1:4 (1 cement : 4 coarse sand).

125.12

-

152.21

... More
40 mm thick 1:2:4 plain cement concrete floor with cement coarse sand & 20 mm gauge stone ballast laid in panels & finished smooth its 3mm floating coat of neat cement etc. & including 75mm thick base concrete consisting of cement local sand & first class brick ballast 40mm gauge in prop 1:4:8 with all labour T&P etc. required for proper completion of work including materials.

27.6

-

2251.5

... More
Note :- Rates quoted should include all taxes excluding GST

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.