UP Cooperative Federation Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

UP Cooperative Federation Limited - UPPCF Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date20 Dec 2024
Closing Soon30 Dec 2024
Tender Amount₹ 15,30,000 
Notes
Download

Costs

Summary

Repairing Of 6000 Mt Capacity Pcf Godown At Nagla Patti Dist Kasganj

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply & Fixing 6 mm thick gray corrugated A.C. Sheet roofing in position including supply of all materials, labour & T and P etc. required for proper completion of the work.

506.7

390

197896.75

... More
Supply and fixing of 0.69mm thick 1.0mm wide G.I. plain sheet in shape of ridge over A.C sheat roofing and also supply and fixing of 40x5mm flat iron as wind tie over G.I. ridge including drilling of holes, welding, cutting rebetting etc. required for proper completion of the work.

102

713

72820.86

... More
Supply & laying one layer of Tarfelt S.T.P grade III of the junction of wall & roof as per direction of E/I including necessary overlap, given a coat of approved Mastic paint/bitumin 85/25 below the Tarfelt & including supply of all materials, labour T&P etc. required for proper completion of work.

281.66

375

105628.13

... More
Dismentelling of grids trusses and other steel work inluding stacking of material as directed by E./I with in a distance of 60 m.

1214.04

3

4152.02

... More
Fabrication and supply of tubler trusses & purlins holding down bolts and bearing plate of section and size as directed by Engineer in charge and as per drawing.

543.1

141

76875.81

... More
Assembling at site hoisting & fixing in position of the tubular plat-form trusses with holding down bolts and fixing of purlins and bracings of trusses including supply of all materials, labour, T&P etc. required for proper completion of work but excluding supply of trusses and its all accessories.

25

1000

25000

... More
M.S. Steel or iron work of heavy sizes and section wind ties etc. wrought to required form including drilling holes rivetting and welding where necessary and also including supply of steel bolts nuts wastage etc. and their fixing required for proper completion of work including providing one coat of steel prime work ties of 40x6mm. flat.

509.2

142

72520.26

... More
Making of Golai of size 15cm at Parapet wall and 25 cm over A.C.sheet of P.C.C 1:2:4 (1 cement, 2 coarse sand, 4 stone grit 10 mm gauge) with floating coad in joint of parapet walls & A.C. sheets and also dismentling of old plaster and cleaning the surface including supply of all material, labour T&P etc. required for proper completion of the work.

230

222

51103.7

... More
Supply and fixing of rolling shutters of approved make of 80x125 mm (3"x18gauge) cold rolled M.S lath inter locked through their entire length joined together at the end by lock & mounted on specially disigned pipe shafts with brackets, side guiders & arrangement are inside and outside locking with push & pull operation complete but excluding the cost of top cover & spring .

18.13

2660

48225.98

... More
Providing & fixing 27.5cm long wire spring grade two for rolling shutters.

6

240

1441.68

... More
Providing and fixing of top cover for rolling shutters made of 18 guage M.S sheet .

15

669

10048.2

... More
Painting two coats on steel and other metal surface up to 10 cm width are grith not exceeding 0.10 sqm. in area with superior synthetic Enamel paint such as Luxol 3, higloss apcolite superlac deluxe specified brusing to give an even shade & including the cleaning the surface of all dust, durt and other foreign matter sand papering and stopping including cost of all materials labour T&P etc. required for proper completion of the work.

210.23

67

14280.92

... More
Providing & Applying leak proof compound over j hooks including supply of all materials, labour T&P etc. required for proper completion of work.

3132

5

15660

... More
Dismantling of existing plaster including disposal of refuse material as directed by E./I with in a distance of 60 m.

167

39

6644.93

... More
First class brick work in 1:6 cement and coarse sand 2.20 fineness modulus mortar in B/W including supply of all materials, labour, T&P etc. required for proper completion of work.

3.46

5193

17968.51

... More
Dismentelling cement concrete floors inluding stacking of dismenteled material as directed by E./I with in a distance of 60 m.

131.4

39

5228.41

... More
R.C.C work with cement, approved coarse sand and 2 cm. gauge approved stone ballast in the proportion 1:1.5:3 excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G. binding wire and including necessary centering and shuttering etc. and including supply of all materials, labour, T&P etc. required for proper completion of work. (Binding wire to be supplied by contractor free of cost.)

2.39

6586

15741.71

... More
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in overall rate) wrought to required shape as necessary including bending for proper completion of work including supply of steel and its wastage bend. Hook & authorized overlapping shall be measured up to floor two level.

2.34

9502

22234.68

... More
12 mm. thick plaster in 1:4 and coarse sand mortar including supply of all materials, labour, T&P etc. required for proper completion of work including proper curing of plaster.

179

260

46575.8

... More
40 mm thick cement, concrete flooring 1:2:4 (1 cement, 2 coarse sand, 4 graded stone aggregate of 20 mm nominal size) laid in one layer finished with floating coat of neat cement.including supply of all materials, labour, T&P etc. required for proper completion of work.

131.4

447

58764.71

... More
Finishing walls with two coat of waterproof cement paint of approved make such as super snowcem, durocem, robiacem, gutlucem quality on previously old treated surface to give an even shade after throughly brushing to remove all durt and remains of loose powdered materials including curing and cost of all all materials labour T&P etc. required for proper completion of the work.

179

85

15236.48

... More
First class brick work in 1:6 cement and coarse sand 2.20 fineness modulus mortar in B/W including supply of all materials, labour, T&P etc. required for proper completion of work.

35.63

5193

185034.07

... More
12 mm. thick plaster in 1:4 and coarse sand mortar including supply of all materials, labour, T&P etc. required for proper completion of work including proper curing of plaster.

310.9

260

80896.18

... More
Finishing walls with two coat of waterproof cement paint of approved make such as super snowcem, durocem, robiacem, gutlucem quality on previously old treated surface to give an even shade after throughly brushing to remove all durt and remains of loose powdered materials including curing and cost of all all materials labour T&P etc. required for proper completion of the work.

310.9

85

26463.81

... More
Earth filling including watering, rammming consolidation and dressing etc. including cost of material, labour, T&P etc. required for proper completion of the work.

321.75

285

91698.75

... More
TOTAL (Sr. No. 1 to 27)

1

1

1301724.63

... More
ADD 18% GST

1

1

234310.43



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.