Unnao Shuklaganj Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Unnao Shuklaganj Development Authority Tender
Eprocure
Opening Date24 Nov 2021
Closing Date7 Dec 2021
Tender Amount₹ 36,04,477
Costs
EMD
₹ 72,100Document Cost
₹ 2,950Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_USDA_646656_1Bid Award Id
ViewTender No
644/V.Pra.(2021-22) Date 23-11-2021Tender Authority
Unnao Shuklaganj Development Authority ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying Cement concrete 1:2:4 ( 1 cement :2 coarse sand : 4 graded stone grit 20 mm. nominal size) including supply of all materials. labour and T&P etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation and floors.SI-279b/2020-21 P.W.D
12
-
7000
... More
R.C.C. Work with cement approved coarse sand and 2 cm. (3/4") guage approved stone grit in the proportion of 1:1.5:3 in Slab i.e. excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I. binding wire, andexluding necessary centering and shuttering etc. and also including supply of all materials, labour and T & P etc. required for proper completion of the work. Binding wire cost being included in this Item. DAR 2019-5.1.2/2020-21
4
-
7120
... More
Centering and shuttering including strutting, propping etc. and removal of form for Slab Analyses Rate
14
-
385
... More
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work(when not included in overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage & overlapping & hooks.SI-504/2020-21 P.W.D
6
-
6570
... More
First Class brick work in 1 : 4 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work.SI-305b/2020-21 P.W.D
63
-
5175
... More
12 mm thick plaster with cement mortar in proportion of 1:3 cement and coarse sand SI-583/2020-21 P.W.D
180
-
185
... More
Extra for compaction of earth work in embankment under optimum moisture condition to give at least 95% provter desity (DAR-2019:16.2 based) P.W.D 2020-21
520
-
8.6
... More
Construction of granular sub-base by providing coarse graded material, spreading in uniform layer with motor grader on perpared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratoy roller to achieve the desired density complete as per clause 401.
For Grading I Material (GSB-I)A/RATE
280
-
3180
... More
Carting of earth beyound 5 Km distance excluding royalty of earth PWD SOR S.I.No. 231/2020-21
520
-
199.4
... More
Providing and laying design mix cement concrete of M-30 grade, in roads/ taxitracks/ runways, using cement content as per design mix, using coarse sand and graded stone aggregate of 40 mm nominal size in appropriate proportions as per approved & specified design criteria, providing dowel bars with sleeve/ tie bars wherever required, laying at site, spreading and compacting mechanically by usingneedle and surface vibrators, levelling to required slope/ camber, finishing with required texture, including steel form work with sturdy M.S. channel sections, curing, making provision for contraction/ expansion, construction & longitudinal joints (10 mm wide x 50 mm deep) by groove cutting machine, providing and filling joints with approved joint filler and sealants, complete all as per direction of Engineer-incharge (Item of joint fillers, sealants, dowel bars with sleeve/ tie bars to be paidseparately). Note:- Cement content considered in M-30 is @ 340 kg/cum. Excess/ less cement used as per design mix is payable/ recoverable separately cement concrete prepared with batch mixing machine DAR 2019- 16.43.1/2020-21 P.W.D
123
-
7448
... More
Providing and laying Rubber moulded Reflective Zig zag 80 mm thick tiles of precast compressed C.C. passing minimum 30 megapascle compressive strength. ISI Marked (in gray base) laid in required over 40mm thick compacted bed of local sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer, filling the joints with local sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand, all complete as per direction of Engineer-in-Charge(Analysers Rate)
1036
-
897
... More
P/L 125 micron polythene over road below C.C (Approved Rate)
615
-
12.25
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements