Unnao Shuklaganj Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Unnao Shuklaganj Development Authority Tender

Works
Pipes and Pipe Related Activities
Eprocure
Opening Date29 Dec 2021
Closing Date4 Jan 2022
Tender Amount₹ 1,16,32,595 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying in cement concrete in 8:4:1 ( stone ballast 8 (40 mm nominal size) : 4 approved coarse sand : 1 cement and curing complete, including cost of formwork in foundation . (PWD S.I No- 281)/2020-21

260

-

5800

... More
Providing and laying design mix cement concrete of M-30 grade, in roads/ taxitracks/ runways, using cement content as per design mix, using coarse sand and graded stone aggregate of 40 mm nominal size in appropriate proportions as per approved & specified design criteria, providing dowel bars with sleeve/ tie bars wherever required, laying at site, spreading and compacting mechanically by usingneedle and surface vibrators, levelling to required slope/ camber, finishing with required texture, including steel form work with sturdy M.S. channel sections, curing, making provision for contraction/ expansion, construction & longitudinal joints (10 mm wide x 50 mm deep) by groove cutting machine, providing and filling joints with approved joint filler and sealants, complete all as per direction of Engineer-incharge (Item of joint fillers, sealants, dowel bars with sleeve/ tie bars to be paidseparately). Note:- Cement content considered in M-30 is @ 340 kg/cum. Excess/ less cement used as per design mix is payable/ recoverable separately cement concrete prepared with batch mixing machine DAR 2019- 16.43.1/2020-21 based on P.W.D SOR 2020-21

337

-

7448

... More
Class M 150 Brick work in 1 : 6 cement and C/ sand mortar in foundation & plinth including supply of all materials, labour Tools & Plants etc. required for proper completion of the work (Analyses Attached) on base of PWD SOR 2021-21

38

-

4824

... More
Part (B)Drain : - Earth Work in excavation for Structure as per drawing and technical specifications clause 305.1 including setting out consrtuction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 M, dressing of sides and bottom and back filling in trenches with excavated suitable material.. PWD SI. NO. 251/2020-21

118

-

124

... More
Providing and laying in cement concrete in 8:4:1 ( stone ballast 8 (40 mm nominal size) : 4 approved coarse sand : 1 cement and curing complete, including cost of formwork in foundation . (PWD S.I No- 281)/2020-21

92

-

5800

... More
Class M 150 Brick work in 1 : 6 cement and C/ sand mortar in foundation & plinth including supply of all materials, labour Tools & Plants etc. required for proper completion of the work (Analyses Attached) on base of PWD SOR 2021-21

328

-

4824

... More
12 mm. thick plaster With 1:3 cement & and coarse sand Mortar.. UPPWD S.O.R. S.I. No.583/2020-21

1553

-

185

... More
Providing and laying in cement concrete 4:2:1 of not less than strength of M150 stone ballast (20 mm. nominal size) :2 approved coarse sand:1 cement and curing complete, including cost of formwork in foundation and floors.UPPWD S.O.R. S.I. No.279(b)/2020-21

30

-

7000

... More
R.C.C. Work with cement approved coarse sand and 2 cm. (3/4") guage approved stone grit in the proportion of 1:1.5:3 in Slab i.e. excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I. binding wire, andexluding necessary centering and shuttering etc. and also including supply of all materials, labour and T & P etc. required for proper completion of the work. Binding wire cost being included in this Item. DAR 2019-5.1.2/2020-21 PWD

30

-

7120

... More
Centring and shuttering including strutting, propping etc. and removal of form for Slab (Attached Analyses)

158

-

385

... More
Mild steel (Tor steel or plain) or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised overlapping shall be measured up to floor two level . (PWD S.I No- 504) /2020-21

132

-

6570

... More
Part (C)Laying Sewer Line : - Earth Work in excavation for Structure as per drawing and technical specifications clause 305.1 including setting out consrtuction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 M, dressing of sides and bottom and back filling in trenches with excavated suitable material.. PWD SI. NO. 251/2020-21

585

-

124

... More
Providing and laying in cement concrete in 8:4:1 ( stone ballast 8 (40 mm nominal size) : 4 approved coarse sand : 1 cement and curing complete, including cost of formwork in foundation . (PWD S.I No- 281)/2020-21

102

-

5800

... More
Supply and Carting of 250 mm dia 2.0 M long RCC Hume Pipe NP3 Class pipes and specials from store to the site of work lowering the same in trenches in depth, 0 to 1.50 m below ground level, true to aligment caulking the joints with necessary spun yarn soaked in bitumen and jointing with 1 : 2 cement mortar in coarse sand including excavation of earth below invert level of pipe. Cost of all jointing materials, testing etc. complete but exckuding the excavation and refilling of trenches from ground level to the invert level of pipes.(Analyses Attached) (A) 250 mm dia pipe (depth 0.0 - 1.50 M below G.L.

771

-

1125

... More
Construction of brick masonary chamber of size 0.60x0.90x1.50 Mas per standard design with base concrete 1:6:12, 23 cm thick brick wall in 1:6 cement and coarse sand, plastering 1:3 cement and coarse sand with neat finish including ferro cement cover fixed with RCC 1:2:4 including supply of all materials, labour T&P ctc. required for proper completion of the work. (Analyses Attached)

60

-

13020

... More
Construction of brick masonary Manhole of size 0.90xx1.20x1.50 M as per standard design with base concrete 1:6:12, 23 cm thick brick wall in 1:6 cement and coarse sand, plastering 1:3 cement and coarse sand with neat finish including ferro cement cover fixed with RCC 1:2:4 including supply of all materials, labour T&P ctc. required for proper completion of the work. (Analyses Attached)

13

-

17810

... More
Add/Deduct of masonary shaft (a) 0.60 x 0.90 M dia x1.50 M size (Analyses Attached)

19

-

-5290

... More
(b) 0.90 x 1.20 M dia x1.50 M size (Analyses Attached)

2.6

-

-7020

... More
Supply and Carting of 150 mm dia 60 cm long stone ware glaged pipes and specials from store to the site of work lowering the same in trenches in depth, 0 to 1.50 m below ground level, true to aligment caulking the joints with necessary spun yarn soaked in bitumen and jointing with 1 : 1 cement mortar in coarse sand including excavation of earth below invert level of pipe. Cost of all jointing materials, testing etc. complete but excluding the excavation and refilling of trenches from ground level to the invert level of pipes (Analyses Attached)

432

-

780

... More
Part (C)Laying Sewer Line : - Earth Work in excavation for Structure as per drawing and technical specifications clause 305.1 including setting out consrtuction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 M, dressing of sides and bottom and back filling in trenches with excavated suitable material.. PWD SI. NO. 251/2020-21

950

-

124

... More
Supply/Laying of following sizes and type of Supureme,Kisan & Jain Make PVC Pipe 160 mm dia 6 Kg Pressure ISI make pipes including jointing such as solvent cement/rubber ring Bend, Tee, Reducer & Socket etc. including F.O.R. destination and all taxes and insurance etc. with loading unloading stacking all complete. (A) 90 mm dia O/D (PWD SOR Chapter 1 Material S.No.17/32)/2020-21

740

-

223

... More
(B) 110 mm dia O/D (PWD SOR Chapter 1 Material S.No.17/31)/2020-21

315

-

321

... More
Supply and Fixing of following fitting including F.O.R. destination and all taxes and insurace etc with loading unloading & stacking all complete.(A) Fire Hydrant 100 mm dia class II DSR I.No. 18.59.2/2019

2

-

3480

... More
(B) P/F of C.I. double acting Air valvece valves of approved quality with bolts, nuts rubber insertions etc.(the tail pice if required will be paid separately. 100 mm dia class II DSR I.No. 18.59.2/2019

1

-

6750

... More
( C )P/F of C.I. Sluice valves (with cap) complete with bolts, nuts rubber insertions etc.(the tail pice if required will be paid separately. 100 mm dia class II DSR I.No. 18.31..2/2019

3

-

3480

... More
Construction of brick Chamber masonary For Fire Hydrant, Scour Valve & Sluice Valve Chamber of 0.60 m x 0.60m x 1.00 m as per standard design with base concrete 1:6:12, 23 cm thick brick wall in 1:6 cement and coarse sand, plastering 1:3 cement and coarse sand with neat finish including RCC cover 8 cm thick including supply of all materials, labour T&P ctc. required for proper completion of the work (Analyses Rate)

6

-

7225

... More
Making Connection with existing Pipe Line of with including 90 mm dia pvc clamps, Ferrule including 25 mm G.I. pipe including all complete. With 90 mm dia (Analyses Rate)

20

-

2290

... More
Providing and laying S&S C.I. Standard specials such as tees, bends, collars tapers and caps etc, suitable for flanged jointing as per IS : 1538 : :Up to 300 mm dia DSR I.No. 18.66.1/2019

3

-

6340



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.