Town And Country Planning Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Town And Country Planning Department Tender
Civil And Construction
Civil Works Others
Building Construction
Eprocure
Opening Date19 Sep 2022
Closing Date10 Oct 2022
Tender Amount₹ 5,27,000
Costs
EMD
₹ 52,700Document Cost
₹ 766Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_TACPD_729488_5Bid Award Id
ViewTender No
11Tender Authority
Town And Country Planning Department ViewPurchaser Address
-Website
http://http://uptownplanning.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Excavation in foundation in ordinary soil( Loam,clay or sand) including lift up to 1.5 M,and lead upto 30 M and including filling watering and ramming of excavated earth into the trenches or into the plinth and removal and disposal of surplush earth as directed by the Engineer-in-charge up to a distance of 30 M from the foundation trenches (Where machine con not reach/move) For building work only,(Excluding royalty)
21.6
-
120
... More
Cement Concrete with 4cm gauge approved brick ballast coarse sand and cement in proporation of 1:4:8 inculuding supply of all materail labour and T&P etc.required for proper completion.
21.6
-
3350
... More
M-150 brick work in 1:3 with (one cement and six fine sand of 1.25 F.M mortar) in Superstructure i/c cutting necessary and moulding of brick inculuding supply of all meterials,labour and T&P etc.reuired for proper complete of work.
4.14
-
5100
... More
R.C.C lighter beam having spans upto 6M work and in colom with cement approved coarse sand and 2Cm gauge approved stone grit in proporation of 1:2:4 in lintels of doors,windows and sunsheds excluding supply of reinforcement and lits bending but i/c its fixing and binding the same with 24 B.W.G.G.I Binding wire and i/c necessary centering and shuttering etc.and supply of all material, labour and T&P etc.requried for proper compaction of work.Binding wire of Supplied by the contractor free of cost.
3.17
-
7850
... More
M-150 brick work in 1:3 with (one cement and six fine sand of 1.25 F.M mortar) in Superstructure i/c cutting necessary and moulding of brick inculuding supply of all meterials,labour and T&P etc.reuired for proper complete of work.
33.12
-
5100
... More
12mm thick Plaster in 1:3 with cement,coarse sand mortar including supply of all material ,labour and T&P etc.required for proper completion of work
288
-
190
... More
Mild steel or iron in plain work such as concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work.
3.74
-
6150
... More
Fabrication of door & windows chaukhat frame with 40x40x6mm size angle including cost of hings including supply of all material,labour and T&P etc.required for proper completion of work
13.19
-
6550
... More
Applying Oil Bond distempering with primer coatincluding supply of all material ,labour and T&P etc.required for proper completion of work
288
-
84
... More
Applying two coat enaimel paint over one coat primer including supply of all material ,labour and T&P etc.required for proper completion of work
38.97
-
72
... More
Add CGST+SGST @12% of Estimate cost
1
-
56496