THDC India Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

THDC India Limited - THDC Tender

Works
Energy, Oil and Gas
Eprocure
Opening Date14 Mar 2024
Closing Date15 Apr 2024
Tender Amount₹ 63,56,00,000 
Notes
Download

Costs

Summary

Setting Up Of Grid Connected 11 Mw Ac) Floating Solar Pv (fspv) Plant

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply of Anchoring and mooring system as specified in tender documents

1

-

-

... More
Supply of Power Conditioning Unit (Inverters) as specified in the Tender Documents

1

-

-

... More
Supply of String monitoring Box as specified in Tender Documents

1

-

-

... More
Supply of Inverter Transformer as specified in the Tender Documents

1

-

-

... More
Supply of Cabling system as specified inTender documents

1

-

-

... More
Supply of SCADA System as specified in

1

-

-

... More
Supply of Weather Monitoring System

1

-

-

... More
Supply of Panel and Switchgear as specified in Tender Documents

1

-

-

... More
Supply of Illumination System as specified in tender Documents

1

-

-

... More
Supply of Fire Protection and Fire Fighting System as specified in Tender documents

1

-

-

... More
Supply of Evacuation System

1

-

-

... More
Supply of Balance of System like Metering system, Earthing System , Lightining Protection System, including all Equipments, Materials, Spares, Accessories, safety equipments etc. excluding items mentioned under item no. 1 to 14

1

-

-

... More
Sub total- A

-

-

-

... More
Grand Total A ( Supply from Abroad)

-

-

-

... More
Employer will pay the amount for BCD+SWS & SD/ADD against the submission of documentary evidence with a MAXIMUM CEILING of BCD+SWS & SGD/ADD charges as mentioned by the Bidder in the Price Schedules No 1 at the time of bidding. Bidders are required to quote the applicable BCD+ SWS & SGD/ADD with due diligence & appropriate financial prudence, as afterwards bidders will not be able to change or claim such taxes & duties already quoted during the bid. No BCD+SWS & SGD/ADD will be reimbursed to the contractor in the absence of documentary proofs. Abbreviations used: I BCD: Basic Custom Duty, SWS: Social Welfare Surcharge , SGD: Safegaurd Duty , ADD : Anti Dumping Duty, GST: Goods & Service Tax, CIP: Carriage Insurance Paid

-

-

-

... More
Bidders are required to fil the relevant portion/Parts/Line items/scope of the respective Price Schedules only. In case, any line item is left blank by the bidder, it will be deemed assumed by the Employer that such portion/Parts/line item/Scope has been considered by the bidder suitably somewhere else in the Price schedules.

-

-

-

... More
Supply of Items is deemed to be inclusive of Spare recommended by OEMs

-

-

-

... More
In case the bidder don't want to mention any quantity/price in any particular line item, then he has to put zero (0) against that particular line item.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.