THDC India Limited Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
THDC India Limited - THDC Tender
Energy, Oil and Gas
Eprocure
Opening Date23 Jan 2024
Closing Soon6 Mar 2025
Tender Amount₹ 20,00,00,00,000 This is an estimated amount, exact amount may vary.
AI Insights
Technical
Technical
Financial
Bid Capacity
... View More
Bid Capacity = (2 X A X N) – B Where: A = Indexed value of maximum value of works executed (in an ongoing or completed project) in any one year during last 5 years, keeping index of inflation as 6% (compounded annually) for calculating ’A’ at present Price Level. N = Completion period of the subject Contract Package in years, considered as 5 Years for calculation of bid capacity. B = Value of existing commitments and on-going works to be completed in next “N” years. The Bid Capacity should not be less than the estimated cost of the work put to tender.
Technical Capacity
... View More
The bidder is required to have prior work experience in executing or getting executed hydro power projects or other infrastructural works. The details of the reference work are to be provided, including name of hydro power plant or pumped storage project, capacity, location, client, and scope of civil work. Additionally, the bidder needs to provide information on the quantity of work executed in the last 10 years. The bidder should have experience in development of on/off stream pumped storage projects (600 MW to 2000 MW) on concept to commissioning on turnkey contract with operation & maintenance for 15 years in various states in India. No specific percentage of similar works completed is mentioned. However, the bidder should provide details of past experiences in a specified format, along with relevant documents. The bidder's compliance to the specified Qualifying Requirement (QR) will be ascertained based on the details of reference plants declared in the specified format. The bidder should have completed works of a similar nature, with a value calculated as the indexed value of the maximum value of works executed in any one year during the last 5 years, keeping an index of inflation as 6% (compounded annually). The Bid Capacity of the bidder should not be less than the estimated cost of the work put to tender, calculated as (2 X A X N) – B, where A is the indexed value of the maximum value of works executed, N is the completion period of the subject contract package in years (considered as 5 years), and B is the value of existing commitments and ongoing works to be completed in the next N years. The value of working capital is mentioned as at least 2 times the monthly cash flow requirement, which is calculated as {(5.5 Crores per MW) x (quoted capacity) x 2 / Construction period in months}. However, no specific amount or percentage of similar works completed is mentioned.
Costs
EMD
₹ 10,00,00,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_THDC_791852_1Tender No
THDCIL/NCR/CC-468Tender Authority
THDC India Limited ViewPurchaser Address
-Website
http://https://www.thdc.co.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Civil Works Supply - Steel & Metals
1
-
-
... More
Civil Works Supply - Other than Steel & Metals
1
-
-
... More
Substation Works & Transmission Line System Related Supply
1
-
-
... More
Electrical & C&I Works Supply
1
-
-
... More
Misc. Equipment (other than Specified Above)
1
-
-
... More
TOTAL (A) (Plant and EQUIPMENT)
-
-
-
... More
Mandatory Spares
-
-
-
... More
Hydromechanical Related Works
1
-
-
... More
Electromechanical Related Works
1
-
-
... More
Electrical & C&I Works - Related Works
1
-
-
... More
Any other Spares Envisaged
1
-
-
... More
TOTAL (B) (MANDATORY SPARES)
-
-
-
... More
TOTAL SCHEDULE-1 (A + B)
-
-
-
... More
Detailed break up for each item in to sub items would be made during detailed Milestone Break up and its finalisation.
-
-
-
... More
Interchangeability and Packing: All spares supplied under this contract shall be strictly interchangeable with parts for which they are intended
replacements.
-
-
-
... More
Identification : Each spare shall be clearly marked and labeled on the outside of the packing with its description when more than one spare part is packed in single case, a general description of the contents shall be shown on the outside of such case and a detailed list enclosed. All cases, containers and other packages must be suitably marked and numbered for the purpose of identification.
-
-
-
... More
The prices quoted in Schedule Nos. 1, 2, & 3 & 3A shall be inclusive of all Taxes, Duties, Levies & charges, except Goods and Services Tax (GST), payable in the Employer’s country. Goods and Services Tax (GST) applicable in the Employer’s country as on seven (7) days prior to the deadline for Bid submission on goods and services specified in Schedule Nos. 1, 2, 3 & 3A shall not be included in respective schedules, but shall be quoted separately in Schedule No. 6.
-
-
-
... More
Unless stated otherwise a 'set' means items or sub-items required for each type/size range of the assembly/sub-assembly, required for complete replacement in one equipment / system as the case may be. It is further, intended that the assembly/sub-assembly which have different orientation (like left hand or right hand, top or bottom), different direction of rotation or mirror image positioning or any other reasons which result in maintaining two different sets of the spares to be used for the subject assembly/sub-assembly, these shall be considered as different types of assembly/sub-assembly.
-
-
-
... More
The cost of Special Tools & Tackles are also included in the Price Bid.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%