Telangana State Forest Development Corporation Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Telangana State Forest Development Corporation Limited - TSFDC Tender
Civil And Construction
Civil Works Others
Opening Date19 Mar 2022
Closing Date4 Apr 2022
Tender Amount₹ 30,76,676 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
304949Bid Award Id
ViewTender No
6.2.2515/HDM/2021-22Tender Authority
Telangana State Forest Development Corporation Limited ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of Compound wall;7) Supply,Cutting to required length welding wher ever Required,Griding the edges, Applying a primary coat of Red oxide, Fabrication,Hoisting and instalation allas per specifications at all hig a) ISA 72*72*72*72*4 mm Vertical posts of total length of Box section
1372.74
-
165827
... More
Construction of Compound wall;6) Flush Pointing to RR/ CRS Masonry in CM (1:3) including cost and conveyance of all materials in site, excluding seigniorage charges, curing, labour charges etc. complete for finished item of work as per SS
450
-
53410
... More
Construction of Compound wall;5) to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating
45
-
366830
... More
Construction of Compound wall;4)CR stone masonry in 2nd sort in CM (1:8) prop: (cement : sand) using hard granite stones from approved quarry including cost and conveyance of all materials like cement, sand water, granite stones, etc., from approved quarry to site and including labour for cutting stones to required size and shape, mixing of cement, mortar, construction, scaffolding charges, curing etc., complete for finished item of work in foundation & basement. (APSS No. 615 & 601)
202.5
-
1154124
... More
Construction of Compound wall;3) Random Rubble Stone masonry in CM (1:8) prop: (cement : sand) using hard Granite stones from approved quarry including cost and conveyance of all materials like cement, sand water, granite stones, etc., from approved quarry to site and including labour for cutting stones to required size and shape, mixing of cement, mortar, construction, scaffolding charges, curing etc., complete for finished item of work in foundation & basement. (APSS No. 615 & 601)
180
-
895342
... More
Construction of Compound wall;2) Plain Cement Concrete (1:4:8) proportion nominal mix 2) (cement: fine aggregate: Coarse aggregate) for foundation levelling courses and below flooring beds using 40mm size (SS5) hard Granite metal upto Plinth level from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, excluding seigniorage charges, sales & other taxes on all materials and including all charges for mixing, laying concrete in foundations ramming in 15 cm layers finishing top surface to the required level curing etc., complete for finished item of work. (APSS No. 402) for:-Machine Mix-PCC (1:4:8) NOMINAL MIX
30
-
165506
... More
Construction of Compound wall;1) Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308)
240
-
68088
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements