Super Speciality Paediatric Hospital And Post Graduate Teaching Institute Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Super Speciality Paediatric Hospital And Post Graduate Teaching Institute Tender
Healthcare and Medicine
Eprocure
Opening Date21 Apr 2018
Closing Date11 May 2018
Tender Amount₹ 5,00,000
Costs
EMD
₹ 10,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_SSPHP_193773_1Bid Award Id
ViewTender No
03/2018 Dated 20.04.2018Tender Authority
Super Speciality Paediatric Hospital And Post Graduate Teaching Institute ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Sand filling in foundation including supply of necessary quantity of sand, watering and dressing etc. rate to including cost of materials, labour and T&P etc. required for proper completion of the work.
12.39
22397
1808
Cement concrete in 1:4:8 with cement, sand and 40 mm granite stone ballast (crusher broken) in foundation including supply of all materials, labours and T&P etc. required for proper completion of the work .
18.09
71885
3974
M 150 brick work in 1:6 cement and fine sand of 1.25 F.M. mortar in foundation and plinth including supply of all materials, labours and T&P etc. required for proper completion of the work .
26.92
148717
5524
Providing & injecting Chemical for pre-construction anti-termite treatment Icluding chemical, Labour T & P complete of the work.
99.87
18475
185
R.C.C. work with cement approved course sand and 2 cm (3/4)” gauge approved stone ballast in the proportions of 1:1½;3 in Slab excluding supply of reinforcement and its bending but including its fixing and bending the same with 24 B.W.G.G.I. Binding wire and including necessary centering and shuttering etc. and also including Supply of all materials, labours and T&P etc. required for proper completion of work binding wire cost being including in the item but for Raft foundation work.
14.05
90870
6469
R.C.C. work with cement approved course sand and 2 cm (3/4)” gauge approved stone ballast in the proportions of 1:1½;3 in Slab excluding supply of reinforcement and its bending but including its fixing and bending the same with 24 B.W.G.G.I. Binding wire and including necessary centering and shuttering etc. and also including Supply of all materials, labours and T&P etc. required for proper completion of work binding wire cost being including in the item but for Column work.
4.19
34254
8185
Supply and filling of Earth in plinth also including supply of all materials, labour and T&P etc. required for proper completion of the work. (Room)
40.5
12190
301
R.C.C. work with cement approved course sand and 2 cm (3/4)” gauge approved stone ballast in the proportions of 1:1½;3 in Slab excluding supply of reinforcement and its bending but including its fixing and bending the same with 24 B.W.G.G.I. Binding wire and including necessary centering and shuttering etc. and also including Supply of all materials, labours and T&P etc. required for proper completion of work binding wire cost being including in the item but for Plinth Band/Lintel Band.
12.32
83930
6812
First Class bricks works in 1:6 cement and coarse sand of 1.25F.M. mortar in above supply of all materials, labour and T&P etc. required for proper completion of the work. But in super structure in 230mm wall including providing scaffolding rope, chahlies fixing and removal. In Super Structure.
25.32
153421
6060
R.C.C. work with cement approved course sand and 2 cm (3/4)” gauge approved stone ballast in the proportions of 1:1½;3 in Slab excluding supply of reinforcement and its bending but including its fixing and bending the same with 24 B.W.G.G.I. Binding wire and including necessary centering and shuttering etc. and also including Supply of all materials, labours and T&P etc. required for proper completion of work binding wire cost being including in the item but for Slab Work.
14.48
103611
7155
First Class bricks works in 1:4 cement and coarse sand of 1.25F.M. mortar in above supply of all materials, labour and T&P etc. required for proper completion of the work. But in super structure in 4" wall including providing scaffolding rope, chahlies fixing and removal. In Super Structure
3.12
19724
6322
Mild steel or iron in plain work such as reinforcement concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including of the work and including supply of all steel and wastage & over lapping & hooks, including cost of binding wire.
47.28
267888
5666
15mm thick plaster with cement mortar over brick work minimum thickness not to be less than 3/6”(12mm) thick including supply of all materials labour and T&P etc. required for proper completion of the work for proper completion of the work but with cement and approved coarse sand in 1:6 cement & fine sand of 1.25F.M. mortar. (Room)
124.26
19633
158
12mm thick plaster with cement mortar over brick work minimum thickness not to be less than 3/8”(10mm) thick including supply of all materials labour and T&P etc. required for proper completion of the work for proper completion of the work but with cement and approved coarse sand in 1:6 cement & fine sand of 1.25F.M. mortar. in outside
244.63
30823
126
12mm ceiling plaster with cement mortar (1:3) neat finish over brick work minimum thickness not to be less than thick including supply of all materials labour and T&P etc. required for proper completion of the work for proper completion of the work but with cement and approved coarse sand in 1:6 cement & fine sand of 1.25F.M. mortar.
145.17
24243
167
20mm thick plaster with cement mortar (1:2) neat finish over brick work minimum thickness not to be less than thick including supply of all materials labour and T&P etc. required for proper completion of the work for proper completion of the work but with cement and approved coarse sand in 1:2 cement & fine sand of 1.25F.M. mortar.
43.39
9806
226
Providing and fixing of M.S. angle iron Z section window (approved Section) with Specified design of grill out side openable design of window and gril as per approved drawing 10mmsq bar 75mm c/c and 3no. bar group @ 75mm and four group in horizontal including providing stay and one coat of red oxide primer excluding glass pans. (W6)
792
70986
89.63
Supply and fixing of M.S. Sheet Shutter i/c all material, Labour T & P complete of the work.
12.24
31701
2590
Providing & laying “Brick bat Coba” 100 mm thick laid with M-150 class brick bat coba 7.50 cm thick with gap of 15mm to each other 20mm thick base of cement mortar 1:4 cement and coarse sand mixed with water proofing compound spreading cement slurry mixed with aerelic cement concrete water proofing compound filled gaps of coba & top of coba mortar mixed with water proofing compound in 1:4 cement and coarse sand mortar finished smooth & top mashed false square 30cmx30cm and side wall parapet shall be monotypic plaster wall upto 30cm higher and junction and corner shall be rounded by brick ballast cement and coarse sand and masonry coba with top finishing plaster mixing with acetic water proofing compound @ 2% by weight & including supply of all materials labour T&P etc. required for proper completion of work and as per direction of E.I.C.
94.88
92415
974
Fixing Panes of glass with equal or equivalent ISI marked quality putty Brads and springs and including supply of all materials and labour ete complete. (3.80 to 4.7mm thick)
19.8
9088
459
Painting or Varnishing on iron works in small areas or new wood work with one coat of ready mixed priming paint & one coat of approved superior quality ready mixed paint or clear synthetic varnish including Supply of all materials labour and T&P etc. required for proper completion of the work. Paint to be used should confirm to the ISI no.103 1950 (In two coat.)
21.78
2029
93.2
Supply and fixing galvanised Mosquitos proof, heavy quality iron wire gause or expanded metal of heavy quality ever Window & Including Suppy, Material, Labour T & P.
19.8
14414
728
White cement base Putty 1.00mm thick approved brand and making smood surfaces.
514.06
44902
87.35
One Priming coat & one coat Oil distemper on new work including Supply of all materials labour and T&P etc. required for proper completion of the work. (In two coat.)
269.43
18348
68.1
Finishing walls with Apex paint of approved make and quality on new work with two coat to give an even shade, including Supply of all materials labour and T&P etc. required for proper completion of the work.(in two coat)
244.63
18077
73.9
Supply and fixing 100mmø CI pipe complete with rose heads bends M.S. Clamps 2.5cmX3mm fixed to walls by 15cm long 6mmø nail and including repair of plaster pointing etc if damaged during fixing of the pipes including cost of all material labour, tools and plant etc. required for proper completion of work.
25.2
32848
1303.5
40mm(1½”) thick 1:2:4 plain cement concrete floor with cement, approved coarse sand and 2cm(3/4”) graded approved stone laid in panels finished with 3mm. (1/8”) flooring coat of neat cement or cement and marble dust in 5:1 as specified over removing and over lapping mortar at the joints of panel sand removing any and giving them a uniform finish including Supply of all materials labour and T&P etc. required for proper completion of the work.
136.66
43319
317
Supply & Fixing 3.8/40mm glass strip including, labour, material T & P.
409.97
21523
52.5
Supply & Fixing 100mm C.I. P/Band
12
6216
518
Filling of Excavated Earth including leveling Dressing, Watering Complete.
57.37
5163
90
Making of Deep line in Plaster.
191.04
2292
12
Making of Drip coarse in 1:3 Cement & Sand included all material T & P
18.4
331
18
For Electrical Work
1
108000
108000
Supply & Fixing of Graninite Stone i/c writing comp.
1
4000
4000
photographs
1
1000
1000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements