Saharanpur Development Authority Tender
... More
The SDA has issued a formal invitation for competitive bids for the Saharanpur Development Authority project, for Construction of CC road in TPN Part-3 in Saharanpur, Uttar Pradesh, with an estimated contract value of Rs. 2,82,93,924. The bid opening date for this tender is 08-08-2018 and the last date for bid submission is 05-09-2018. Interested bidders for Saharanpur Development Authority tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Saharanpur Development Authority - SDA Tender
Eprocure
Opening Date8 Aug 2018
Closing Date5 Sep 2018
Tender Amount₹ 2,82,93,924
Costs
EMD
₹ 14,15,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_SDA_237253_1Bid Award Id
ViewTender No
493E/3/SDA/18-19Tender Authority
Saharanpur Development Authority ViewPurchaser Address
-Website
http://http://www.sdasaharanpur.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Cement Concrete with 2cm, guage approved stone grit coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, tools & plants etc required for proper completion of the work. SI-279(a)
100.31
506565
5050
... More
c) WBM Grade 3 (22.4-53mm stone ballast.) Providing laying spreading and compacting stone aggregates of specifice size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100kN in stages to proper grade and camber, applying and brooming stone screening/binding materials to fiil-up the interstices of coarse aggregate, watering and compacting to be required density grading 3 as per Technical Specification Clause 405.
1127.73
2464090
2185
... More
Nala/Drain/Cleaning ………………. Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50M and lead upto 30M and including filling watering and ramming of excavated earth into the trenches in water and liquied mud and under foul condition. SI. no. 251+258(a)+258(b)
637
78351
123
... More
Scrapping old painted/SDBC/BM/WBM surface upto 10cm to 40cm depth including disposal of all scrapped material to a distance of 30 meters (100ft) as directed by engineer in charge. SI-772.
14651
58604
4
... More
12 mm thick plaster with cement and coarse sand of 1:4 over brick work minimum thickness not to be less then icm including suppy of all materials labour, tools and plants etc. requried for proper completion on work. SI-584(a)
2004.16
290603
145
... More
Construction of un-reinforced dowel jointed at expansion and construction joint only plain Cement Concrete pavement thickness as per design over a prepared sub base in 1:1.5:3cement coarse and fine aggregates confirming to IS 383 maximum size of coarse aggregates not exceeding 25 mm mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weight batcher using approved mix design laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing) spreading by the concerete with shovels. ..................... curing of concrete slabs for 14 days, curing compound (Where specified) ............. including Cost of Polythene Sheet and Dowel bar and also including complete shifting of materials & Concrete etc complete work. New item no. 9 (Road work)
3807.99
22467141
5900
... More
M-150 Brick work 1:3 cement & three coarse sand in foundation and plinth including supply of all materials labour, Tools & plants etc. required for proper completion of the work. SI-307.
461.41
1910237
4140
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements