Saharanpur Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Saharanpur Development Authority - SDA Tender

Works
Eprocure
Opening Date25 Feb 2019
Closing Date6 Mar 2019
Tender Amount₹ 8,64,455 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing laying spreading and compacting stone aggregates of Grade 3 (22.4-53mm stone ballast.) specifice size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100kN in stages to proper grade and camber, applying and brooming stone screening/binding materials to fiil-up the interstices of coarse aggregate, watering and compacting to be required density grading 3 as per Technical Specification Clause 405.Analised

31

67735

2185

... More
Construction of un-reinforced dowel jointed at expansion and construction joint only plain Cement Concrete pavement thickness as per design over a prepared sub base in 1:1.5:3cement coarse and fine aggregates confirming to IS 383 maximum size of coarse aggregates not exceeding 25 mm mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weight batcher using approved mix design laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing) spreading by the concerete with shovels. ..................... curing of concrete slabs for 14 days, curing compound (Where specified) ............. including Cost of Polythene Sheet and Dowel bar and also including complete shifting of materials & Concrete etc complete work. New item no. 9 (1) (Road work)

62

372000

6000

... More
Excavation in foundation in ordinary soil including lift upto 1.50M and lead upto 30M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal & disposal of surplus earth as directed by E/I upto a distance of 30M from foundation trenches. SI 251a

21

1722

82

... More
Concrete with 4cm guage Stone ballast, coare sand and cement in proportion of 1:5:10 including supply of all materials labour T&P etc required for proper completion of work.Analised

13

35750

2750

... More
M-150 Brick work 1:4 cement & four coarse sand in foundation and plinth including supply of all materials labour, Tools & plants etc. required for proper completion of the work. SI-305a

31

124000

4000

... More
Cement Concrete with 4cm, guage approved stone ballast, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, tools & plants etc required for proper completion of the work. SI-279

3.5

17675

5050

... More
12 mm thick plaster with cement and fine sand of 1.25 fineness modulus in 1:3 including neat cement floating coat over brick work minimum thickness not to be less then icm including suppy of all materials, labour, tools and plants etc. requried for proper completion on work.SI-584

65

9425

145

... More
RCC work with cement, approved coarse sand and 2cm gauge approved stone grit in proportion 1:1.5:3 in slab excluding supply of rainforcement and its bending but including its fixing and binding the same with 24 BWGGI binding wire and including necessary centering and shuttering etc and supply of all material, labour, tools and plants required for proper completion of work including cost of binding wire. S.I. -284

2.5

16500

6600

... More
M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks and authorised overlapping shall be measured and including cost of binding wire.S.I.-504

3

16800

5600

... More
Eatrhwork: Excavation in trenches for foundations and pipes cables etc. in ordinary soil (Loam, Clay or Sand) including lift upto 1.5m lead upto 50m and drassing of sides and ramming of bottom disposal of surplus excavate earth as directed by Engineer-in-charge with lead of 50m. (As pr jal nigam 2018)

17

1394

82

... More
Supply and stacking of PVC pipe 6kg/sqcm pressure ISI marked all complete required for proper complition of the work. (As pr jal nigam 2018)75mm diameter pipe

85

8478

99.75

... More
Making connection with Existing water Line of dia 75mm to proposed water line of 75mm dia including all complete

1

2400

2400

... More
Making connection with Existing water Line of dia 75mm to Houses Connection of 20mm dia including all complete

66

72270

1095



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.