Rural Water Supply And Sanitation Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Rural Water Supply And Sanitation Department - WSSO Tender

Works
AMC Maintenance Contracts
Eprocure
Opening Date16 Oct 2020
Closing Date28 Oct 2020
Tender Amount₹ 2,05,00,00,000 
Notes
Download

Costs

Summary

Danti Group Of Villages Water Supply Scheme (based On Surface Water) And Piped Ground Water Supply Schemes (42 Nos), District-mirzapur

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Water Treatment Plant Survey, Investigation, Planning, Design, Construction and Commissioning trial run and O&M of WTP as per capacity given below :- For construction of WTP, Admin Building, Chemical Building, Command Control Room, and fire fighting arrangements, first aid, chlorination building & shed, Circular Cascading Aerator with overloading (surface loading rate as per CPHEEO Manual ), Inlet chamber, ventury flume with overloading, alum dosing, pre-sedimentation Tank, Flash Mixer with depth: width ratio 3:1 , Horizontal flow Clarifloculator with overloading , Rapid Gravity Filters with one standby and with Back Wash Arrangement and pumps, compressor etc, inlet and outlet arrangement with overloading, Proper Sludge Disposal and Backwash water disposal arrangements to nearest drain/low laying area & Appurtenant Works of the below-mentioned capacity, automated through PLC with outputs to SCADA, 1.0 m wide walkway in between WTP components with railing in two rows, Guard Room, Chemical House in two stories with 7 days temporary storage, Store house with 1 month storage capacity plus extra capacity for other sundry articles, Gaseous Chlorination house and chlorine cylinder store room with 1 month storage capacity, water pumps and chlorinators with standby, chlorine neutralization tank, chlorination chamber, by pass arrangements, Security Guard Room, including one laboratory block of 60 sqm minimum area or as per recommendation of CPHEEO Manual on Water Supply and Treatment, whichever is more; provided with one Chemist room, one office room and remaining part for storing the chemicals and conducting the test, toilet. with laboratory equipments and chemicals as listed below etc. strictly as per CPHEEO manuals, Development of WTP area with adequate plantation, Rainwater harvesting unit. Raw water to be treated and filtered. Lean concrete to be used of grade not less than M-10 and other structures in minimum M-30 grade of concrete. Cement and steel should be as per approved by the Employer/IS codes. Collapsible MS steel and aluminium doors and aluminium windows to be provided including of three-coat whitewashing, internal two coat snowcem painting, external painting with apex ultima/equivalent paint, all steelwork must be painted with red oxide paint and two coat of anticorrosive paint inside of all tanks etc. and ventilation, internal and external electrification,including all panels, cables and earthing as required, with adequate LED lights for the compound, including automation, instrumentation & SCADA, wireless telemetry (voice & data) Including of supply of all materials (mechanical , electrical works, gates, pipes, valves electrical operated etc.), labour T&P etc. required for proper completion and commissioning works with automatic operations of works as per direction of the Engineer and consultant. The overloading values and all other items not included above shall be as per provision of manual of CPHEEO GOI.

-

-

-

... More
Minimum Essential Equipments for Chemical Testing and Microbiological Testing at each WTP site (WTP Cost should be inclusive of all the Equipments)

-

-

-

... More
Computer

1

-

-

... More
U.P.S.

1

-

-

... More
Inverter (Back Up Time 3 hrs)

1

-

-

... More
A.C. ( As per specification)

1

-

-

... More
pH meter

1

-

-

... More
Thermometer

1

-

-

... More
Turbidity Meter

1

-

-

... More
TDS Meter

1

-

-

... More
Hot Air Oven

2

-

-

... More
DO Meter

1

-

-

... More
Fluoride Ion Meter

1

-

-

... More
Spectrophotometer

1

-

-

... More
Pipette aid

2

-

-

... More
Quartz Double Distillation Plant

1

-

-

... More
Weighing Balance

1

-

-

... More
Online UPS

1

-

-

... More
Magnetic Stirrer

1

-

-

... More
Water Bath

1

-

-

... More
Fume Cup Board

1

-

-

... More
Bottle top dispenser

1

-

-

... More
Filtration assembly for chemical analysis

1

-

-

... More
Rectangular Hot Plate

1

-

-

... More
Incubator

1

-

-

... More
Autoclave

1

-

-

... More
Laminar Air Flow

1

-

-

... More
Colony Counter

1

-

-

... More
FIltration assembly for Microbiological Analysis

1

-

-

... More
Micropipette

1

-

-

... More
Microscope

1

-

-

... More
Refrigerator(Capacity-300L)

1

-

-

... More
100 ml Beaker

20

-

-

... More
200 ml Beaker

5

-

-

... More
500 ml Beaker

2

-

-

... More
1000 ml Beaker

2

-

-

... More
2000 ml Beaker

2

-

-

... More
50 ml Conical

10

-

-

... More
100 ml Conical

10

-

-

... More
250 ml Conical

10

-

-

... More
5 ml Measuring Flask

5

-

-

... More
10 ml Measuring Flask

5

-

-

... More
25 ml Measuring Flask

5

-

-

... More
50 ml Measuring Flask

5

-

-

... More
100 ml Measuring Flask

5

-

-

... More
250 ml Measuring Flask

5

-

-

... More
DO Bottle 1 litre

5

-

-

... More
0.1 ml Pipettes

2

-

-

... More
1 ml Pipettes

2

-

-

... More
5 ml Pipettes

2

-

-

... More
10 ml Pipettes

2

-

-

... More
20 ml Pipettes

2

-

-

... More
50 ml Burette

2

-

-

... More
20 ml Test Tube with out Rim

50

-

-

... More
Petridish 3 cm dia

20

-

-

... More
10 ml Measuring Cylinder

5

-

-

... More
25 ml Measuring Cylinder

5

-

-

... More
50 ml Measuring Cylinder

5

-

-

... More
100 ml Measuring Cylinder

5

-

-

... More
100 ml Measuring Cylinder

2

-

-

... More
Glass Rods

5

-

-

... More
Dessicator

1

-

-

... More
Digestor

1

-

-

... More
In Danti Scheme : WTP of Capacity of 17 MLD

1

-

-

... More
Clear Water Reservoir cum Pump House

-

-

-

... More
PUMP HOUSE - Survey, Investigation, Planning, Construction, Commissioning of Pump houes of required size to accomodate required nos of pumps mentioned item nos. 4. For the construction of Pump House above CWR, minimum 4.5 m height is to be kept with suitable arrangements to install and dismantle VT pumps and installation of Fire Extinguishers, Power wiring & earthing system, Panels and cable of required size, rubber resistance sheets, spares for motors & switchgear, internal & external electrifications and adequate LED lighting, brickwork 1:4 (one cement and four sand), plasterwork 1:6 (one cement and six sand). Steel and cement to be used as per approved by Engineer-in charge / IS code. Reinforced Cement Concrete minimum M-25 to be used including fixing of doors, windows, shutters, glass panels with gantry girder arrangement with supply and fixing of suitable sizes of steel girder including snowcem painting two coat over one priming coat using approved Colour and shade and whitewashing three coat of ceiling of pump house and painting over new ironwork with one coat of primer and two coat of approved paint including cost of all arrangement of shuttering, scaffolding and water with supply of all materials, labors T&P etc. required for proper completion of works as per direction of the Engineer.

-

-

-

... More
CLEAR WATER RESERVOIR- Survey, Investigation, Soil Testing, Planning, Construction, Commissioning of CWR of capacity as detailed below. The Concrete in a minimum grade of M-30 and steel to be used as per IS code and approved by Employer. Seismic effects and wind load with earthquake resistance should be taken into account in the design. CWR should be provided with a ventilator, manhole of adequate size. An aluminium ladder minimum of 0.45 m wide in manhole should be provided. Ultrasonic water level indicator should be provided along with lighting conductor as per IS 2309. PCC of M-10 grade to be used in bed blocks. Overflow arrangement with the supply & installation of pressure pipe of the same dia as that of the inlet, for taking overflow water to a suitable low lying area. Painting of all steel and concrete pipes with 3 coats of approved cement plaster and anticorrosive paint including all labour, material, T & P etc, all required for proper completion of works as per the direction of the Engineer.

-

-

-

... More
In Danti Scheme:

-

-

-

... More
CWR at WTP of 1800 Kl Capacity cum Pump House

1

-

-

... More
CWR-1 of 1500 Kl Capacity cum Pump House

1

-

-

... More
CWR-2 of 900 Kl Capacity cum Pump House

1

-

-

... More
Extra for cost variation due to soil bearing capacity (SBC) from assumed SBC of 12 MT/Sqm for 1 MT/Sqm or part thereof

1

-

-

... More
Supply, Erection and Testing of V.T. pump water-lubricated to lift the required discharge at required head with sufficient column pipe including shaft with discharge head and bowl assembly all complete as per IS:2010 along with power control panel, soft starters, control system panels, voltage stabilizer of required capacity, EM Flow Meters, piping manifolds( Suction and delivery including all specials like bend, Tee,NRV, Sluice valve etc.) instrumentation & SCADA, wireless telemetry (voice & Data) including all materials, labour, T&P etc. all required for proper completion of works as per the direction of the Engineer. If land and the site is permissible, then HSC pumps may be permitted in approval of the employer.

-

-

-

... More
In Danti Scheme:

-

-

-

... More
Discharge 5865 LPM , Head 37m ± 10% for Intake well to WTP

4

-

-

... More
Discharge 4850 LPM , Head 42m ± 10% for WTP to CWR1

4

-

-

... More
Discharge 1000 LPM , Head 62m ± 10% for WTP to ESR4

2

-

-

... More
Discharge 2900 LPM , Head 34m ± 10% for CWR1 to CWR2

4

-

-

... More
Discharge 1200 LPM , Head 36m ± 10% for CWR1 to ESR5

2

-

-

... More
Discharge 2750 LPM , Head 39m ± 10% for CWR1 to ESR6

2

-

-

... More
Discharge 1050 LPM , Head 39m ± 10% for CWR2 to ESR1

2

-

-

... More
Discharge 2600 LPM , Head 46m ± 10% for CWR2 to ESR2

2

-

-

... More
Discharge 2200 LPM , Head 33m ± 10% for CWR2 ESR3

2

-

-

... More
Survey, Investigation, Planning, Construction, Commissioning, Design, Drawing as per latest I.S. CODE & all design should be vetted by any IIT institute or govt engineering college. for construction of electric power sub-station room for 50 KVA above load of size 4 x 3.5 x 3.5 meter or as per required including supplying and fixing transformer (As per following KVA ), transformer foundation, supplying & fixing of Air handling unit, Bus Coupler with 2 incoming & 1 outgoing ACB, steel tubular pole, ACSR Conductor, Lighting arrestor, Disc Insulator, Stone Metal Spreading, including cable inside the substation as per requirement along with snowcem painting two coat over one priming coat using approved Colour and shade and painting over new iron work with one coat of primer and two coat of approved paint including cost of all arrangement of shuttering, scaffolding and water with supply of all materials, labours T&P etc. required for proper completion of works as per direction of the Engineer.

-

-

-

... More
In Danti Scheme:

-

-

-

... More
200 KVA Transformer ( 1 W + 1 S )

1

-

-

... More
250 KVA Transformer ( 1 W + 1 S )

1

-

-

... More
160 KVA Transformer ( 1 W + 1 S )

1

-

-

... More
125 KVA Transformer ( 1 W + 1 S )

1

-

-

... More
Construction of Over Head Tank of different capacities and staging heights as mentioned below. Supply of all materials labour T&P etc. compete and construction of R.C.C. (M30 Grade) with main components, Instruments & SCADA, wireless telemetry (voice & Data) including cost of soil testing. All the components of O.H.T. will be casted in M30 concrete with cement, coarse sand and approved stone grit as per I.S. 11682 and I.S.456.Seismic effects and wind load should be taken into consideration as I.S. 1893 for earthquake resistance and I.S. 875 part-III for wind load on structure (this area is in seismic Zone III and high damage risk zone for wind) Proper ventilator at top dome in circular shape along with an R.C.C. cover and thickness, pillar of ventilator should be minimum 50 cm height. The space between top dome and R.C.C. cover should be covered with mosquito net of standard quality alongwith expanded metaled jali, Ultrasonic type Water level indicator and EM flow meter and residual chlorine sensor/ transmitter. The indicator board scale made of 3mm thick M.S. plate should have a clear width of minimum 25cm painted with good Asian paint.It should also consists of 3mm brass wire rope minimum 4 smooth pulleys about 8 cm dia with guides,15cm dia copper ball float which shall be completely water tight suitable pointer of brass etc.Lightening conductor as per I.S.S.2309 of its latest amendments of latest electricity rules.It should consist proper elevation rod with 5 or more fork points proper down conductors of prescribed metal of proper size prescribed by ISS 2309-1969 and ISS 3013-1966C.I. manhole of min 60x60cm size made of M.S.channel section with adequate cover made of M.S. sheet of minimum 3mm thickness hinged with manhole with locking arrangement. This manhole should be fix at top dome at proper place.Supply, fixing,jointing of following size of C.I.D/F Pipes with C.I.D/F specials conforming to IS 8329/2000 as vertical pipes for inlet,outlet,overflow and washout as per latest / relevant I.S. specifications with all jointing materials for proper completion of work including other appurtenant works and excavation in all types of soil. Including Out let pipe as max size of distribution system, Inlet pipes size as rising main size, Over flow pipe as minimum rising main size & Wash out pipe 100 mm dia. Supply and Fixing of manually operated valves/sluice valves with hand wheels as per ISS 700/1969 or its latest amendments class “A” working pressure 10 Kg/cm2 Including cartage from its store to the site of work, lowering them into trenches, fixing in position and testing etc. Complete, Construction of bed blocks in 1:2:4 PCC with cement,coarse sand and approved stone grit under each duck foot bend to support the vertical pipes. These bed blocks should supported on the raft not on the soil.Construction of sluice valve chamber for above sluice valve/Butterfly valve as per departmental type design and drawing including supply of all labour T&P complete. Construction of washout / overflow chamber as per departmental type design and drawing.Painting of all concrete surface and steel pipe works with three coats of approved cement paint and anticorrosive paints.Supply & laying of 200 mm dia PVC pipe as per I.S.-4985/2000 or as latest / relevant specification including all taxes and insurance etc.F.O.R. destination for disposal of water from overflow and washout chamber to suitable point outside the water works compound including excavation of trenches. Laying of pipe line etc. required for proper completion of works as per direction of the Engineer.

-

-

-

... More
In Danti Scheme:

-

-

-

... More
350 KL, 15 m staging

1

-

-

... More
Extra for cost variation due to soil bearing capacity (SBC) from assumed SBC of 12 MT/Sqm for 1 MT/Sqm or part thereof

1

-

-

... More
900 KL, 18 m staging

1

-

-

... More
Extra for cost variation due to soil bearing capacity (SBC) from assumed SBC of 12 MT/Sqm for 1 MT/Sqm or part thereof

1

-

-

... More
750 KL, 22 m staging

1

-

-

... More
Extra for cost variation due to soil bearing capacity (SBC) from assumed SBC of 12 MT/Sqm for 1 MT/Sqm or part thereof

1

-

-

... More
350 KL, 15 m staging

1

-

-

... More
Extra for cost variation due to soil bearing capacity (SBC) from assumed SBC of 12 MT/Sqm for 1 MT/Sqm or part thereof

1

-

-

... More
400 KL, 18 m staging

1

-

-

... More
Extra for cost variation due to soil bearing capacity (SBC) from assumed SBC of 12 MT/Sqm for 1 MT/Sqm or part thereof

1

-

-

... More
950 KL, 12 m staging

1

-

-

... More
Extra for cost variation due to soil bearing capacity (SBC) from assumed SBC of 12 MT/Sqm for 1 MT/Sqm or part thereof

1

-

-

... More
Excavation of earth in ordinary soil (loam, clay or sand) for pipe line and rising main /Feeder Main & Distribution System trenches including lift upto 1.50 m and lead upto 50 m and refilling watering, ramming of the excavated earth into the trench and also disposal of surplus earth upto 50m from the centre of the trenches including supply of all material labour, T&P etc. required for proper completion of works as per direction of the Engineer.

-

-

-

... More
Excavation of Medium Rock

100

-

-

... More
Excavation in mixed soil with bajri kankar mooram etc.

207105.5

-

-

... More
Excavation in in ordinary soil (loom, clay, sand)

113912.54

-

-

... More
Supply, Laying & Jointing of following sizes (G.I. / D.I. K-7 / 9) pipes for rising/feeder main & distribution system conforming to latest/relevant I.S. 8329/2000 Specifications with all jointing materials such as D.I. S/S or flanged Specials conforming to latest /relevant I.S. specifications with rubber gasket also, suitable for G.I. / D.I pipes, as per IS-1239 /2000 and IS 8329/2000 or their latest amendment including F.O.R. destination and all taxes and insurance etc. with loading, unloading and Carting up to site of work, also including specials for these pipes and lowering them into the trenches and laying true to alignment and gradient and jointing etc. complete (including hydro testing of pipe lines and cutting of pipes for making up the length but excluding the cost of trenches).all required for proper completion of works as per direction of the Engineer.

-

-

-

... More
250 mm dia DI pipe Class K-7

10669

-

-

... More
300 mm dia DI pipe Class K-7

1179

-

-

... More
350 mm dia DI pipe Class K-7

4546

-

-

... More
150 mm dia DI pipe Class K-9

3544

-

-

... More
200 mm dia DI pipe Class K-9

10556

-

-

... More
250 mm dia DI pipe Class K-9

12909

-

-

... More
350 mm dia DI pipe Class K-9

11225

-

-

... More
450 mm dia DI pipe Class K-9

9554

-

-

... More
500 mm dia DI pipe Class K-9

8488

-

-

... More
Supply, Laying & Jointing of following sizes HDPE pipes (PE-100)-PN-6 for distribution system conforming to latest/ relevant I.S. 4984/1995 Specifications with all jointing materials and specials conforming to latest /relevant I.S. specifications including F.O.R. destination and all taxes and insurance etc. with loading, unloading and Carting up to site of work, also including specials for these pipes and lowering them into the trenches and laying true to alignment and gradient and jointing etc. complete (including testing of pipe lines and cutting of pipes for making up the length but excluding the cost of trenches) all complete as per instructions of Engineer -in -charge.

-

-

-

... More
63 mm dia HDPE Pipe

245089

-

-

... More
75 mm dia HDPE Pipe

12314

-

-

... More
90 mm dia HDPE Pipe

14193

-

-

... More
110 mm dia HDPE Pipe

16005

-

-

... More
140 mm dia HDPE Pipe

20656

-

-

... More
160 mm dia HDPE Pipe

7563

-

-

... More
200 mm dia HDPE Pipe

18547

-

-

... More
Supply and carting up to site of work of the following dia double flange sluice valve/Scour Valve confirming for IS 14846 including worn gear arrangement as per test pressure, stainless steel spindle, caps,including inspection charges, transportation upto store, unloading and stacking in all respect and lowering them into the already prepared trenches, fixing in position and jointing them with pipelines and testing etc. complete and also including supply of jointing materials etc. complete .including all taxes and insurance, as per instructions of Engineer -in -charge.

-

-

-

... More
PN 1.0

-

-

-

... More
250 mm dia

5

-

-

... More
200 mm dia

13

-

-

... More
150 mm dia

7

-

-

... More
100 mm dia

7

-

-

... More
PN 1.6

-

-

-

... More
500 mm dia

2

-

-

... More
450 mm dia

2

-

-

... More
350 mm dia

2

-

-

... More
300 mm dia

2

-

-

... More
250 mm dia

4

-

-

... More
200 mm dia

4

-

-

... More
150 mm dia

3

-

-

... More
125 mm dia

2

-

-

... More
100 mm dia

1

-

-

... More
Gate Valve

-

-

-

... More
80 mm dia

3

-

-

... More
65 mm dia

14

-

-

... More
Supply and installation of under ground sluice value type fire hydrant consisting of 80 mm dia sluice valve, 80mm dia tail pieces, 80mm dia duck foot bend and 80 mm dia standard makes iron coupling with cap and etc. complete conforming to latest/relevant I.S.specifications including all taxes and insurance up to site of work and lowering them into the trenches, fixing in position and jointing them with pipelines and testing etc. complete (including supply of jointing materials etc. complete as per instructions of Engineer

6

-

-

... More
Providing and supplying Kinetic Double Orifice type Air Valves confirming to IS 14845 specifications having small orifice elastic ball resting on a gun metal orifice nipple, large orifice vulcanite ball seating on moulded seat ring, with built in Kinetic features, isolating sluice valve mounted in horizontal position and operated by wheel gearing, inlet face and drilled, including insurance,loading, unloading, transportation upto stores in all respect etc. complete as per instructions of Engineer.

-

-

-

... More
20 mm dia

7

-

-

... More
80 mm dia

77

-

-

... More
100 mm dia

36

-

-

... More
Construction of following type chambers as per department type design and drawing including Heavy duty R.C.C. Manhole Cover and all materials, labour, T&P etc. complete for proper completion of work as per instructions of Engineer

-

-

-

... More
Sluice/Scour valve chamber (surface box Type)

44

-

-

... More
Sluice valve chamber (masonry Type)

-

-

-

... More
upto 200 mm dia

3

-

-

... More
from 250 mm to 300 mm dia

3

-

-

... More
From 350 mm to 450 mm dia

4

-

-

... More
from 500 mm dia to 600 mm dia

2

-

-

... More
Scour valve chamber (Masonry Type)

-

-

-

... More
upto 200 mm dia

7

-

-

... More
From 250 mm to 300 mm dia

8

-

-

... More
Air Valve Chamber

-

-

-

... More
20 mm dia

7

-

-

... More
80 mm dia

77

-

-

... More
100 mm dia

36

-

-

... More
Fire Hydrant chamber

6

-

-

... More
Design and construction of Thrust Block made in R.C.C. with cement, coarse sand & 20 mm gauge stone ballast in proportion of 1:1.5:3, for pipe line, including supply of MS reinforcement wrought to required shape as necessary ,its bending, fixing & binding the same with 0.50 mm thick binding wire in position & necessary centering & shuttering including curing and supply of all materials, labour, T & P etc. required for proper completion of the work and as per specifications for RCC work as per instructions of Engineer

-

-

-

... More
150 mm dia

3

-

-

... More
200 mm dia

8

-

-

... More
250 mm dia

9

-

-

... More
350 mm dia

8

-

-

... More
450 mm dia

7

-

-

... More
500 mm dia

6

-

-

... More
Dismantling of Following type of surfaces including sorting out and stacking of serviceable materials and disposal of unserviceable materials upto a distance of 50m as per instructions of Engineer

-

-

-

... More
Bituminous Road

10443

-

-

... More
CC Road

5859.48

-

-

... More
BOE Road

18485.69

-

-

... More
Interlocking Road

500

-

-

... More
Restoration of the following type of road surface with old and new materials including supply of all materials, labour, T&P etc. required for proper completion of the work as per instructions of Engineer.

-

-

-

... More
Bituminous Road

10443

-

-

... More
CC Road

5859.48

-

-

... More
BOE Road

18485.69

-

-

... More
Interlocking Road

500

-

-

... More
Construction of single tap pillar type stand post as per type design as per instructions of Engineer

164

-

-

... More
Supply of all materials, labour, T & P etc. required and construct RCC Chair for Nalla crossing as per type design including supply and materials labour, T&P etc. complete as per instructions of Engineer -in -charge.

-

-

-

... More
Up to 350 mm dia.

36

-

-

... More
400 to 600 mm dia.

27

-

-

... More
Provision for crossing of nalas, road culvert including shifting of telephone cables etc. along the alignment of pipe line etc. complete as per instructions of Engineer -in -charge.

-

-

-

... More
Provision for crossing of Road (FOR 7.0 M WIDE)

15

-

-

... More
Provision for crossing of Cannel, road culvert including shifting of telephone cables etc. along the alignment of pipe line including etc. complete as per instructions of Engineer.

25

-

-

... More
Supply of all materials, labour, T & P etc. required and construct Brick Masonry Pedestal for Nalla crossing as per type design including supply and materials labour, T&P etc. complete length 2.00 to 3.00 m. (for DI pipe Distribution)

144

-

-

... More
Horizontal directional drilling for steel duct / Pipes : Installation of steel product pipe by HDD method including preparing and setting up the plant and equipment, preparing new pipe/work material, installing new pipe work and commissioning system or making the system ready for commissioning by capital HDD operation including, all related civil and mechanical works like excavation, shoring/strutting, etc. drilling stringing, rimming, and pulling back the new pipe work on the design bore pipe path alignment, proper disposal of drilling fluid and backfill of site after completion all-inclusive as per IndSTT:101-2018: Code of practice for horizontal direction drilling technique suiting Indian conditions etc. required for proper completion of the work as per instructions of Engineer.

-

-

-

... More
200 mm dia

80

-

-

... More
500 mm dia

100

-

-

... More
600 mm dia

100

-

-

... More
Manufacturing, providing and supplying spirally welded / ERW/ SAW / fabricated M. S. pipes (Commercial Quality) including procurements of plates, gas cutting to required size rolling, tack welding assembling in suitable lengths to form pipes, welding on automatic welding machine and forming ‘V’ edge on both ends of pipes including railway freight, insurance, unloading from railway wagon, loading into truck, transport to stores, unloading, stacking, excluding GST levied by GOI & GOM in all respect etc. complete as per IS - 3589 and IS-5504 as applicable as per specifications (N0 negative tolerance in thickness is permissible) etc. required for proper completion of the work as per instructions of Engineer.

-

-

-

... More
200 mm dia 10 mm thick

80

-

-

... More
500 mm dia 10 mm thick

50

-

-

... More
600 mm dia 10 mm thick

100

-

-

... More
Making house connection from distribution line upto atleast 2 m inside the Boundary wall of house with Tap, with supply of 1 m G.I. pipe & average 10.0 mtr. MDP Pipe including specials, Brass ferrule, Saddle clamp etc. of suitable size, T&P etc. including excavation, laying and jointing for proper completion of work as per instructions of Engineer

15791

-

-

... More
In Danti Scheme : 15791

-

-

-

... More
Construction of 1.5 m high and 115mm thick boundary wall with 230 mmx230 mm thick pillar made in Brick masonry in 1 cement and 4 sand mortar, the spacing between two pillar should not be more than 3.0 m c/c and the depth of foundation should not be less than 0.60m, at the site of water works, CWR and ESR as per departmental type design and drawing, and, as per specifications given in the bid document including supply of all materials, labour T&P etc. for proper completion of work as per instructions of Engineer

1351.2

-

-

... More
Supply and fixing of 3.6 m x 1.50 m MS gate including fabrication and supply of steel and construction of boundary wall pillars of size 1.5mx0.30mx0.30m with ornamental brick work 115mm thk. around RCC, as per departmental type design and drawing and as per specifications laid down in the bid document, including supply of all material, labour,T&P etc.required for proper completion of work as per instructions of Engineer

3

-

-

... More
In Danti Scheme : 9

-

-

-

... More
Supply and fixing of 1.5m wide MS wicket gate including fabrication and supply of steel and construction of boundary wall pillars etc. as per specifications laid down in the bid document, including supply of all material, labour,T&P etc. required for proper completion of work as per instructions of Engineer

3

-

-

... More
Laying of 80 mm thick CC pre rubber moulded interlocking paver tiles including 30 mm thick fine sand bed over (280 mm thick) compacted base of two layers of GSB and WMM, paid separately and also including earth work in excavation in proper slope and camber including all labour, T & P etc. required for proper completion of work as per instructions of Engineer -in -charge.

888

-

-

... More
In Danti Scheme : 888

-

-

-

... More
Construction of semi circular 300 mm dia drain for water works, as per departmental type design and drawing and as per specifications laid down in the bid document, including supply of all materials, labour, T&P etc.required for proper completion of work as per instructions of Engineer

301.44

-

-

... More
Earth filling work for proper levelling of water work site, in accordance with the contour map and Grid map of existing site enclosed, including levelling, dressing, excavation and filling of earth where necessary and also including all labour, materials, T&P etc. required for proper completion of works and also including carriage of earth from within a distance of about 8 km. from the site of works as per instructions of Engineer (Provisional)

500

-

-

... More
SINGLE ROOM STAFF QUARTER- construction of staff quarter for pump operator, chaukidar, pump attendant as per departmental type design attached with tender documents including excavation in foundation in ordinary soil/ kanker/ morrum/ soft rock/hard rock,PCC 1:4:8 with cement local sand and 40mm gauge ballastFirst class brick work in 1:4 cement and sand mortar, 12 mm thick plaster in 1:6 cement and sand mortar,mild steel or iron work ,supply and filling of carted earth up to plinth level ,25mm thick 1:2:4 plain cement concrete floor and 45 cm wide apron with 2 cm gauge stone ballast laid in pannels,finished with 3 mm floating coat of neat cement and 75 mm thick base concrete 1:4:8 ,supply and fixing of 3mm thick glass strip of 25 mm width in joint ,MS angle iron chaukhat 40x40x5mm size ,40 mm thick ISI flush door shesham wood,window shutter ,HDPE Tank of 500 liter capacity ,galvanized mosquito proof heavy quality iron wire gauge 1.50mm mesh over window with wood batten 50x12 mm and snowcem painting two coat over one priming coat using approved colour and shade and white washing of ceiling of staff quarters and internal wiring of staff quarter as per direction of EIC,construction of Septic tank sanitary works with fixtures, pipes etc. and all type of plumbing work in kitchen ,bathroom and W/C, with supply of all materials ,labours , tools and plants etc all complete as per direction of EIC

4

-

-

... More
In Danti Scheme : 4

-

-

-

... More
Providing and Installation of 415 V Diesel Generator set as per ISO 3046/BS 5514 specification all complete including transportation, loading and unloading and necessary cable for connections, earthing etc. all complete Also Construction of RCC DG Foundation with Galvanised iron roofing 0.63mm thick shed supported with RCC piller complete including all labour, material as per the detailed drawing and specification or as per the direction of the Engineer.

-

-

-

... More
In Danti Scheme

-

-

-

... More
180 KVA at Intek Well

1

-

-

... More
250 KVA at WTP

1

-

-

... More
160 KVA at CWR 1

1

-

-

... More
100 KVA at CWR 2

1

-

-

... More
Supply and Installation of LT Cable from DG set to LT Panel

-

-

-

... More
Supply of LT cable XLPE AL -1 Rx3.5Cx400 SQMM

120

-

-

... More
Supply of LT Cable XLPE AL-2 RX3.5CX240 SQMM

120

-

-

... More
Supply of LT Cable XLPE AL-1 RX3.5CX150 SQMM

60

-

-

... More
Laying one number PVC insulated & PVC sheated/ XLPE power cable of 1.1 KV grade of following size direct in ground including excavation, sand cushioning, protective covering and refilling the trench etc.

180

-

-

... More
Laying one number PVC insulated & PVC sheated/ XLPE power cable of 1.1 KV grade of following size direct in ground including excavation, sand cushioning, protective covering and refilling the trench etc.

60

-

-

... More
In Danti Scheme : 240

-

-

-

... More
Laying of one number additional PVC insulated and PVC sheated/ XLPE power cable of 1.1 KV grade of following size direct in ground including excavation, sand cushioning, protective covering and refilling the trench etc.

60

-

-

... More
In Danti Scheme : 180

-

-

-

... More
Supplying and making end termination with brass compressiongland and aluminium lugs for following size of PVC insulatedand PVC sheathed / XLPE aluminium conductor cable of 1.1 KV grade as required

4

-

-

... More
Supplying and making end termination with brass compressiongland and aluminium lugs for following size of PVC insulatedand PVC sheathed / XLPE aluminium conductor cable of 1.1 KV grade as required

4

-

-

... More
Supplying and making end termination with brass compression gland and aluminium lugs for following size of PVC insulatedand PVC sheathed /XLPE aluminium conductor cable of 1.1 KV grade as required (1 R x 3.5 C x 150 Sq. mm) from DG Set to Panel.

2

-

-

... More
Supply and burying of 40 mm dia x 4.5 mtrs long G.I. Pipe vertically for earthing having 12 mm dia holes spaced 5 mm apart drilled upto 2 mtr from the bottom complete with earthing lead of No.6 to 8 SWG GI wire in GI Pipe upto appron (from appron to DG the cost of GI wire and pipe will be extra ) upto DG, 30 cm square C.I. box with hinged cover masonary enclosure, funnel at top, alternate layers of charcoal/ coke and salt at least 150 mm thick alround etc. as per the direction of Engineer complete in all respects as per the drawing

8

-

-

... More
In Danti Scheme : 8

-

-

-

... More
Supply and Laying of Earthing strips - 50 x 6 mm G.I. All complete (26x5)

40

-

-

... More
Supply and burying of 600 x 600 x 3 mm cooper plate vertically for earthing with its top at least 3 mtrs below ground level complete with 20 mm dia G.I. Pipe and funnel for watering and one earthing lead of No. 8 to 10 SWG copper wire in 15 mm dia G.I. pipe upto DG board (from appron to DG board the cost of G.I. pipe and copper wire will be extra) 30 sq.cm C.I. frame with hinged cover masonry housing alternate layers of Charcoal/ coke and salt atleast 150 mm thick alround etc. complete in all respect

8

-

-

... More
In Danti Scheme : 8

-

-

-

... More
Subtotal of Part (A)

-

-

-

... More
O&M Part (B)

-

-

-

... More
Operation and Maintenance of whole water Supply system constructed under this work, after completion of trial run for providing continous water supply in the covered area and households @ 70 lpcd at the minimum residual pressure of 7 M.

-

-

-

... More
Danti - Fixed operation charges

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Subtotal of Part (B)

-

-

-

... More
Total (Part A + Part B) Surface Scheme

-

-

-

... More
Ground Water Scheme BOQ - Part C

-

-

-

... More
Construction of 1.2 m high and 115mm thick boundary wall with 230 mmx230 mm thick pillar made in Brick masonry in 1 cement and 4 sand mortar, the spacing between two pillar should not be more than 3.0 m c/c and the depth of foundation should not be less than 0.60m, at the site of water works as per departmental type design and drawing, and, as per specifications given in the bid document including supply of all materials, labour T&P etc.for proper completion of work as per instructions of Engineer -in -charge.

5720

-

-

... More
Supply and fixing of 3.6 m x 1.20 m MS gate including fabrication and supply of steel and construction of bounary wall pillars of size 1.35mx0.23mx0.23m with ornamental brick work 115mm th. around RCC, as per departmental type design and drawing (Drawing No. D-1) and as per specifications laid down in the bid document, including supply of all material, labour,T&P etc.required for proper completion of work as per instructions of Engineer-in-charge.

42

-

-

... More
Supply and fixing of 1.2m wide MS wicket gate including fabrication and supply of steel and construction of boundary wall pillars etc. as per specifications laid down in the bid document, including supply of all material, labour,T&P etc.required for proper completion of work as per instructions of Engineer-in-charge.

42

-

-

... More
Provide all material, labour, T&P etc. required for proper completion of work and construct of B.O.E approach road.

4737.6

-

-

... More
Earth filling work for proper leveling of water work site, in accordance with the contour map and Grid map of existing site enclosed, including leveling, dressing, excavation and filling of earth where necessary and also including all labour, materials, T&P etc.required for proper completion of works and also including carriage of earth from within a distance of about 8 km. from the site of works as per instructions of Engineer -in -charge.

21521.2

-

-

... More
Construction of Tube Well capable of providing following capacity sand free discharge, including MS Pipes, Drilling of bore, supplying, fixing & lowering of housing pipe as per IS : 4270 including M.S. sockets duly welded with M.S. electrodes to have extra strength. Tubewell Assembly containing of MSERW housing pipe, Plain/ Slotted pipe, M.S. reducer, M.S. bail plug, M.S. Clamp, well Cap, M.S. rings, Centre guide, etc of desired size. Development by Air compressor & O.P. Unit. with transportation of all materials, T&P etc required for proper completion of work including testing of water sample.

-

-

-

... More
450 LPM: Discharge at Baghra Tiwari

1

-

-

... More
600 LPM: Discharge at Baurai

1

-

-

... More
650 LPM: Discharge at Jasa Bahgaura

1

-

-

... More
750 LPM: Discharge at Unchdiha

1

-

-

... More
800 LPM: Discharge at Bhaidpur

1

-

-

... More
800 LPM: Discharge at Dhaurahara

1

-

-

... More
850 LPM: Discharge at Kalana Gaharwar

1

-

-

... More
850 LPM: Discharge at Khaira

2

-

-

... More
850 LPM: Discharge at Mahraura

1

-

-

... More
850 LPM: Discharge at Raipuri

1

-

-

... More
900 LPM: Discharge at Dangar

1

-

-

... More
900 LPM: Discharge at Kamapur Kalan

1

-

-

... More
900 LPM: Discharge at Kewtan mu.

1

-

-

... More
950 LPM: Discharge at Bhausingh

1

-

-

... More
950 LPM: Discharge at Bhilgaur

1

-

-

... More
950 LPM: Discharge at Teliyani

1

-

-

... More
1000 LPM: Discharge at Kolepur

1

-

-

... More
1000 LPM: Discharge at Manikatha

1

-

-

... More
1000 LPM: Discharge at Naroia

2

-

-

... More
1000 LPM: Discharge at Nibhi Gharwar

1

-

-

... More
1050 LPM: Discharge at Bihsara Kalan

1

-

-

... More
1050 LPM: Discharge at Rampur Hanswar

1

-

-

... More
1100 LPM: Discharge at Jopa

1

-

-

... More
1150 LPM: Discharge at Agri Sarpati

1

-

-

... More
1150 LPM: Discharge at Babura

1

-

-

... More
1150 LPM: Discharge at Bhabhani Mu. Purwa

1

-

-

... More
1150 LPM: Discharge at Karani

1

-

-

... More
1150 LPM: Discharge at Kushaha

1

-

-

... More
1150 LPM: Discharge at Rasulpur

1

-

-

... More
1150 LPM: Discharge at Sihawal

1

-

-

... More
1150 LPM: Discharge at Sikara Kalan

1

-

-

... More
1150 LPM: Discharge at Sumatiya

1

-

-

... More
1200 LPM: Discharge at Chehraha

1

-

-

... More
1200 LPM: Discharge at kashgna

1

-

-

... More
1200 LPM: Discharge at Naugaon

1

-

-

... More
1250 LPM: Discharge at Chitauli

1

-

-

... More
1250 LPM: Discharge at Godsar Pandey

1

-

-

... More
1300 LPM: Discharge at Bajata

1

-

-

... More
1300 LPM: Discharge at Bhilaura

1

-

-

... More
1350 LPM: Discharge at Basewara kalan

1

-

-

... More
1350 LPM: Discharge at Semari

1

-

-

... More
1450 LPM: Discharge at Dugaraha

1

-

-

... More
Supply and installation of submersible clear water Pump set (H.P) (As per IS 8034:1989) including switch gear (cubical panel board, starter, cable, power wiring & earthing etc) necessary tools, Automatic Voltage Servo Stabilizer, main piping & valves, pressure gauge, depth gauge with their fittings, double earthing. Supply and fixing of 2 ton capacity 4.5 m lift chain pully block, Electric resistance rubber sheet of 1x2 m size 12.5 mm thick, complete in all respect as per detailed specifications. (All supply will be done after the approval of Engineer-in-charge. Variation in head may be ± 10%.

-

-

-

... More
450 LPM: Discharge and 27 M : Head at Baghra Tiwari

1

-

-

... More
600 LPM: Discharge and 36 M : Head at Baurai

1

-

-

... More
650 LPM: Discharge and 39 M : Head at Jasa Bahgaura

1

-

-

... More
750 LPM: Discharge and 45 M : Head at Unchdiha

1

-

-

... More
800 LPM: Discharge and 48 M : Head at Bhaidpur

1

-

-

... More
800 LPM: Discharge and 48 M : Head at Dhaurahara

1

-

-

... More
850 LPM: Discharge and 51 M : Head at Kalana Gaharwar

1

-

-

... More
850 LPM: Discharge and 51 M : Head at Khaira

2

-

-

... More
850 LPM: Discharge and 51 M : Head at Mahraura

1

-

-

... More
850 LPM: Discharge and 51 M : Head at Raipuri

1

-

-

... More
900 LPM: Discharge and 54 M : Head at Dangar

1

-

-

... More
900 LPM: Discharge and 54 M : Head at Kamapur Kalan

1

-

-

... More
900 LPM: Discharge and 54 M : Head at Kewtan mu.

1

-

-

... More
950 LPM: Discharge and 57 M : Head at Bhausingh

1

-

-

... More
950 LPM: Discharge and 57 M : Head at Bhilgaur

1

-

-

... More
950 LPM: Discharge and 57 M : Head at Teliyani

1

-

-

... More
1000 LPM: Discharge and 60 M : Head at Kolepur

1

-

-

... More
1000 LPM: Discharge and 60 M : Head at Manikatha

1

-

-

... More
1000 LPM: Discharge and 60 M : Head at Naroia

2

-

-

... More
1000 LPM: Discharge and 60 M : Head at Nibhi Gharwar

1

-

-

... More
1050 LPM: Discharge and 63 M : Head at Bihsara Kalan

1

-

-

... More
1050 LPM: Discharge and 63 M : Head at Rampur Hanswar

1

-

-

... More
1100 LPM: Discharge and 66 M : Head at Jopa

1

-

-

... More
1150 LPM: Discharge and 57 M : Head at Bhabhani Mu. Purwa

1

-

-

... More
1150 LPM: Discharge and 69 M : Head at Agri Sarpati

1

-

-

... More
1150 LPM: Discharge and 69 M : Head at Babura

1

-

-

... More
1150 LPM: Discharge and 69 M : Head at Karani

1

-

-

... More
1150 LPM: Discharge and 69 M : Head at Kushaha

1

-

-

... More
1150 LPM: Discharge and 69 M : Head at Rasulpur

1

-

-

... More
1150 LPM: Discharge and 69 M : Head at Sihawal

1

-

-

... More
1150 LPM: Discharge and 69 M : Head at Sikara Kalan

1

-

-

... More
1150 LPM: Discharge and 69 M : Head at Sumatiya

1

-

-

... More
1200 LPM: Discharge and 72 M : Head at Chehraha

1

-

-

... More
1200 LPM: Discharge and 72 M : Head at kashgna

1

-

-

... More
1200 LPM: Discharge and 72 M : Head at Naugaon

1

-

-

... More
1250 LPM: Discharge and 75 M : Head at Chitauli

1

-

-

... More
1250 LPM: Discharge and 75 M : Head at Godsar Pandey

1

-

-

... More
1300 LPM: Discharge and 78 M : Head at Bajata

1

-

-

... More
1300 LPM: Discharge and 78 M : Head at Bhilaura

1

-

-

... More
1350 LPM: Discharge and 81 M : Head at Basewara kalan

1

-

-

... More
1350 LPM: Discharge and 81 M : Head at Semari

1

-

-

... More
1450 LPM: Discharge and 87 M : Head at Dugaraha

1

-

-

... More
6 point wiring of Pump house for light with 1.00 sq.mm PVC insulated multi strand copper conductor cable in rigid PVC conduit pipe on surface complete 14 S.W.G. copper earth continuously wire piano type switch and celling rose/angle/baton holder on 3mm thick phenolic laminated back light sheet etc complete in all respect including luminaries with IS amp. switch fuse unit as per instruction of Engineer-in-charge after approval of drawing.

42

-

-

... More
Internal Electrification of Pump House,chlorinating room, staff quarters and LED Lighting with Solar System in water works campus with minimum illumination 200 Lux with all accessories and fitting etc. including material and labour charges complete.

42

-

-

... More
Provide all materials, labour, T&P etc. complete and construct Pump house size (3.6x3.0x3.0m) Chlorinating room size (2.5x1.8x3.0m) as per departmental type design and drawing and as per the specifications for civil work given in the bid document, including supply of all material, labour and T&P etc complete as per instructions of Engineer -in -charge.

42

-

-

... More
Supply of Electromechanical type chlorinating plant with 0 to 4 LPH capacity pump set suitable required discharge on 10 Kg/cm2 working pressure to feed sodiumhypochloride solution complete set, inlet & outlet connection with 100 ltr. capacity solution tank suitable required discharge of pumping plant.

42

-

-

... More
Provision for inside semicircular drain 200mm dia including supply of all materials, labour and T&P etc. complete.

1427.4

-

-

... More
SINGLE ROOM STAFF QUARTER- construction of staff quarter for pump operator, chaukidar, pump attendent as per departmental type design attached with tender documents including excavation in foundation in ordinary soil/ kanker/ morrum/ soft rock/hard rock,PCC 1:4:8 with cement local sand and 40mm guage ballastFirst class brick work in 1:4 cement and sand mortar, 12 mm thick plaster in 1:6 cement and sand mortar,mild steel or iron work ,supply and filling of carted earth up to plinth level ,25mm thick 1:2:4 plain cement concrete floor and 45 cm wide apron with 2 cm guage stone ballast laid in pannels,finished with 3 mm floating coat of neat cement and 75 mm thick base concrete 1:4:8 ,supply and fiximg of 3mm thick glass strip of 25 mm width in joint ,MS angle iron chaukhat 40x40x5mm size ,40 mm thick ISI flush door shesham wood,window shutter ,HDPE Tank of 500 liter capacity ,galvanized mosquito proof heavy quality iron wire guage 1.50mm mesh over window with wood batten 50x12 mm and snowcem painting two coat over one priming coat using approved colour and shade and white washing of ceiling of staff quarters and internal wiring of staff quarter as per direction of EIC,construction of Septic tank sanitary works with fixtures,pipes etc. and all type of plumbing work in kitchen ,bathroom and W/C, with supply of all materials ,labours , tools and plants etc all complete as per direcdtion of EIC

42

-

-

... More
Construction of Over Head Tank of different capacities and staging heights as mentioned below. Supply of all materials labour T&P etc. compete and construction of R.C.C. (M30 Grade) with main components, Instruments & SCADA, wireless telemetry (voice & Data) including cost of soil testing. All the components of O.H.T. will be casted in M30 concrete with cement, coarse sand and approved stone grit as per I.S. 11682 and I.S.456.Seismic effects and wind load should be taken into consideration as I.S. 1893 for earthquake resistance and I.S. 875 part-III for wind load on structure (this area is in seismic Zone III and high damage risk zone for wind) Proper ventilator at top dome in circular shape along with an R.C.C. cover and thickness, pillar of ventilator should be minimum 50 cm height. The space between top dome and R.C.C. cover should be covered with mosquito net of standard quality alongwith expanded metaled jali, Ultrasonic type Water level indicator and EM flow meter and residual chlorine sensor/ transmitter. The indicator board scale made of 3mm thick M.S. plate should have a clear width of minimum 25cm painted with good Asian paint.It should also consists of 3mm brass wire rope minimum 4 smooth pulleys about 8 cm dia with guides,15cm dia copper ball float which shall be completely water tight suitable pointer of brass etc.Lightening conductor as per I.S.S.2309 of its latest amendments of latest electricity rules.It should consist proper elevation rod with 5 or more fork points proper down conductors of prescribed metal of proper size prescribed by ISS 2309-1969 and ISS 3013-1966C.I. manhole of min 60x60cm size made of M.S.channel section with adequate cover made of M.S. sheet of minimum 3mm thickness hinged with manhole with locking arrangement. This manhole should be fix at top dome at proper place.Supply, fixing,jointing of following size of C.I.D/F Pipes with C.I.D/F specials conforming to IS 8329/2000 as vertical pipes for inlet,outlet,overflow and washout as per latest / relevant I.S. specifications with all jointing materials for proper completion of work including other appurtenant works and excavation in all types of soil. Including Out let pipe as max size of distribution system, Inlet pipes size as rising main size, Over flow pipe as minimum rising main size & Wash out pipe 100 mm dia. Supply and Fixing of manually operated valves/sluice valves with hand wheels as per ISS 700/1969 or its latest amendments class “A” working pressure 10 Kg/cm2 Including cartage from its store to the site of work, lowering them into trenches, fixing in position and testing etc. Complete, Construction of bed blocks in 1:2:4 PCC with cement,coarse sand and approved stone grit under each duck foot bend to support the vertical pipes. These bed blocks should supported on the raft not on the soil.Construction of sluice valve chamber for above sluice valve/Butterfly valve as per departmental type design and drawing including supply of all labour T&P complete. Construction of washout / overflow chamber as per departmental type design and drawing.Painting of all concrete surface and steel pipe works with three coats of approved cement paint and anticorrosive paints.Supply & laying of 200 mm dia PVC pipe as per I.S.-4985/2000 or as latest / relevant specification including all taxes and insurance etc.F.O.R. destination for disposal of water from overflow and washout chamber to suitable point outside the water works compound including excavation of trenches. Laying of pipe line etc. required for proper completion of works as per direction of the Engineer.

-

-

-

... More
125 KL Capacity and 12 M Staging at Baghra Tiwari

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
150 KL Capacity and 14 M Staging at Baurai

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
175 KL Capacity and 16 M Staging at Jasa Bahgaura

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
200 KL Capacity and 14 M Staging at Unchdiha

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
225 KL Capacity and 14 M Staging at Bhaidpur

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
225 KL Capacity and 16 M Staging at Dhaurahara

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
225 KL Capacity and 18 M Staging at Mahraura

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
250 KL Capacity and 14 M Staging at Dangar

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
250 KL Capacity and 16 M Staging at Bhausingh

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
250 KL Capacity and 16 M Staging at Rampur Hanswar

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
250 KL Capacity and 18 M Staging at Kewtan mu.

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
250 KL Capacity and 18 M Staging at Raipuri

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
250 KL Capacity and 20 M Staging at Kamapur Kalan

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
275 KL Capacity and 16 M Staging at Bhilgaur

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
275 KL Capacity and 16 M Staging at Manikatha

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
275 KL Capacity and 16 M Staging at Nibhi Gharwar

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
275 KL Capacity and 16 M Staging at Teliyani

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
275 KL Capacity and 18 M Staging at Kolepur

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
300 KL Capacity and 16 M Staging at Bihsara Kalan

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
300 KL Capacity and 16 M Staging at Jopa

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
300 KL Capacity and 16 M Staging at Rampur Hanswar

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
300 KL Capacity and 18 M Staging at Agri Sarpati

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
325 KL Capacity and 16 M Staging at Babura

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
325 KL Capacity and 16 M Staging at Bhabhani Mu. Purwa

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
325 KL Capacity and 16 M Staging at Chehraha

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
325 KL Capacity and 16 M Staging at kashgna

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
325 KL Capacity and 16 M Staging at Rasulpur

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
325 KL Capacity and 16 M Staging at Sikara Kalan

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
325 KL Capacity and 16 M Staging at Sumatiya

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
325 KL Capacity and 18 M Staging at Karani

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
325 KL Capacity and 18 M Staging at Kushaha

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
325 KL Capacity and 18 M Staging at Naugaon

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
325 KL Capacity and 18 M Staging at Sihawal

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
350 KL Capacity and 16 M Staging at Bajata

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
350 KL Capacity and 16 M Staging at Chitauli

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
350 KL Capacity and 16 M Staging at Godsar Pandey

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
350 KL Capacity and 18 M Staging at Bhilaura

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
400 KL Capacity and 16 M Staging at Basewara kalan

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
400 KL Capacity and 16 M Staging at Dugaraha

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
400 KL Capacity and 18 M Staging at Semari

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
500 KL Capacity and 16 M Staging at Khaira

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
550 KL Capacity and 18 M Staging at Naroia

1

-

-

... More
Extra for cost variation due to soil bearing capacity from assumed bearing capacity of 12MT/Sqm( for 1MT/sqm or part thereof).

1

-

-

... More
Excavation of earth in ordinary soil (loam, clay or sand) for pipe line and rising main trenches including lift upto 1.50 m and lead upto 50 m and refilling watering, ramming of the excavated earth into the trench and also disposal of surplus earth upto 50m from the center of the trenches including supply of all material labour, T&P etc complete as per instructions of Engineer -in -charge.

-

-

-

... More
Ordinary Soil

374493

-

-

... More
Mixed with Kankar

124132

-

-

... More
Supply of following sizes (D.I. K-9/K-7 pipes for rising main & Distribution Sysytem conforming to latest/relevant I.S. 8329/2000 Specifications with all jointing materials conforming to latest /relevant I.S. specifications or their latest amendment including F.O.R. destination and all taxes and insurance etc. with loading, unloading and Carting up to site of work, also including specials for these pipes and lowering them into the trenches and laying true to alignment and gradient and jointing etc. complete (including hydrotesting of pipe lines and cutting of pipes for making up the length but excluding the cost of trenches).all complete as per instructions of Engineer -in -charge.

-

-

-

... More
Rising Main

-

-

-

... More
250 mm Dia. DI K-7

5690

-

-

... More
200 mm Dia. DI K-7

1031.4

-

-

... More
150 mm Dia. DI K-7

361

-

-

... More
125 mm Dia. DI K-7

40

-

-

... More
Distribution

-

-

-

... More
Providing supplying, jointing,in standard lengths Polyethelene Pipes, confirming to IS 4984 / 14151 / 12786 / 13488 with nesessary jointing material like mechanical connector i. e. thread / insert joint / quick release coupler joint/ compression fitting joint or flanged joint excluding coupler/specials, including transportation and freight charges, 3rd party inspection charges, loading/ unloading charges, conveyance to the site & stacking the same in closed shade duly protecting from sunrays & rains, excluding GST levied by GOI in all respect including Hydrotesting and commissioning etc. complete. PE-100

-

-

-

422672

-

-

40746

-

-

28153

-

-

... More
110 mm

39656

-

-

... More
140 mm

51935

-

-

... More
160 mm

39684

-

-

... More
200 mm

36629

-

-

... More
Providing, supplying, lowering Laying and jointing double flange sluice valve confirming for IS 14846 including worn gear arrangement as per test pressure, stainless steel spindle, caps,including inspection charges, transportation upto store, unloading and stacking in all respect etc. complete

-

-

-

... More
50 mm dia. Sluice Valve

238

-

-

... More
65 mm dia. Sluice Valve

72

-

-

... More
80 mm dia. Sluice Valve

89

-

-

... More
100 mm dia. Sluice Valve

4

-

-

... More
125 mm dia. Sluice Valve

163

-

-

... More
200 mm dia. Sluice Valve

68

-

-

... More
250 mm dia. Sluice Valve

14

-

-

... More
50 mm. dia. Scour Valve

43

-

-

... More
Providing, supplying 20 mm dia screwed down type air valve with gun metal seat conforming to latest/relevent I.S. specifications including all taxes and insurance, carting up to site of work and lowering them into the trenches, fixing in position and jointing them with pipelines and testing etc. complete (including supply of jointing materials etc complete) as per instructions of Engineer -in -charge.

43

-

-

... More
Supply of under ground sluice value type fire hydrant consisting of 80 mm dia sluice valve, 80mm dia tail pieces, 80mm dia duck foot bend and 80 mm dia standard makes iron coupling with cap and etc. complete conforming to latest/relevent I.S.specifications including all taxes and insurance up to site of work and lowering them into the trenches, fixing in position and jointing them with pipelines and testing etc. complete (including supply of jointing materials etc. complete as per instructions of Engineer -in -charge.

42

-

-

... More
Supply and fixing of the suitable size of Digital Bulk Water Meter Enclosed Type Metallic gears (IS: 2373/1981) for measurement of bulk flow at different Locations (at the entry of gram panchayat) F.O.R. destination including all taxes and 5 year insurance etc. complete as per instructions of Engineer -in -charge.

42

-

-

... More
Supply of all materials, labour, T&P. required and construct masonary type Bulk Water meter / Butterfly valves chamber including supply of M.S. Manhole cover as per departmental type design and drawing (Drawing no.D-4) including all material labour, T& P etc. complete as per instructions of Engineer -in -charge.

42

-

-

... More
Construction of following type chambers as per department type design and drawing including Heavy duty M.S. Manhole Cover and all materials, labour, T&P etc complete for proper completion of work as per instructions of Engineer -in -charge.

-

-

-

... More
Sluice/Scour valve chamber (RCC surface box Type)

691

-

-

... More
Fire Hydrant chamber

42

-

-

... More
Air Valve Chamber

43

-

-

... More
Provision of Bye pass Chamber including of material, valves, pipes and constrcution and complete in all resspect

42

-

-

... More
Design and construct Thrust Block made in R.C.C. with cement, coarse sand & 20 mm gauge stone ballast in proportion of 1:1.5:3, for pipe line, including supply of MS reinforcement wrought to required shape as necessary ,its bending, fixing & binding the same with 0.50 mm thick binding wire in position & necessary centering & shuttering including curing and supply of all materials, labour, T & P etc. required for proper completion of the work and as per specifications for RCC work as per instructions of Engineer -in -charge.

-

-

-

... More
200 mm Dia. DI K-7

64

-

-

... More
150 mm Dia. DI K-7

27

-

-

... More
125 mm Dia. DI K-7

4

-

-

... More
Dismantling and Reinstatement of Following type of surfaces including sorting out and stacking of serviceable materials and disposal of unserviceable materials upto a distance of 50m as per instructions of Engineer -in -charge.

-

-

-

... More
B.O.E. surface

24188

-

-

... More
Bituminous surface

56936.88

-

-

... More
C.C. Road

16519

-

-

... More
Interlockin Road

3056

-

-

... More
Provision for following types of crossing as per departmental type design and drawing including encasing pipe of required diameter, shifting of telephone cables, etc. along the alignment of pipe etc. complete as per instructions of Engineer -in -charge.

-

-

-

... More
Canal Crossing

134

-

-

... More
Crossing Of Road (FOR 3.5 M WIDE)

331

-

-

... More
Making house connection from distribution line upto atleast 2 m inside the Boundary wall of house with Tap, with supply of 1 m G.I. pipe & average 10.0 mtr. MDP Pipe including specials, Brass ferrule, Saddle clamp etc. of suitable size, T&P etc. including excavation, laying and jointing for proper completion of work as per instructions of Engineer

34792

-

-

... More
Construction of single tap pillar type stand post as per type design as per instructions of Engineer -in -charge.

453

-

-

... More
Sub total - PART C

-

-

-

... More
PART D - O&M PHASE

-

-

-

... More
Operation and Maintenance of whole water Supply system constructed under this work, after completion of trial run for providing water supply in the covered area and households @ 70 lpcd at the minimum residual pressure of 7 M.

-

-

-

... More
Fixed operation charges for Agri Sarpati

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for Baghra Tiwari

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for Bajata

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for Baurai

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for Bhausingh

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for Bihsara Kalan

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for Chehraha

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for Chitauli

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for Dhaurahara

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for Godsar Pandey

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for Basewara kalan

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for Dangar

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for Khaira

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for Kolepur

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for Bhilaura

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for Bhilgaur

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for Dugaraha

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for Karani

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for Rampur Hanswar

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for Babura

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for Bhaidpur

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for Jopa

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for Unchdiha

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for Bhabhani Mu. Purwa

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for Naugaon

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for Nibhi Gharwar

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for Raipuri

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for Manikatha

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for kashgna

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for Jasa Bahgaura

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for Kalana Gaharwar

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for Kamapur Kalan

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for Kewtan mu.

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for Kushaha

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for Mahraura

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for Naroia

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for Rasulpur

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for Semari

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for Sihawal

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for Sikara Kalan

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for Sumatiya

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Fixed operation charges for Teliyani

-

-

-

... More
Year-1 (During defect liabilities period)

1

-

-

... More
Year-2

1

-

-

... More
Year-3

1

-

-

... More
Year-4

1

-

-

... More
Year-5

1

-

-

... More
Year-6

1

-

-

... More
Year-7

1

-

-

... More
Year-8

1

-

-

... More
Year-9

1

-

-

... More
Year-10

1

-

-

... More
Sub total

-

-

-

... More
Total - PART D

-

-

-

... More
TOTAL AMOUNT (PART C + PART D)

-

-

-

... More
TOTAL AMOUNT (PART A+ PART B + PART C + PART D)

-

-

-

... More
1. The contractor shall quote the rates inclisive of all taxes (excluding GST).

-

-

-

... More
2. GST applicable amount will be paid extra based on submission of original challans receipts from the concerned authorities.

-

-

-

... More
3. Standard Drawigs are avialable with the employer and bidders are allowed to review the same at SWSM office.

-

-

-

... More
4. For Intake Well Per meter rate will be arrived based on quoted rate by total height of Intake . So, for Variation of increase/ decrease in height of Intake will be paid/ recovered on arrived per meter rate.

-

-

-

... More
5. For WTP Per MLD rate will be arrived based on quoted rate by total capacity. So, for Variation of increase/ decrease in capacity in terms of MLD of WTP will be paid/ recovered on arrived per MLD rate.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.