Rural Engineering Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Rural Engineering Department Tender

Works
Civil And Construction
Eprocure
Opening Date28 Sep 2024
Closing Date12 Oct 2024
Tender Amount₹ 10,48,000 
Notes
Download

Costs

Summary

Ward-19 Radha Viahr Gopal Nagar Mai Devi Sharma Ke Makan Se Sanjiv Kumar Ke Makan Tak Cc Road And Drain Work

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 12:6:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. As Per S.I. No. 273

9.05

27014

2985

... More
M-150 Brick Work in 1:4 (one cement & Four corse Sand) mortar in foundation and plinth including supply of all materials labour, Tools & plants etc. required for proper completion of the work As Per S.I. No.- 305(a)

20.61

96660

4690

... More
12 mm thick plaster with cement and Coarse sand in 1:4 over brick work minimum thickness not to be less than 1cm. including supply of all materials, labour, tools & plants etc. required for proper completion of the work. As Per S.I. No.- 584 a

100

16500

165

... More
Cement Concrete with 2 cm gauge approved stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. As Per S.I. No.-279 (a)

4.23

24322

5750

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401 As Per S.E. (R.E.D.), Saharanpur Sanction

49.5

99742

2015

... More
Cement concrete with 2cm gauge approved stone grit, coarse sand & cement in proportion of 1:1.5:3 in cc pavement (theckness as per design) cement coarse & fine aggregate confirming to IS standard mixed in concrete mixture /Plant of not less then 0.2 cum capacity & appropriate weight batcher using approved mix design, laid in approved fixed form work (steel) channel) laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the form work spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including hassion cloth for curring of concrete pavements for not less then 14 days curring compound (where as specified) and water finishing to lines & grade including supply of all material, labour, tools & plants etc. required for proper completion of work and also including complete shifting of Recron 38 fibre reinforcement material etcl & concrete etc. As Per N.I. No.-9 Ch.-20

74.25

542025

7300

... More
R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 for slabs excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra. As Per S.I. No.-284 (a)

0.47

3478

7400

... More
M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authorised overlapping shall be measured and including cost of binding wire. As per Analysis of Rate.

0.46

3823

8312

... More
Supply and fixing of a sign board including necessary supply of all materials, labour, Tools & plants etc. required for proper completion of the work .As Per S.E. (R.E.D.), Saharanpur Sanction

1

4300

4300



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.