Rural Engineering Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Rural Engineering Department Tender

Works
Eprocure
Opening Date24 Apr 2018
Closing Date29 Apr 2018
Tender Amount₹ 9,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Removing and uprooting behaya & hathigrass etc in drain including its proper disposal away from site

5220

-

-

... More
Earth work in foundation I/c back filling for profile & level pillar

25.21

-

-

... More
P.C.C 1:2:4 with cement, coarse sand and stone grit 11.2-20mm in level pillar & profile.

24.57

-

-

... More
P.C.C 1:3:6 with cement, coarse sand and stone grit 11.2-20mm in level pillar

1.15

-

-

... More
Centering Shuttering in foundation work as per directon of engineer in charge .

6.84

-

-

... More
Painting of Level Pillar

8.55

-

-

... More
Printing letter including materails.

380

-

-

... More
Proving beldar for chainaging of drain for level pillar

10

-

-

... More
Pucca Work

-

-

-

... More
Earth work in making bundha U/S and D/S of site and removing after work complition irrigation sor chap v/2f

51.7

-

-

... More
Earth work in making road diaversion & Dismentling diaversion after complition of work irrigation sor chap v/2f

960.3

-

-

... More
Supplying and Fixing Sign board including letter writing

4

-

-

... More
Earth work in excavations of foundation in all type of soil leads lefts and back filling as per directon of engineer in charge .

256.53

-

-

... More
Plain Cement Concrete 1:3:6 in Cement Coarse Sand and Stone ballast-20-40 mm gouge mixing and laying in foundation. As per directon of engineer in charge .

52.61

-

-

... More
Ist class brick work in 1:4 cement sand of 1.25 FM Mortar For Abutment as per directon of engineer in charge .

218.74

-

-

... More
M.s work in reinforcement including cutting,bending &placing in position including binding wire as per directon of engineer in charge .

23.79

-

-

... More
Reinforcement concrete1:1.5:3 in cement coarse sand and stone grit 12-20 mm. Gauge. Mixing and laying as per directon of engineer in charge .

35.65

-

-

... More
Plain Cement concrete 1:1:2 in cement coarse Sand and Stone grit mixing as per directon of engineer in charge .

3.84

-

-

... More
Centering Shuttering for super structure work as per directon of engineer in charge .

97.2

-

-

... More
Cement Pointing Struck deep in 1:2 cement sand mortor as per directon of engineer in charge .

204.76

-

-

... More
S/F of wheel guards as per directon of engineer in charge .

8

-

-

... More
Filling expansion Joint with mixer of bitumen 85/50 and wooden saw dust

10.62

-

-

... More
S/F of P.V.C.pipet 63mm dia as per directon of engineer in charge .

66.84

-

-

... More
Brick soling on edge on road ramp as per directon of engineer in charge .

225

-

-

... More
Painting and writing data on parapet as per directon of engineer in charge .

2

-

-

... More
Dewatring of foundation by 5H.P. Pump set as per directon of engineer in charge .

200

-

-

... More
S/P of Stone grite on P.V.C.pipe as per directon of engineer in charge .

0.62

-

-

... More
Material testing of variuos item of work

2

-

-

... More
Cement plaster in 1:4 cement and coarse sand on parapet

0.7

-

-

... More
Earthwork in making ramp with dressing and raming

180

-

-

... More
S/F of Tarfelt on bed block

4.06

-

-

... More
Dismentaling of old structure

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.