Rural Engineering Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Rural Engineering Department Tender
Civil And Construction
Road Construction
Eprocure
Opening Date28 Dec 2024
Closing Date4 Jan 2025
Tender Amount₹ 16,08,000
Costs
EMD
₹ 33,000Document Cost
₹ 1,104Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_REDUP_987481_1Bid Award Id
ViewTender No
1014dt04.12.2024Tender Authority
Rural Engineering Department ViewPurchaser Address
-Website
http://http://upred.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Excavation in foundation in ordinary soil (Loam clay, or sand ) including lift upto 1.5 m & lift up to 30.0 Mtr & including filling,watering and ramming ofexcavated earth in to the trenches or in to the space between the building and the sides of foundataion trenches or in to the plinth and removal & disposal of surplus earth as directed by the Engineer- In-Charge up to a distance of 30.0 Mtr from the foundation trenches as per SI. N0. 251.
34
115
3910
... More
Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement in proportion of 12:6:1 in foundation and under floors, including supply of all materials, labour and T&P etc. required for proper completion of the work.as per SI. N0. 273
42.57
3250
138352.5
... More
First class brick work in 1:4 cement and coarse sand above 2.25 F.M. mortar in foundation and plinth including supply of all materials,labour and t&p etc required for proper completion of the work. as per SI. N0. 305(B).
84.26
4980
419614.8
... More
Providing and Laying 125 micron thin polythene to act as separation layer
529
33
17668.6
... More
Construction of Un Reinforced ,dowel jointed at expansion and constuction joint only , Plain Cement Concrete pavement , thickness as per design , over a prepared sub base , with 43 grade cement or any other type as per Clause 1501.2.2 (M-30 Grade) , coarse and fine aggregrates conforming to IS :383 , maximum size of coarse aggregrate not to exceed 25mm,mixed in a concrete mixer not less than 0.20cum capacity and appropriate wieght batcher using approved mix design ,laid in approved fixed side form work (steel channel , laying and fixing of 125 micron thick polythene film , wedges, steel plates including levelling the form work as per drawing ), spreading the concrete with shovels, rakes , compacted using needle,screed and plate vibrators and finishing in continous operation joints, applying debonding stripes, primer ,sealant dowel bars near approaches to bridge/culvert and construction joints , admixtures as approved curing of concrete slabs for 14 days curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification MORD 1501 (excluding supply polythene and making of contraction Joint ) as per rate sanctioned by S.E. R.E.D Azamgarh
79.35
7220
572907
... More
12 mm thick plaster over brick work with cement mortar consisting of one part cement & four parts of fine sand of 1.25 F.M. including supply of all material,labour and T&P etc required for proper completion of the work as per SI NO 584
295
160
47200
... More
Mild steel or iron work in plain work such as R.C.C. including cutting, bending and placing in position and also including its wastage etc for proper completion of work as per SI No 504
13.78
5650
77857
... More
Making contraction / construction joint with filling bitumin 40% , asbestas 5% and coarse sand including all for proper completion of the work
170
37
6375
... More
Supply and fixing of 450mm hume pipe
10
1605
16050
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements