Rural Engineering Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Rural Engineering Department Tender
Civil And Construction
Road Construction
Eprocure
Opening Date30 May 2023
Closing Date15 Jun 2023
Tender Amount₹ 78,16,000
Costs
EMD
₹ 1,57,000Document Cost
₹ 2,354Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_REDUP_807524_1Bid Award Id
ViewTender No
243/RED/TENDER-BLY/2023-24 Date 22-05-2023Tender Authority
Rural Engineering Department ViewPurchaser Address
-Website
http://http://upred.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Concrete with 4 cm. gauge brick ballast, fine sand of 1.25 FM and cement in proportion of 12 :6 : 1 in foundation and under floor, Including supply of all Material, Labour and T & P etc. required for proper completion the work.As per S.I. No. 273.
66.83
235575
3525
... More
Providing and laying spreading Material (Mix in place) on a prepare grading mixing in place with rotavator and compacting with the road roller at OMC achieve the desire unconfied compressive strength and to form a material,complete as per Technical Specification Clause 401 (A).
335.2
1070327
3193.1
... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 Kn in stages to proper grade and camber applying and brooming stone screening / binding material to fill up the interstics of coarse aggregate, watering and compacting to the required dencity . Grading - III ( with 22.40-53 mm size stone ballast) As per technical specification clause 405.
251.4
1030855
4100.46
... More
Cement Concrete with 20 mm. gauge approved stone grit ; approved Coarse Sand and Cement in the proportion of 3:1.5:1 inculding supply of all Material, Labour and T & P etc. required for proper completion the work. As per S.I. No. 279(ii)
522.85
4101758
7845
... More
First class Brick work in 1:4 cement and coarse Sand of 2.25 FM mortar in foundation & Plinth inculding supply of all materials Labour T & P etc.required for proper completion of work. As per S.I. No. 305
184.5
970470
5260
... More
12 m.m. thick Plaster with Cement mortarover brick work minimum thickness not to be less then 3/8" (10mm) thick consisting of one part of cement and 4 part of coarse sandof 2.25 FM ( 1:4 )on brick work including supply of all material, labour, T&P etc.S.I No 584(1)
990
201960
204
... More
R.C.C. work with Cement, approved coarse sand and 2cm gauge approved stone ballast in proportion of 1:2:4in P/L beam SI.No. 283.
1.62
12927
7980
... More
Mild steel or iron work in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks. S.I.No. 504
1.27
11264
8870
... More
S/L of 125 micron thick polythene sheet For se paration layer complet with all cost of all materials ,labour and T&P etc.(Sanctioned by S.E Bareilly)
1530
30600
20
... More
Making contraction joint in cement concerete road with 0.80 kg. Maxphalt, 0.01 kg. Cement,0.0025 cum. Coarse sand complet as per direction of E/I .(Sanctioned by S.E Bareilly)
990
38115
38.5
... More
Supply & fixing of information road Sign Board of Size (1.20X0.90) M. Size made of 18mm. Gauge m.s sheet with two nos.angle iron post 40x40x5mm&3.20mtrs. long&25x5mm M.S. flat bracing compl.with cost of painting over two primer caot in base and letter writingon board in comp. work
1
6000
6000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements