Rural Development Department Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Rural Development Department - RDD Tender
Civil And Construction
Building Construction
Eprocure
Opening Date26 Mar 2025
Closing Date2 Apr 2025
Tender Amount₹ 5,45,000
Costs
EMD
₹ 10,900Document Cost
₹ 677Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_RDUP_1022357_13Bid Award Id
ViewTender No
1774 date 03-03-2025Tender Authority
Rural Development Department ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Concrete with 40 mm gauge brick ballast , Coarse sand of 1.25 FM & cement in proportion 12:6:1 as SI No.273
6.68
4060
27120.8
... More
E/w in filling in ordinary soil As per S.I. No. 253 i/c cartage of 1Km
23.36
196
4592.58
... More
M – 150 brick work in ( 1 : 4 ) cement & c/sand as per SI N o. 305
3.55
5450
19347.5
... More
P/L of 125 micron thick polythene over base concrete i/c all complete
66.75
45
3003.75
... More
Laying of C.C. road slab 10 cm thick in ( 1 : 1.5 : 3 ) cement , c/ sand & 20 mm gauge stone grite as per SI.No. 773b
11.03
7350
81070.5
... More
M– 150 brick work in ( 1 : 4 ) cement & c/sand as per SI N o. 305+309+310
2.59
6060
15695.4
... More
12 mm thick plaster in 1:4 cement & c/sand mortar as per SI No 584
72.15
165
11904.75
... More
Making construction joints filling with bituminious board
24.5
37
917.28
... More
R.C.C. work with cement , C-sand & 2cm gauge stone ballast 1:2:4 as per SI.NO.-284
0.54
8750
4725
... More
Mild steel in R.C.C work cutting & binding including all complete of work as per SI.NO.-504
0.42
7625
3202.5
... More
Marble work gang saw cut (polished and machine cut) of thickness 18 mm for wall lining (veneer work), backing filled with a grout of average 12 mm thick in cement mortar 1:3 (1 cement : 3 coarse sand), including pointing with white cement mortar 1:2 (1 white cement : 2 marble dust) with an admixture of pigment to match the marble shade (To be secured to the backing by means of cramps, which shall be paid for separately).Area of slab over 0.50 sqm DSR Code 8.1.1.2
50.18
4323
216958.25
... More
Finishing wall with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: New work (Two or more coats applied @ 1.43 ltr/10sqm over and including priming coat of exterior primer applied @ 2.20 kg/10sqm) 13.47.1
28.2
124
3513.72
... More
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works as per DSR Code -10.25.2
325
125
40852.5
... More
Supply with Writing, fitting & fixing of granite stone for signboard (Smriti Board) i/c its all work to its proper compeletion of the work with all T*P
1
20000
20000
... More
S/F of sign Board
1
4800
4800
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements