Rajya Krishi Utpadan Mandi Parishad Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Rajya Krishi Utpadan Mandi Parishad - RKUMP Tender
Civil And Construction
Road Construction
Eprocure
Opening Date17 Apr 2025
Closing Date10 May 2025
Tender Amount₹ 45,45,000
Costs
EMD
₹ 4,30,000Document Cost
₹ 7,242Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_RKUMP_1028526_1Tender No
732/DDC Dt-15.04.2025Tender Authority
Rajya Krishi Utpadan Mandi Parishad ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Constrction of Unreinforced, without Dowel, jointed, at expansion and construction joints only, plain cement concrete pavement, thicknes as design over a prepared sub base with 43 grade cement or any other type as per clause 1501.02.02 (1.5:3) Coarse sand and fine aggregate confirming to ISI 383 maximim size of coarse aggregate not exceeding 25 mm , mixed in a concrete mixer of not less than 0.20 Cum capacity and appropriate weight batcher useing approved design , laid in approved fix site form work (Steel Channel, laying of fixing of 125 micron thick polythene film . Wedges, steel plates including leveling the form work as per drawing, as spreading the concrete with shovels, raks, compacted using needle, screed and plate vibrator and finished in continuous opretion including provision of contraction and expasion, comstruction joints as peer norms, appling debonding strips primer selant, near approches to bridges/culvert and construction joints, admixtures as approved , curring of concrete slabs for 14 days, curring compound and water finishing to lines and grade as per drawing and tecnhical specification clause 1501 including cost of polythene sheet. Chapter 20 New Item 9(1)
630
6800
4284000
... More
Providing and fixing rectro reflective sign board as per drawing approved by H/QAS PWD 22.42
1
15000
15000
... More
PART-B The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years.( Including cost of material T&P labour but excluding GST) for 1st year maintenance cost@0.0%
1
-
-
... More
The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years.( Including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 0.25%
1
11085
11085
... More
The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years.( Including cost of material T&P labour but excluding GST) for 3nd year maintenance cost @ 0.50%
1
22170
22170
... More
The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years.( Including cost of material T&P labour but excluding GST) for 4nd year maintenance cost @ 0.75%
1
33255
33255
... More
The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years.( Including cost of material T&P labour but excluding GST) for 5nd year maintenance cost @ 1.00%
1
44340
44340
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements