Rajya Krishi Utpadan Mandi Parishad Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Rajya Krishi Utpadan Mandi Parishad - RKUMP Tender
Civil And Construction
Road Construction
Eprocure
Opening Date5 Apr 2025
Closing Soon25 Apr 2025
Tender Amount₹ 28,00,000
Costs
EMD
₹ 2,80,000Document Cost
₹ 5,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_RKUMP_1024769_1Tender No
01/2025Tender Authority
Rajya Krishi Utpadan Mandi Parishad ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing, laying, spreading and compacting stone aggregates of specific sizes (22.4-53 mm) obtained from approved query sukrut to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming type 'B' screening materials to fill up the interstices of coarse aggregate, watering and compacting to the required denstity. as per Technical specification clause.4.7/405(3) As per Analysis
138.85
2316
321613.62
... More
Providing and applying primer coat with bitumin emulsion (SS) on prepared surface of granular Base including clearing of road surface and and sprying primer at rate of 0.75 Kg/sqm ssing machenical means (MORD 502) As per Analysis
1851.3
44
81642.33
... More
Providing and applying tack coat with bitumin VG-10 using pressure disributor at rate of 0.35 kg per sqm on the prepared bituminous/granular surface cleaned with mechnical broom (MORD 503) As per Analysis
1851.3
15
28880.28
... More
Cleaning the existing W.B.M. surface and laying 2cm. Thick Premix carpet with appd. Grit (in ratio 1:2 with 10-16 mm & 16-22.4mm gauge with dalla Grit) and bitumen including neating the paint to required tamperature and mixing either in mixer or by hand including cartage of materials, maintenance of side, patries and watering them during operation including supply of all materials L.T.&P. required for proper completion of the work also including cost of maxphalt and back coat.As per Analysis
1851.3
167
310092.75
... More
Cleaning the premix carpet surface and laying seal coat with 6 mm Grit, including supply of all materials, Labour, T&P etc. required for proper completion of work.As per Analysis
1851.3
54
99970.2
... More
Brick adging on both side of rode m 150 8 cm wide 12 cm deep laid with mud mortar including all materail as per
0.61
82000
49610
... More
Supply and laying 350mm dia hume pipe
22.5
1600
36000
... More
Laying C.C. Road Slab consisting of 1:2:4 cement, coarse sand & approved 20mm gauge stone ballast, over prepared sub grade after its rectifications & bringing it to proper camber and including supply of all materials, labour T&P etc.
101.21
8300
840001.5
... More
Excavation in foundation in black cotton soil including lift upto 1.5 m & lead upto 30 m including filling water ring ramming & Dressing of exvaled earth with trenches or into the spare between walls of foundation and removal of surplus earth as directed by E/I A.
47.78
110
5255.25
... More
Ist class brick in 4:1 fine sand and cement of 1.25 fineness modulus mortar in foundation & plinth including supply of all material labour and tools and plants etc. required for proper completion of work.
31.4
5190
162940.05
... More
Supply and laying of 125 micron polythene sheet under the foundation (for anti salt peter treatment) or over sub-base to act as separation between sub-base and conc. Slab (for C.C. raod slab), inculding including supply of all materials, L T&P etc. required for proper completion of the work.
674.7
56
37783.2
... More
Concrete with 4cm guage brick ballast sand of 1.25 F.M. and cement in proportion 5:4:1: in foundation and under floors including supply of all materials labour and tools and pants etc. required for pepar completion for the work (S.I. No. 275)
13.65
4490
61288.5
... More
Supply and Fixing one no. sign board as per approved desgine by HQ all complete etc. required for proper compeletion of the work.
(AS PER APPROVED RATE HQ)
1
8000
8000
... More
Payment Maintenance of P.C. Work The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 1st Year Maintenance Cost On Amount Rs. 1521411.34 @ 0.0 %
1
-
-
... More
The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 2nd Year Maintenance Cost On Amount Rs. 1521411.34 @ 1.00 %
1
15214
15214.11
... More
The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for Year Maintenance Cost On Amount Rs. 1521411.34 @ 1.50 %
1
22821
22821.17
... More
The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 4th Year Maintenance Cost On Amount Rs. 1521411.34 @ 2.00 %
1
30428
30428.23
... More
The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 5th Year Maintenance Cost On Amount Rs. 1521411.34 @ 3.00 %
1
45642
45642.34
... More
Payment Maintenance of C.C. Work The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 1st Year Maintenance Cost On Amount Rs. 1107268.50 @ 0.00 %
1
-
-
... More
The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 2nd Year Maintenance Cost On Amount Rs. 1107268.50 @ 0.34 %
1
3764
3764.71
... More
The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 3rd Year Maintenance Cost On Amount Rs. 1107268.50 @ 0.50%
1
5536
5536.34
... More
The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 4th Year Maintenance Cost On Amount Rs. 1107268.50 @ 0.66 %
1
7307
7307.97
... More
The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 5th Year Maintenance Cost On Amount Rs. 1107268.50 @ 1%
1
11072
11072.69
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%