Rajya Krishi Utpadan Mandi Parishad Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Rajya Krishi Utpadan Mandi Parishad - RKUMP Tender
Civil And Construction
Road Construction
Eprocure
Opening Date2 Apr 2025
Closing Date16 Apr 2025
Tender Amount₹ 26,33,418.08 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 2,65,000Document Cost
₹ 4,720Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_RKUMP_1024101_1Bid Award Id
ViewTender No
N.K./Lko/E-Nivida/2025-08 Dated 01.04.2025Tender Authority
Rajya Krishi Utpadan Mandi Parishad ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing, laying and rolling of open graded mix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or imulsion to required line, grade and level to serve as wearing course on apreviously prepared base , including mixing in a suitable plant, laying and rolling with a three wheeled 80-100 KN static roller capacity, finished to required level and grades to be followed by seal coat of type C as per Technical specification clause 508 (By Hot Mix Method)
3000
176
530100
... More
Providing, and laying sealing the voids in a bituminous surface laid to the specified levels grade and cross fall using type C as per Technical specification clause 510
3000
65
197400
... More
Brick edging on both sides of the road with M-150 bricks 8 cm wide and 11.5 cm deep laid with mud mortar including cost of bricks all labour finished to be required template and in proper alignment T&P and also including dressing and ramming the excavated earth as per direction of Engineer in Charge. (SINo. 765)
0.1
88000
8800
... More
Supply & laying of 350mm dia N.P.-3 class Hume pipes in position and proper alignment including supply of all materias, labour and T&P etc. required for proper completion of work.(N.S)
15
1600
24000
... More
Providing and fixing of Recto reflective steel sign board as per drawing design including writing of details as specified by Engineer in charge. including supply of all materials, labour T&P, cartage upto site complete in all respect required for proper completion of the work and as per direction of E/I.(SOR Banda 2020-21)
1
8000
8000
... More
Maintenance cost of 1st year @ 0% cost of work on Item No. 1 to 8
1
-
-
... More
Maintenance cost of 2ndyear @2 % cost of work on Item No. 1 to 8
1
18728
18728.89
... More
Maintenance cost of 3rd year @3 % cost of work on Item No. 1 to 8
1
28093
28093.33
... More
Maintenance cost of 4th year @4 % cost of work on Item No. 1 to 8
1
37457
37457.78
... More
Maintenance cost of 5th year @6 % cost of work on Item No. 1 to 8
1
56186
56186.66
... More
Providing , laying ,spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-0100 kN static roller in stages to proper grade and camber, applying and brooming , crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405
77.81
4559
354774.7
... More
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m as directed by the E/I . All Kinds of soil..(SI )
68.75
135
9281.25
... More
First class brick work in 1:4 cement and coase sand mortar in foundation and plinth including suplly of all material, labour and T&P etc, required for proper completion.
55.78
5240
292287.2
... More
12mm thick plaster 1:4 cement and coarse sand mortar over brick workincluding supply of all materials, labour and T&P etc. required for proper completion of work. (SI 584 (i))
212.5
180
38250
... More
Laying C.C. on edging toewall consisting of 1:2:4 cement, coarse sand and approved 2 cm (1.5) guage stone ballast.
12.38
7185
88950.3
... More
providing and laying interlocking tiles 80 mm thick of approved quality finished to required template and in proper alingment as directed by the Engineer in charge
750
980
735000
... More
Maintenance cost of 1st year @ 0% cost of work on Item No. 14 to 19
1
-
-
... More
Maintenance cost of 2ndyear @0.25% cost of work on Item No. 14 to 19
1
3796
3796.36
... More
Maintenance cost of 3rd year @0.50% cost of work on Item No. 14 to 19
1
7592
7592.72
... More
Maintenance cost of 4th year @0.75% cost of work on Item No. 14 to 19
1
11389
11389.08
... More
Maintenance cost of 5th year @1.00% cost of work on Item No. 14 to 19
1
15185
15185.43
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements