Rajya Krishi Utpadan Mandi Parishad Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Rajya Krishi Utpadan Mandi Parishad - RKUMP Tender
Civil And Construction
Road Construction
Eprocure
Opening Date3 Jan 2025
Closing Date22 Jan 2025
Tender Amount₹ 1,00,55,000
Costs
EMD
₹ 7,03,000Document Cost
₹ 17,850Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RKUMP_988188_1Tender No
tendershamli2024Tender Authority
Rajya Krishi Utpadan Mandi Parishad ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
WBM Grading-3
Providing, laying, spreading and compacting 22.4-53 mm stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness , hand packing rolling with three wheel 80-100 kn static roller in crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required densityGrading 3 as per technical specification clause 405.(3)
765
3355
2566651.5
... More
Providing & applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502
10200
33
344760
... More
Providing & applying Tack coat with bitumen VG-10 grade using emulsion pressure distributor at the rate of 0.30 kg per sqm on the prepared granular surface treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503
10200
15
153000
... More
Providing laying and rolling of open-graded premix carpet of 20 mm thikness composed of 13.2 mm to 5.6 mm aggregates either usingpenetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either type C as per (Primixing work Machanical Means) Technical Specification clause 508
10200
157
1602420
... More
Providing & laying seal coat by manual means with VG-10 grade bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification clause 510
10200
61
624240
... More
Brick lining on both side of the road of M-150 bricks 7 cm. wide 11 cm. deep, laid with mud mortar including labour and Supply of bricks finished to the required template and in proper alignment and also including dressing and ramming the excavated earth as directed by the E/I S.I. No. 765
3.4
58118
197601.2
... More
BOE on edge dry i/c supply of all material labour and t&p etc required for proper completion of the work (SI NO 762 B)
270
386
104247
... More
Excavation in foundation in ordinary soil (Loam, Clay or Sand) Including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In-charge upto a distance of 30m from the foundation trenches. S.I. No. 251
8.81
89
784.97
... More
Concrete with 4 cm. stone ballast coarse sand nd cement in proportion of 8:4:1 in foundation and under floor and including supply of II material labour and T&P etc required for proper completion of the work. (S.I No. 281-275+273)
3.3
4475
14767.5
... More
M-150 Brick Work in 1:4 cement & Coarse sand in foundation and plinth including supply of all materials labour tools & plants etc S.I No. 305a
8.52
4643
39562.62
... More
Struck cement pointing with cement 1:2 cement and fine sand of 1.25 F.M mortar with colouring including supply of all materilas, labour T&P etc required for proper complection of the work S.I. No. 578
17.25
148
2561.63
... More
Plain cement concrect 1:2:4 C/sand 2 cm. Stone girt including supply all materials labour T&P etc S.I No. 279-A
0.21
5693
1195.53
... More
Supply & laying and fixing 350 m.m Dia NP3class R.C.C humepipe including joining etc complete. Ana
15
1399
20992.5
... More
Supplying & Fixing of retro reflective sign board with a corrosion resistant 4 mm thick aluminium composite panel (HIP type IV) as per approved design & drawing. Retro Reflective (HIP type IV) sign board warranty upto 7 years. Rate includes fabrication, supply of materials, transportation and erection of the signage structure for proper completion of work.
1
13390
13390
... More
(PART-B) The routine maintenance of above road work including earthen shoulder, bituminous pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years. (Including cost of materials T&P labour but excluding GST) for 1st Year maintenance cost@0.0%
1
-
-
... More
The routine maintenance of above road work including earthen shoulder, bituminous pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years. (Including cost of materials T&P labour but excluding GST) for 2nd Year maintenance cost@0.75%
1
66721
66721
... More
The routine maintenance of above road work including earthen shoulder, bituminous pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years. (Including cost of materials T&P labour but excluding GST) for 3rd Year maintenance cost@1.50%
1
133442
133442
... More
The routine maintenance of above road work including earthen shoulder, bituminous pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years. (Including cost of materials T&P labour but excluding GST) for 4th Year maintenance cost@2.25%
1
200164
200164
... More
The routine maintenance of above road work including earthen shoulder, bituminous pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years. (Including cost of materials T&P labour but excluding GST) for 5th Year maintenance cost@3.00%
1
266885
266885
... More
(PART-A) For 100 Metre Cement Concrete Road Work WBM Grading-3
Providing, laying, spreading and compacting 22.4-53 mm stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness , hand packing rolling with three wheel 80-100 kn static roller in crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required densityGrading 3 as per technical specification clause 405.(3)
22.5
3355
75489.75
... More
Construction of 2 cm gauge approved stone grit, coarse sand & cement in proporation of 1:1.5:3 in CC pavement cement coarse sand & fine aggregate mixture/plant of not less then 0.2 cum capacity & appropriate weight batcher using approced mix design, laid in approved fixed form work (Steel) channel) laying and fixing of 125 micron thick polyhene film. wedhes, steel plates including leveling the form work spreading the concrete with shovels rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including hassion clothe for curring of concrete pavements for not less then 14 days curring compound (where as specified) and water finishing to lines & grade including supply of all materilas, labour T&P etc required for proper complection of the work and also including complete shifting of recron 38 fibre reinforcement materilas New Item 9
45
7227
325246.5
... More
Excavation in foundation in ordinary soil (Loam, Clay or Sand) Including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In-charge upto a distance of 30m from the foundation trenches. S.I. No. 251
27
89
2405.7
... More
M-150 Brick Work in 1:4 cement & Coarse sand in foundation and plinth including supply of all materials labour tools & plants etc S.I No. 305a
13.8
4643
64080.3
... More
Plain cement concrect 1:2:4 C/sand 2 cm. Stone girt including supply all materials labour T&P etc S.I No. 279-A
2.3
5693
13093.9
... More
(PART-B) The routine maintenance of above road work including earthen shoulder, Cement Concrete PavementPavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years. (Including cost of materials T&P labour but excluding GST) for 1st Year maintenance cost@0.0%
1
-
-
... More
The routine maintenance of above road work including earthen shoulder,Cement Concrete Pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years. (Including cost of materials T&P labour but excluding GST) for 2nd Year maintenance cost@0.25%
1
1200
1200
... More
The routine maintenance of above road work including earthen shoulder, Cement Concrete Pavementetc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years. (Including cost of materials T&P labour but excluding GST) for 3rd Year maintenance cost@0.50%
1
2400
2400
... More
The routine maintenance of above road work including earthen shoulder, Cement Concrete Pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years. (Including cost of materials T&P labour but excluding GST) for 4th Year maintenance cost@0.75%
1
3602
3602
... More
The routine maintenance of above road work including earthen shoulder, Cement Concrete Pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years. (Including cost of materials T&P labour but excluding GST) for 5th Year maintenance cost@1.00%
1
4803
4803
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%