Rajya Krishi Utpadan Mandi Parishad Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Rajya Krishi Utpadan Mandi Parishad - RKUMP Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date3 Jan 2025
Closing Date22 Jan 2025
Tender Amount₹ 1,00,55,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
WBM Grading-3 Providing, laying, spreading and compacting 22.4-53 mm stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness , hand packing rolling with three wheel 80-100 kn static roller in crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required densityGrading 3 as per technical specification clause 405.(3)

765

3355

2566651.5

... More
Providing & applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502

10200

33

344760

... More
Providing & applying Tack coat with bitumen VG-10 grade using emulsion pressure distributor at the rate of 0.30 kg per sqm on the prepared granular surface treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503

10200

15

153000

... More
Providing laying and rolling of open-graded premix carpet of 20 mm thikness composed of 13.2 mm to 5.6 mm aggregates either usingpenetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either type C as per (Primixing work Machanical Means) Technical Specification clause 508

10200

157

1602420

... More
Providing & laying seal coat by manual means with VG-10 grade bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification clause 510

10200

61

624240

... More
Brick lining on both side of the road of M-150 bricks 7 cm. wide 11 cm. deep, laid with mud mortar including labour and Supply of bricks finished to the required template and in proper alignment and also including dressing and ramming the excavated earth as directed by the E/I S.I. No. 765

3.4

58118

197601.2

... More
BOE on edge dry i/c supply of all material labour and t&p etc required for proper completion of the work (SI NO 762 B)

270

386

104247

... More
Excavation in foundation in ordinary soil (Loam, Clay or Sand) Including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In-charge upto a distance of 30m from the foundation trenches. S.I. No. 251

8.81

89

784.97

... More
Concrete with 4 cm. stone ballast coarse sand nd cement in proportion of 8:4:1 in foundation and under floor and including supply of II material labour and T&P etc required for proper completion of the work. (S.I No. 281-275+273)

3.3

4475

14767.5

... More
M-150 Brick Work in 1:4 cement & Coarse sand in foundation and plinth including supply of all materials labour tools & plants etc S.I No. 305a

8.52

4643

39562.62

... More
Struck cement pointing with cement 1:2 cement and fine sand of 1.25 F.M mortar with colouring including supply of all materilas, labour T&P etc required for proper complection of the work S.I. No. 578

17.25

148

2561.63

... More
Plain cement concrect 1:2:4 C/sand 2 cm. Stone girt including supply all materials labour T&P etc S.I No. 279-A

0.21

5693

1195.53

... More
Supply & laying and fixing 350 m.m Dia NP3class R.C.C humepipe including joining etc complete. Ana

15

1399

20992.5

... More
Supplying & Fixing of retro reflective sign board with a corrosion resistant 4 mm thick aluminium composite panel (HIP type IV) as per approved design & drawing. Retro Reflective (HIP type IV) sign board warranty upto 7 years. Rate includes fabrication, supply of materials, transportation and erection of the signage structure for proper completion of work.

1

13390

13390

... More
(PART-B) The routine maintenance of above road work including earthen shoulder, bituminous pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years. (Including cost of materials T&P labour but excluding GST) for 1st Year maintenance cost@0.0%

1

-

-

... More
The routine maintenance of above road work including earthen shoulder, bituminous pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years. (Including cost of materials T&P labour but excluding GST) for 2nd Year maintenance cost@0.75%

1

66721

66721

... More
The routine maintenance of above road work including earthen shoulder, bituminous pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years. (Including cost of materials T&P labour but excluding GST) for 3rd Year maintenance cost@1.50%

1

133442

133442

... More
The routine maintenance of above road work including earthen shoulder, bituminous pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years. (Including cost of materials T&P labour but excluding GST) for 4th Year maintenance cost@2.25%

1

200164

200164

... More
The routine maintenance of above road work including earthen shoulder, bituminous pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years. (Including cost of materials T&P labour but excluding GST) for 5th Year maintenance cost@3.00%

1

266885

266885

... More
(PART-A) For 100 Metre Cement Concrete Road Work WBM Grading-3 Providing, laying, spreading and compacting 22.4-53 mm stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness , hand packing rolling with three wheel 80-100 kn static roller in crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required densityGrading 3 as per technical specification clause 405.(3)

22.5

3355

75489.75

... More
Construction of 2 cm gauge approved stone grit, coarse sand & cement in proporation of 1:1.5:3 in CC pavement cement coarse sand & fine aggregate mixture/plant of not less then 0.2 cum capacity & appropriate weight batcher using approced mix design, laid in approved fixed form work (Steel) channel) laying and fixing of 125 micron thick polyhene film. wedhes, steel plates including leveling the form work spreading the concrete with shovels rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including hassion clothe for curring of concrete pavements for not less then 14 days curring compound (where as specified) and water finishing to lines & grade including supply of all materilas, labour T&P etc required for proper complection of the work and also including complete shifting of recron 38 fibre reinforcement materilas New Item 9

45

7227

325246.5

... More
Excavation in foundation in ordinary soil (Loam, Clay or Sand) Including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In-charge upto a distance of 30m from the foundation trenches. S.I. No. 251

27

89

2405.7

... More
M-150 Brick Work in 1:4 cement & Coarse sand in foundation and plinth including supply of all materials labour tools & plants etc S.I No. 305a

13.8

4643

64080.3

... More
Plain cement concrect 1:2:4 C/sand 2 cm. Stone girt including supply all materials labour T&P etc S.I No. 279-A

2.3

5693

13093.9

... More
(PART-B) The routine maintenance of above road work including earthen shoulder, Cement Concrete PavementPavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years. (Including cost of materials T&P labour but excluding GST) for 1st Year maintenance cost@0.0%

1

-

-

... More
The routine maintenance of above road work including earthen shoulder,Cement Concrete Pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years. (Including cost of materials T&P labour but excluding GST) for 2nd Year maintenance cost@0.25%

1

1200

1200

... More
The routine maintenance of above road work including earthen shoulder, Cement Concrete Pavementetc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years. (Including cost of materials T&P labour but excluding GST) for 3rd Year maintenance cost@0.50%

1

2400

2400

... More
The routine maintenance of above road work including earthen shoulder, Cement Concrete Pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years. (Including cost of materials T&P labour but excluding GST) for 4th Year maintenance cost@0.75%

1

3602

3602

... More
The routine maintenance of above road work including earthen shoulder, Cement Concrete Pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years. (Including cost of materials T&P labour but excluding GST) for 5th Year maintenance cost@1.00%

1

4803

4803



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.