If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Rajya Krishi Utpadan Mandi Parishad - RKUMP Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date4 Jan 2025
Closing Date21 Jan 2025
Tender Amount₹ 60,25,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
WBM G-3 - Providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity as per technical specification clause 405

337.5

3220

1086750

... More
Excavation in foundation in ordinary soil

36

160

5760

... More
Concrete in 1:6:12 in foundation

12

3620

43440

... More
M 150 class brick work in 1:4 in foundation up to plinth

27.6

5410

149316

... More
Providing and laying of Rubber Moulded reflective Zig-Zag 80mm thick tiles of precast compressed C.C passing minimum 30mpa compressive strength ISI marked concrete block pavements having thickness 80mm as per technical specaification clause 1504

600

930

558000

... More
Brick edging on both sides of metalled surface 12 cm deep & 8 cm wide with class M-150 bricks laid on edge and dry in proper grade and alignment including cost of all material, labour and T&P etc.complete and all taxes as per direction of E/I.

1.3

80000

104000

... More
Providing and applying Primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.75 kg / sqm using mechanical means. As per technical specification clause 502 including cost of bitumen emulsion (SS-1)

3900

36

143910

... More
Providing and applying tack coat with bitumen (VG-10)using bitumen pressure distributor at the rate of 0.35kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Speicification Clause 503 including cost of bitumen (VG-10)

3900

19

75270

... More
Providing, laying and rolling of open-graded premix carpet of 20mm thickness composed of 13.2 to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line grade and level to serve as wearing coarse on a previously Prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100kN static roller capacity finished to required lavel and grades to be followed by seal coat as per Techincal Specification clause 508 including cost of bitumen

3900

188

733200

... More
Providing and applying seal coat type "C" comprising of a layer of bituminous binder followed by a cover of stone chipping of specified grading and rolling with power roller 8-10 tonne kN Static roller and finishing to required level and grades as per Technical Specification Clause 510 including cost of bitumen

3900

73

287820

... More
S/F of 350 mm dia Hume Pipe

37.5

1400

52500

... More
S/F of reflective sign board,etc

1

15000

15000

... More
The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 1 st year maintenance cost @ 0.0 %

1

-

-

... More
The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 0.75 %

1

34091

34091.84

... More
The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 1.50 %

1

68183

68183.68

... More
The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 2.25 %

1

102275

102275.52

... More
The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 3.00 %

1

136367

136367.35

... More
The routing maintenance of above road including earthen shoulder and Interlocking road etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 1ST year maintenance cost @ 0.00 %

1

-

-

... More
The routing maintenance of above road including earthen shoulder and Interlocking road etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 2ND year maintenance cost @ 0.25 %

1

2739

2739.73

... More
The routing maintenance of above road including earthen shoulder and Interlocking road etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 0.50 %

1

5479

5479.47

... More
The routing maintenance of above road including earthen shoulder and Interlocking road etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 4rd year maintenance cost @ 0.75 %

1

8219

8219.2

... More
The routing maintenance of above road including earthen shoulder and Interlocking road etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 1.00 %

1

10958

10958.93



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.