Rajya Krishi Utpadan Mandi Parishad Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Rajya Krishi Utpadan Mandi Parishad - RKUMP Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date3 Jan 2025
Closing Date24 Jan 2025
Tender Amount₹ 63,24,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing, laying, spreading and compacting stone aggregates of specific sizes (22.4-53 mm) obtained from approved query sukrut to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming type 'B' screening materials to fill up the interstices of coarse aggregate, watering and compacting to the required denstity. as per Technical specification clause.4.7/405(3) As per Analysis

303.75

2587

785801.25

... More
Providing and applying primer coat with bitumin emulsion (SS) on prepared surface of granular Base including clearing of road surface and and sprying primer at rate of 0.75 Kg/sqm ssing machenical means (MORD 502) As per Analysis

4050

36

146205

... More
Providing and applying tack coat with bitumin VG-10 using pressure disributor at rate of 0.35 kg per sqm on the prepared bituminous/granular surface cleaned with mechnical broom (MORD 503) As per Analysis

4050

15

61965

... More
Cleaning the existing W.B.M. surface and laying 2cm. Thick Premix carpet with appd. Grit (in ratio 1:2 with 10-16 mm & 16-22.4mm gauge with dalla Grit) and bitumen including neating the paint to required tamperature and mixing either in mixer or by hand including cartage of materials, maintenance of side, patries and watering them during operation including supply of all materials L.T.&P. required for proper completion of the work also including cost of maxphalt and back coat.As per Analysis

4050

174

707940

... More
Cleaning the premix carpet surface and laying seal coat with 6 mm Grit, including supply of all materials, Labour, T&P etc. required for proper completion of work.As per Analysis

4050

53

217890

... More
Brick adging on both side of rode m 150 8 cm wide 12 cm deep laid with mud mortar including all materail as per

1.35

82000

110700

... More
Supply and laying 350mm dia hume pipe

27.5

1600

44000

... More
Laying C.C. Road Slab consisting of 1:2:4 cement, coarse sand & approved 20mm gauge stone ballast, over prepared sub grade after its rectifications & bringing it to proper camber and including supply of all materials, labour T&P etc.

155.7

8300

1292310

... More
Excavation in foundation in black cotton soil including lift upto 1.5 m & lead upto 30 m including filling water ring ramming & Dressing of exvaled earth with trenches or into the spare between walls of foundation and removal of surplus earth as directed by E/I A.

73.5

110

8085

... More
Ist class brick in 4:1 fine sand and cement of 1.25 fineness modulus mortar in foundation & plinth including supply of all material labour and tools and plants etc. required for proper completion of work.

41.4

5190

214866

... More
Supply and laying of 125 micron polythene sheet under the foundation (for anti salt peter treatment) or over sub-base to act as separation between sub-base and conc. Slab (for C.C. raod slab), inculding including supply of all materials, L T&P etc. required for proper completion of the work.

900

56

50400

... More
Supply and Fixing one no. sign board as per approved desgine by HQ all complete etc. required for proper compeletion of the work. (AS PER APPROVED RATE HQ)

1

8000

8000

... More
P.C. Work The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 1st Year Maintenance Cost On Amount Rs. 4382423.90 @ 0.0 %

1

-

-

... More
The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 2nd Year Maintenance Cost On Amount Rs. 4382423.90 @ 1.00 %

1

43824

43824.24

... More
The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for Year Maintenance Cost On Amount Rs. 4382423.90 @ 1.50 %

1

65736

65736.36

... More
The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 4th Year Maintenance Cost On Amount Rs. 4382423.90 @ @ 2.00 %

1

87648

87648.48

... More
The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 5th Year Maintenance Cost On Amount Rs. 4382423.90 @ 3.00 %

1

131472

131472.72

... More
C.C. Work The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 1st Year Maintenance Cost On Amount Rs. 1565661.00 @ 0.00 %

1

-

-

... More
The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 2nd Year Maintenance Cost On Amount Rs. 1565661.00 @ 0.34 %

1

5323

5323.25

... More
The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 3rd Year Maintenance Cost On Amount Rs. 1565661.00 @ 0.50%

1

7828

7828.31

... More
The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 4th Year Maintenance Cost On Amount Rs. 1565661.00 @ 0.66 %

1

10333

10333.36

... More
The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 5th Year Maintenance Cost On Amount Rs. 1565661.00 @ 1%

1

15656

15656.61



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.