Rajya Krishi Utpadan Mandi Parishad Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Rajya Krishi Utpadan Mandi Parishad - RKUMP Tender
Civil And Construction
Road Construction
Eprocure
Opening Date24 Mar 2025
Closing Soon1 Apr 2025
Tender Amount₹ 23,64,464
Costs
EMD
₹ 2,56,000Document Cost
₹ 4,602Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_RKUMP_1013556_2Tender No
U.N.(N.)AYO/(NIVIDA)/202-807 Dated 04.03.2025Tender Authority
Rajya Krishi Utpadan Mandi Parishad ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Tender Notice No 858 Dated 22.03.2025
BOQ Items
... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70kg/sqm using mechanical means as per technical means 502. .
192
35
6892.8
... More
Providing and applying tack coat with bitumen VG-10 at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with hydraulic broom as per Technical specification clause 503
2400
16
40080
... More
Providing, laying and rollingof open graded mix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or imulsion to required line, grade and level to serve as wearing course on apreviously prepared base , including mixing in a suitable plant, laying and rolling with a three wheeled 80-100 KN static roller capacity, finished to required level and grades to be followed by seal coat of type C as per Technical specification clause 508
2400
197
473520
... More
Providing, and laying sealing the voids in a bituminous surface laid to the specified levels grade and cross fall using type C as per Technical specification clause 510
2400
71
170640
... More
Brick edging on both sides of the road with M-150 bricks 8 cm wide and 11.5 cm deep laid with mud mortar including cost of bricks all labour finished to be required template and in proper alignment T&P and also including dressing and ramming the excavated earth as per direction of Engineer in Charge. (SINo. 765)
0.1
81818
8181.8
... More
Supply & laying of 350 mm dia N.P.-3 R.C.C.Hume pipes with required collors including loading, unloading,cartage upto site.Including supply of all materials, labour and T&P etc. required for proper completion of work.as per direction of E/I.Jointing of pipes shall be with 1:2 cement and course sand mortor.
7.5
1900
14250
... More
Providing and fixing of Mild steel sign board as per drawing design including writing of details as specified by Engineer in charge. including supply of all materials, labour T&P, cartage upto site complete in all respect required for proper completion of the work and as per direction of E/I.
1
8000
8000
... More
Maintenance of Second Year (@ 2.00% )
1
19862
19862.49
... More
Maintenance of Third Year (@ 3.00% )
1
29793
29793.74
... More
Maintenance of Fourth Year (@ 4.00% )
1
39724
39724.99
... More
Maintenance of Fifth Year (@ 6.00% )
1
59587
59587.48
... More
Earth work in excavation in trenches for foundation and pipe, cable etc. in ordinary soil (Loan clay or sand) including lift upto 1.5 M lead upto 50 M and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by engineer in charge with in a lead of 50 Meter . I/C Royality (SI251)
23.4
120
2808
... More
Providing and laying cement concrete 1:6:12 (1 cement :6 fine sand :12 graded brick aggregate 40mm nominal size) including supply of all materials, labour, T&P, curing , cost of formwork complete in all respect in foundation and under floor (Si No 273)
12
4500
54000
... More
M-150 class brick work in 1:4 Cement and course sand mortar in foundation and plinth including supply of all materials labour and tools and plants etc. required for proper completion of the work. as per direction of Engineer in charge (SI No 6.1.1)
27.6
6267
172969.2
... More
Providind ,Laying of 125 micron polytheen over base of WBM surface etc including supply of all material
600
40
24000
... More
Providing & fixing of A.C. 6MM CORRUGATED
50
220
11000
... More
Laying C.C. Road slab 10 cm thick consisting of 1:1.5:3 cement, course sand and approved 2 cm gauge stone ballast over prepared sub grade after its rectifications and bringing its to proper camber and including supply of all material ….complete in all respect (SI No DAR 4.1.2)
120
7636
916320
... More
12 mm thick Plaster in 1:4 cement & coarse sand in cluding supply of all material etc required for proper completion of the work. as per direction of Engineer in charge
60
191
11460
... More
Maintenance of Second Year (@ 0.25% )
1
2981
2981.39
... More
Maintenance of Third Year (@ 0.50% )
1
5962
5962.79
... More
Maintenance of Fourth Year (@ 0.75% )
1
8944
8944.18
... More
Maintenance of Fifth Year (@ 1.00% )
1
11925
11925.57
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%